← Back
Three families
557 10 STREET
BROOKLYN · BIN 3026045
💬 Discuss this project
1882Year Built
3Stories
C0Building Class
R6BZoning
3,705 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · 1,793 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction34p · 1 filing · 20 docs
Floor 3Under Construction72p · 2 filings · 20 docs
Floor 2Under Construction67p · 2 filings · 20 docs
Floor 1Under Construction65p · 2 filings · 20 docs
CellarUnder Construction76p · 2 filings · 20 docs
1 job · most recent 03/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2026Permit IssuedBINDNER SPENCER CONSTRCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXSQ30TBVJU 34,000 BTU · Vrf Indoor ×4
RXTQ60TAVJU 57,000 BTU · Vrf Outdoor ×3
FXTQ30TAVJUA 30,000 BTU · Vrf Indoor ×1
FXTQ60TAVJUA 60,000 BTU · Vrf Indoor ×1
RZQ30PVJU 30,000 BTU · Vrf Outdoor ×1
Ventilation
Us Draft CB7-AA-FH 475 CFM · Exhaust Fan ×2
Daikin VAM300GVJU 300 CFM · Erv ×1
1 job · most recent 03/06/2026
Sprinkler System
FiledStatusContractorScope
03/06/2026Permit IssuedORBIT SPRINKLER CORPSprinkler System
1 job · most recent 03/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/06/2026Permit IssuedORBIT PLBG & HTG INCGas, Storm, Water/Sanitary
3 jobs · most recent 07/16/2025
General Wiring
FiledStatusContractorScope
07/16/2025Permit IssuedBRANDL ELECTRIC INC.General Wiring
04/26/2024CompleteMAC ELECT'L CONTR. INC.General Wiring
03/14/2023CompleteMAC ELECT'L CONTR. INC.General Wiring
1 job · most recent 03/06/2026
Steel Concrete Wood
FiledStatusContractorScope
03/06/2026Permit IssuedORBIT SPRINKLER CORPSteel, Concrete, Wood
Building Lifecycle
All (110)Filed (10)Permit Issued (8)Violation (19)Inspection (5)Objection (38)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
03/17/2026
Special inspection requirement — Final
CONNIE PISANI
03/17/2026
Special inspection requirement — Structural Wood Frame
CONNIE PISANI
03/17/2026
Special inspection requirement — Subgrade Inspections
CONNIE PISANI
03/17/2026
Special inspection requirement — Structural Cold-Formed Steel
CONNIE PISANI
03/17/2026
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
03/17/2026
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
03/17/2026
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
03/17/2026
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
03/16/2026
Special inspection requirement — Metering
CONNIE PISANI
03/16/2026
Special inspection requirement — Interior lighting power
CONNIE PISANI
03/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CONNIE PISANI
03/16/2026
Special inspection requirement — Insulation placement and R values
CONNIE PISANI
03/16/2026
Special inspection requirement — Fenestration areas
CONNIE PISANI
03/16/2026
Special inspection requirement — Fenestration air leakage
CONNIE PISANI
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CONNIE PISANI
03/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
CONNIE PISANI
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
03/16/2026
Special inspection requirement — Air barrier — testing
CONNIE PISANI
03/16/2026
Special inspection requirement — Air barrier - visual inspection
CONNIE PISANI
03/16/2026
Special inspection requirement — Maintenance information
ted kane
03/16/2026
Special inspection requirement — Permanent certificate
CONNIE PISANI
03/11/2026
Permit issued — Sprinklers
B01142249-S5-EW-SP
03/09/2026
Objection resolved — Addressed
03/06/2026
Filed — Alteration CO
Mechanical work as shown on plans filed herewith.
B01142249-P3
03/06/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
02/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/04/2026
Objection resolved — Addressed
01/16/2026
Filed — Alteration CO
Mechanical work as shown on plans filed herewith.
B01142249-P2
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Special inspection requirement — Maintenance information
ted kane
01/07/2026
Objection resolved — Addressed
01/07/2026
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/18/2025
Special inspection requirement — Structural Cold-Formed Steel
CONNIE PISANI
12/18/2025
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
12/18/2025
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CONNIE PISANI
12/18/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
12/16/2025
Objection raised — Zoning
12/16/2025
Objection raised — Scope
12/16/2025
Objection raised — Admin
12/16/2025
Objection raised — Structural
12/16/2025
Objection raised — Admin
12/16/2025
Objection raised — Energy
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
11/25/2025
Filed — Alteration CO
Mechanical work as shown on plans filed herewith.
