| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/18/2026 | — | — | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling — RXTA36AAVJU 34,200 BTU · Heat Pump Outdoor ×18 RXTA24AAVJU 23,000 BTU · Heat Pump Outdoor ×12 RZA18AAVJU 18,000 BTU · Heat Pump Outdoor ×10 RXTA48AAVJU 45,500 BTU · Split System ×1 Heating — RXTA36AAVJU 37,000 BTU · Heat Pump Outdoor ×18 RXTA24AAVJU 25,800 BTU · Heat Pump Outdoor ×12 RZA18AAVJU 20,000 BTU · Heat Pump Outdoor ×10 RXTA48AAVJU 46,000 BTU · Heat Pump Outdoor ×1 Ventilation |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/24/2026 | Permit Issued | POWER DIRECT ELECTRIC INC | General Wiring |
| 06/24/2026 | Permit Issued | POWER DIRECT ELECTRIC INC | 38 meters, 38 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | 3 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | Fence |
| Owner | Filings | Most Recent |
|---|---|---|
| ROCKAWAWY EQUITIES NY | 6 | 09/25/2026 |
| WAGSTONE CAPITAL | 2 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 09/21/2015 | $1.4M | — | — → — | $519/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| ELEVATED ENGINEERING NYC | 3 | 08/18/2026 |
| VASILIOS ARTEMIOU PE | 3 | 08/12/2026 |
| BAOBAB ARCHITECTS P.C. | 2 | 08/12/2026 |
| ADROIT ENGINEERING PLLC | 1 | 07/03/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| ELLIPSES DESIGN | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ADROIT ENGINEERING PLLC | 8885 | 1 | 07/03/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| BIS | — | ISSUED | N/A | 03/05/1997 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | Post-installed Anchors | — | special |
| 08/17/2026 | Structural Steel - Welding | — | special |
| 08/17/2026 | Concrete - Cast-In-Place | — | special |
| 08/17/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 08/17/2026 | Masonry | — | special |
| 08/17/2026 | Post-installed Anchors | — | special |
| 08/17/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 08/17/2026 | Subgrade Inspections | — | special |
| 08/17/2026 | Concrete - Cast-In-Place | — | special |
| 08/17/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 08/17/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 08/17/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 08/17/2026 | Structural Steel - Details | — | special |
| 08/17/2026 | Subgrade Inspections | — | special |
| 08/17/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/12/2026 | Post-installed Anchors | — | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/12/2026 | Energy Code Compliance Inspections | — | progress |
| 08/12/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 08/12/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/12/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 08/12/2026 | Maintenance information | — | energy_progress |
| 08/12/2026 | Shutoff dampers | — | energy_progress |
| 08/12/2026 | HVAC-R and service water heating equipment | — | energy_progress |