← Back
Auto body / collision or auto repair
858 ATLANTIC AVENUE
BROOKLYN · BIN 3027468
💬 Discuss this project
1930Year Built
1Stories
G2Building Class
C6-3AZoning
2,700 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Auto body / collision or auto repair · Owner of record: 858 ATLANTIC DEVELOPMENT LLC · 2,700 sf lot · 1 FAR built · Flood zone X
Locations of Work
Roof2p · 1 filing · 4 docs
Floor 13p · 1 filing · 4 docs
1 job · most recent 08/18/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
— RXTA36AAVJU 34,200 BTU · Heat Pump Outdoor ×18
RXTA24AAVJU 23,000 BTU · Heat Pump Outdoor ×12
RZA18AAVJU 18,000 BTU · Heat Pump Outdoor ×10
RXTA48AAVJU 45,500 BTU · Split System ×1
Heating
— RXTA36AAVJU 37,000 BTU · Heat Pump Outdoor ×18
RXTA24AAVJU 25,800 BTU · Heat Pump Outdoor ×12
RZA18AAVJU 20,000 BTU · Heat Pump Outdoor ×10
RXTA48AAVJU 46,000 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck ERV-10-20H-VG 625 CFM · Erv ×1
MINIVENT-450-VG 210 CFM · Erv ×1
1 job · most recent 08/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/18/2026——Storm, Water/Sanitary
2 jobs · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
06/24/2026Permit IssuedPOWER DIRECT ELECTRIC INC38 meters, 38 new_meters
1 job · most recent 08/18/2026
FiledStatusContractorScope
08/18/2026——3 scope_items
1 job · most recent 08/18/2026
Fence
FiledStatusContractorScope
08/18/2026——Fence
Building Lifecycle
All (61)Filed (9)Violation (2)Objection (20)Special Inspection (30)
08/18/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-S3
08/18/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-S4
08/17/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-S2
08/17/2026
Special inspection requirement — Masonry
08/17/2026
Special inspection requirement — Subgrade Inspections
08/17/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
08/17/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
08/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
08/17/2026
Special inspection requirement — Structural Steel - Welding
08/17/2026
Special inspection requirement — Subgrade Inspections
08/17/2026
Special inspection requirement — Post-installed Anchors
08/17/2026
Special inspection requirement — Post-installed Anchors
08/17/2026
Special inspection requirement — Structural Steel - Details
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
08/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/17/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
08/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/12/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-S7
08/12/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-S6
08/12/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-S1
08/12/2026
Special inspection requirement — Post-installed Anchors
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/12/2026
Special inspection requirement — Shutoff dampers
08/12/2026
Special inspection requirement — Maintenance information
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/12/2026
Special inspection requirement — Post-installed Anchors
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/11/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-S5
08/11/2026
Special inspection requirement — Mechanical Systems
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/11/2026
Special inspection requirement — Maintenance information
07/30/2026
Objection resolved — Resolved
07/21/2026
Objection raised — Other
07/03/2026
Filed — Full Demolition
Full demolition of a one (1) story building with cellar
B01422847-I1
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/31/2026
Objection resolved — Resolved
03/27/2026
Objection raised — Other
03/27/2026
Objection raised — Other
03/27/2026
Objection raised — Structural
03/27/2026
Objection raised — Zoning
03/27/2026
Objection raised — Zoning
03/27/2026
Objection raised — Other
03/27/2026
Objection raised — Energy
03/27/2026
Objection raised — Other
03/27/2026
Objection raised — Zoning
03/05/2026
Filed — New Building
PROPOSED NEW 15 STORY + CELLAR RESIDENTIAL USE BUILDING, 36 DWELLING UNITS
B01364772-I1
10/26/2019
Violation issued (FDNY_NOV, closed)
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKAWAWY EQUITIES NY609/25/2026
WAGSTONE CAPITAL203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/21/2015$1.4M—— → —$519/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELEVATED ENGINEERING NYC308/18/2026
VASILIOS ARTEMIOU PE308/12/2026
BAOBAB ARCHITECTS P.C.208/12/2026
ADROIT ENGINEERING PLLC107/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ELLIPSES DESIGN103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADROIT ENGINEERING PLLC8885107/03/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDN/A03/05/1997
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
08/17/2026Post-installed Anchors—special
08/17/2026Structural Steel - Welding—special
08/17/2026Concrete - Cast-In-Place—special
08/17/2026Construction Operations Influencing Adjacent Structures—special
08/17/2026Masonry—special
08/17/2026Post-installed Anchors—special
08/17/2026Subsurface Investigations (Borings/Test Pits)—special
08/17/2026Subgrade Inspections—special
08/17/2026Concrete - Cast-In-Place—special
08/17/2026Construction Operations Influencing Adjacent Structures—special
08/17/2026Construction Operations Influencing Adjacent Structures—special
08/17/2026Excavations - Sheeting, Shoring, and Bracing—special
08/17/2026Structural Steel - Details—special
08/17/2026Subgrade Inspections—special
08/17/2026Subsurface Investigations (Borings/Test Pits)—special
08/12/2026Fire-Resistant Penetrations and Joints—special
08/12/2026Post-installed Anchors—special
08/12/2026Fire-Resistant Penetrations and Joints—special
08/12/2026Energy Code Compliance Inspections—progress
08/12/2026HVAC-R and service water piping design and insulation—energy_progress
08/12/2026HVAC-R and service water heating system controls—energy_progress
08/12/2026Duct leakage testing, insulation and design—energy_progress
08/12/2026Maintenance information—energy_progress
08/12/2026Shutoff dampers—energy_progress
08/12/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 63.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/18/2026B01364772-S5Request digital key ↗
08/18/2026B01364772-S2Request digital key ↗
08/18/2026B01364772-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026B01364772-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01364772-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/18/2026B01364772-S2Open ↗
08/18/2026B01364772-S1Open ↗
08/18/2026B01364772-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01364772-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/18/2026B01364772-I1Open ↗
08/15/2026B01422847-I1Open ↗
▸DOB NOWStructure Photographs1
08/15/2026B01422847-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01364772-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01364772-I1Open ↗