BROOKLYN
656 WASHINGTON AVENUE
BROOKLYN · BIN 3027949
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Architecture
Roof4p · 2 filings · 10 docs
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DECATUR PARTNERS109/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC ARCHITECTURE + DESIGN STUDIO208/24/2026
SOUTH BAY ENGINEERING PLLC107/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOUTH BAY ENGINEERING PLL6682107/15/2026
Building Lifecycle
All (28)Filed (3)Objection (3)Special Inspection (22)
08/26/2026
Objection resolved — Resolved
08/24/2026
Filed — New Building
PROPOSED NB 2-STORY COMMUNITY FACILITY BUILDING WITHOUT SLEEPING ACCOMMODATIONS ( HOUSE OF WORSHIP) AS PART OF ONE ZONING LOT COMPRISED OF TWO TAX LOTS, IN CONJUNCTION WITH NB APPLICATION FOR A 7-STORY BUILDING (B01358059-I1).
B01355039-S1
08/04/2026
Objection raised — Other
07/31/2026
Special inspection requirement — Air barrier continuity plan testing
07/31/2026
Special inspection requirement — Permanent certificate
07/31/2026
Special inspection requirement — Vestibules
07/15/2026
Filed — Full Demolition
Full demolition to a one story building
B01407645-I1
07/15/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Chris Sanders
06/22/2026
Objection raised — Other
05/20/2026
Filed — New Building
PROPOSED NB 2-STORY COMMUNITY FACILITY BUILDING WITHOUT SLEEPING ACCOMMODATIONS ( HOUSE OF WORSHIP) AS PART OF ONE ZONING LOT COMPRISED OF TWO TAX LOTS, IN CONJUNCTION WITH NB APPLICATION FOR A 7-STORY BUILDING (B01358059-I1).
B01355039-I1
05/19/2026
Special inspection requirement — Combustible Exterior Wall Coverings
05/19/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
02/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/16/2026
Special inspection requirement — Lighting controls
02/16/2026
Special inspection requirement — Metering
02/16/2026
Special inspection requirement — Fenestration areas
02/16/2026
Special inspection requirement — Air barrier - visual inspection
02/16/2026
Special inspection requirement — Interior lighting power
02/16/2026
Special inspection requirement — Protection of exposed foundation insulation
02/16/2026
Special inspection requirement — Insulation placement and R values
02/16/2026
Special inspection requirement — Exterior lighting power
02/16/2026
Special inspection requirement — Air barrier — testing
02/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/16/2026
Special inspection requirement — Maintenance information
02/16/2026
Special inspection requirement — Fenestration air leakage
02/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/16/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
02/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/31/2026Air barrier continuity plan testing—energy_progress
07/31/2026Permanent certificate—energy_progress
07/31/2026Vestibules—energy_progress
07/15/2026Structural Stability – Alterations of existing BuildingsChris Sandersspecial
05/19/2026Combustible Exterior Wall Coverings—special
05/19/2026Wall Panels, Curtain Walls, and Veneers—special
02/16/2026Fire-Resistance Rated Construction—progress
02/16/2026Lighting controls—energy_progress
02/16/2026Metering—energy_progress
02/16/2026Fenestration areas—energy_progress
02/16/2026Air barrier - visual inspection—energy_progress
02/16/2026Interior lighting power—energy_progress
02/16/2026Protection of exposed foundation insulation—energy_progress
02/16/2026Insulation placement and R values—energy_progress
02/16/2026Exterior lighting power—energy_progress
02/16/2026Air barrier — testing —energy_progress
02/16/2026Fenestration and door U-factor and product ratings—energy_progress
02/16/2026Maintenance information—energy_progress
02/16/2026Fenestration air leakage—energy_progress
02/16/2026Fire-Resistant Penetrations and Joints—special
02/16/2026Exterior Insulation and Finish Systems (EIFS)—special
02/16/2026Energy Code Compliance Inspections—progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B01407645-I1Request digital key ↗
08/14/2026B01355039-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01355039-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01355039-I1Open ↗
08/16/2026B01407645-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B01407645-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/15/2026B01407645-I1Open ↗
▸DOB NOWStructure Photographs1
08/15/2026B01407645-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01355039-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01355039-I1Open ↗