B01142249-P1
11/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/19/2025
Violation issued (HPD, open)
I
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BINDNER SPENCER CONSTRUCTION LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/17/2024$3.5M—Private party → Private party$949/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KANE ARCHITECTURE AND URBAN DESIGN703/06/2026
FORUM ENGINNERING, P.C.310/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES1703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BINDNER SPENCER CONSTRCGeneral Contractor1204/09/2026
BRANDL ELECTRIC INC.Electrical103/22/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMARACON TESTING & INSPEC5842503/06/2026
FORUM ENGINEERING, P. C.907310/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedORBIT SPRINKLER CORP03/11/2026
DOB NOWMechanical SystemsPermit IssuedBINDNER SPENCER CONSTRC10/17/2025
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC09/02/2025
DOB NOWGeneral ConstructionPermit IssuedBINDNER SPENCER CONSTRC08/19/2025
DOB NOWStructuralPermit IssuedBINDNER SPENCER CONSTRC08/19/2025
DOB NOWGeneral ConstructionPermit IssuedBINDNER SPENCER CONSTRC08/19/2025
DOB NOWGeneral ConstructionPermit IssuedBINDNER SPENCER CONSTRC06/01/2025
DOB NOWStructuralPermit IssuedBINDNER SPENCER CONSTRC06/01/2025
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
03/17/2026FinalCONNIE PISANIprogress
03/17/2026Structural Wood FrameCONNIE PISANIprogress
03/17/2026Subgrade InspectionsCONNIE PISANIspecial
03/17/2026Structural Cold-Formed SteelCONNIE PISANIspecial
03/17/2026Concrete - Cast-In-PlaceCONNIE PISANIspecial
03/17/2026Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
03/17/2026Structural Steel - DetailsCONNIE PISANIspecial
03/17/2026Post-installed AnchorsCONNIE PISANIspecial
03/17/2026Structural Steel - WeldingCONNIE PISANIspecial
03/16/2026MeteringCONNIE PISANIenergy_progress
03/16/2026Interior lighting powerCONNIE PISANIenergy_progress
03/16/2026Fenestration and door U-factor and product ratingsCONNIE PISANIenergy_progress
03/16/2026Insulation placement and R valuesCONNIE PISANIenergy_progress
03/16/2026Fenestration areasCONNIE PISANIenergy_progress
03/16/2026Fenestration air leakageCONNIE PISANIenergy_progress
03/16/2026Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
03/16/2026Fire-Resistant Penetrations and JointsCONNIE PISANIspecial
03/16/2026Fire-Resistance Rated ConstructionCONNIE PISANIprogress
03/16/2026Energy Code Compliance InspectionsCONNIE PISANIprogress
03/16/2026Air barrier — testing CONNIE PISANIenergy_progress
03/16/2026Air barrier - visual inspectionCONNIE PISANIenergy_progress
03/16/2026Maintenance informationted kaneenergy_progress
03/16/2026Permanent certificateCONNIE PISANIenergy_progress
02/17/2026Structural Stability – Alterations of existing buildingsCONNIE PISANIspecial
01/16/2026Maintenance informationted kaneenergy_progress
Latest 25 of 53.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/22/2026B01171126-I1Request digital key ↗
08/22/2026B01171126-P1Request digital key ↗
08/18/2026B01142249-S3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/22/2026B01171126-I1Open ↗
08/13/2026B01142249-S2Open ↗
08/13/2026B01142249-P3Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature13
09/20/2026B01142249-P1Open ↗
09/20/2026B01142249-P1Open ↗
09/20/2026B01142249-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/22/2026B01171126-I1Open ↗
08/18/2026B01142249-P3Open ↗
08/18/2026B01142249-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B01142249-S5Open ↗
09/23/2026B01142249-S5Open ↗
09/20/2026B01142249-P1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01142249-I1Open ↗
08/13/2026B01142249-P1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026B01171126-I1Open ↗
08/18/2026B01142249-P3Open ↗
08/18/2026B01142249-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/18/2026B01142249-S5Open ↗
08/18/2026B01142249-S3Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B01142249-P3Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/18/2026B01142249-I1Open ↗
08/18/2026B01142249-P1Open ↗