← Back
Walk-up cooperative
41 PROSPECT PARK SW
BROOKLYN · BIN 3026782
💬 Discuss this project
1920Year Built
4Stories
C6Building Class
R6AZoning
17,324 sfGross Floor Area
20Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: PLEDGE REALTY CORP · 5,185 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLEDGE REALTY1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOORE ASSOCIATES, LLC312/19/2022
BAILEYS ENGINEERING PC104/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor203/21/2026
NASTASI PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MOORE ASSOCIATES, LLC3408312/19/2022
Building Lifecycle
All (63)Filed (4)Permit Issued (2)Signed Off (2)Violation (46)Inspection (5)Special Inspection (4)
11/19/2025
Violation issued (HPD, closed)
I
07/22/2024
Violation issued (HPD, closed)
A
07/22/2024
Violation issued (HPD, closed)
C
07/22/2024
Violation issued (HPD, closed)
B
07/18/2024
Violation issued (HPD, closed)
B
07/18/2024
Violation issued (HPD, closed)
B
07/18/2024
Violation issued (HPD, closed)
C
04/11/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/20/2023
Signed off — Alteration
INSTALLATION OF WASHER & DRYERS AND ASSOCIATED WATER, SANITARY & SPRINKLER PIPING FOR ACCESSORY USE BY BUILDING TENANTS AT CELLAR LEVEL.
B00590360-I1
03/02/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
03/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/18/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES MOORE
12/21/2022
Special inspection requirement — Energy Code Compliance Inspections
JAMES MOORE
12/19/2022
Filed — Alteration
INSTALLATION OF WASHER & DRYERS AND ASSOCIATED WATER, SANITARY & SPRINKLER PIPING FOR ACCESSORY USE BY BUILDING TENANTS AT CELLAR LEVEL.
B00590360-P2
11/22/2022
Permit issued — Plumbing
B00590360-I1-PL
11/10/2022
Filed — Alteration
INSTALLATION OF WASHER & DRYERS AND ASSOCIATED WATER, SANITARY & SPRINKLER PIPING FOR ACCESSORY USE BY BUILDING TENANTS AT CELLAR LEVEL.
B00590360-P1
11/09/2022
Violation issued (HPD, closed)
I
11/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES MOORE
11/09/2022
Special inspection requirement — Energy Code Compliance Inspections
JAMES MOORE
09/14/2022
Filed — Alteration
INSTALLATION OF WASHER & DRYERS AND ASSOCIATED WATER, SANITARY & SPRINKLER PIPING FOR ACCESSORY USE BY BUILDING TENANTS AT CELLAR LEVEL.
B00590360-I1
08/29/2019
Signed off — Alteration
B00150031-I1
07/22/2019
Violation issued (ECB, closed)
Construction
05/17/2019
Violation issued (ECB, closed)
Construction
04/09/2019
Permit issued — Sidewalk Shed
B00150031-I1-SH
04/08/2019
Filed — Alteration
B00150031-I1
04/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2019
Violation issued (ECB, closed)
Construction
11/28/2017
Violation issued (HPD, closed)
I
02/17/2017
Violation issued (HPD, open)
B
02/17/2017
Violation issued (HPD, closed)
B
02/17/2017
Violation issued (HPD, closed)
A
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/08/2014
Violation issued (ECB, closed)
Boilers
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/09/2008
Violation issued (HPD, closed)
B
07/09/2008
Violation issued (HPD, closed)
A
11/08/2007
Violation issued (HPD, open)
B
03/05/2007
Violation issued (HPD, closed)
B
03/05/2007
Violation issued (HPD, closed)
B
03/05/2007
Violation issued (HPD, closed)
A
10/24/2006
Violation issued (HPD, closed)
B
05/25/2001
Violation issued (HPD, open)
B
05/25/2001
Violation issued (HPD, open)
B
05/25/2001
Violation issued (HPD, open)
B
05/25/2001
Violation issued (HPD, open)
B
05/25/2001
Violation issued (HPD, open)
B
05/25/2001
Violation issued (HPD, open)
B
05/25/2001
Violation issued (HPD, open)
B
05/25/2001
Violation issued (HPD, open)
B
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/1994
Violation issued (HPD, closed)
B
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNASTASI PLBG & HTG INC11/22/2022
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL04/09/2019
BISOTISSUEDTHE DEMAR GEN'L CONSTR LT04/16/2019
BISBLISSUEDJOHN HLAD PLBG & PLBG01/22/2007
5 projects · most recent 10/27/2025
General Wiring
FiledStatusContractorScope
10/27/2025CompleteD & W ELECTRICAL CONT CORGeneral Wiring
09/29/2025CompleteD & W ELECTRICAL CONT CORGeneral Wiring
11/30/2023Permit IssuedD & W ELECTRICAL CONT CORGeneral Wiring
07/13/2022CompleteOPTIMAL ELECTRIC, INC—
04/05/2019CompleteOPTIMAL ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/02/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/18/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
12/21/2022Fire-Resistant Penetrations and JointsJAMES MOOREspecial
12/21/2022Energy Code Compliance InspectionsJAMES MOOREprogress
11/09/2022Fire-Resistant Penetrations and JointsJAMES MOOREspecial
11/09/2022Energy Code Compliance InspectionsJAMES MOOREprogress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/28/2026B00590360-I1Request digital key ↗
08/28/2026B00590360-P1Request digital key ↗
08/28/2026B00590360-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00150031-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
01/12/2023321955443Open ↗
09/06/2022321955443Open ↗
08/23/2022321955443Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
07/26/2019321955443Open ↗
04/17/2019321955443Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026B00150031-I1Open ↗
08/28/2026B00590360-P2Open ↗
08/28/2026B00590360-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B00590360-P1Open ↗
08/23/2026B00590360-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00590360-P1Open ↗
08/23/2026B00590360-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/16/2019321955443Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/16/2019321955443Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/16/2019321955443Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
04/16/2019321955443Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026B00590360-P1Open ↗
08/28/2026B00590360-I1Open ↗
08/28/2026B00590360-P2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/16/2019321955443Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS1
08/04/2022321955443Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/04/2022321955443Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/11/2023321955443Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/16/2019321955443Open ↗
▸Inspections & Test Reports2
▸BISMASONRY1
08/04/2022321955443Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/04/2022321955443Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/13/2023321955443Open ↗
▸BISFINAL1
08/04/2022321955443Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
08/12/2022321955443Open ↗
08/04/2022321955443Open ↗
04/16/2019321955443Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/11/2023321955443Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/16/2019321955443Open ↗
▸Other Documents1
▸BISMAINTENANCE INFORMATION1
08/04/2022321955443Open ↗