← Back
Three families
628 GRAND AVENUE
BROOKLYN · BIN 3028595
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
2,916 sfGross Floor Area
3Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 628 GRAND AVE OWNERS LLC · 2,730 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
Plumbing
Bulkhead1p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 20 docs
1 job · most recent 12/27/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/27/2023——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUMY-HP36NKMU1 36,000 BTU · Vrf Outdoor ×2
PUMY-HP48NKMU1 48,000 BTU · Vrf Outdoor ×2
PUMY-P60NKMU3-BS 60,000 BTU · Vrf Outdoor ×1
1 job · most recent 12/27/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/27/2023——Gas, Storm, Water/Sanitary
1 job · most recent 12/27/2023
Steel Concrete Masonry
FiledStatusContractorScope
12/27/2023——Steel, Concrete, Masonry
Building Lifecycle
All (90)Filed (2)Violation (29)Objection (41)Special Inspection (18)
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
05/15/2024
Objection raised — Structural
05/15/2024
Objection raised — Structural
04/10/2024
Violation issued (HPD, open)
A
02/27/2024
Objection resolved — Addressed
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Resolved
02/09/2024
Objection resolved — Addressed
12/28/2023
Objection raised — Scope
12/28/2023
Objection raised — Inspections
12/28/2023
Objection raised — Other
12/28/2023
Objection raised — Admin
12/28/2023
Objection raised — Admin
12/28/2023
Objection raised — Inspections
12/28/2023
Objection raised — Mechanical
12/28/2023
Objection raised — Scope
12/27/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and gas scope associated with Alteration Type 1
B00931501-S3
12/20/2023
Objection raised — Fire_Protection
12/20/2023
Objection raised — Mechanical
12/20/2023
Objection raised — Zoning
12/20/2023
Objection raised — Zoning
12/20/2023
Objection raised — Fire_Protection
12/20/2023
Objection raised — Fire_Protection
12/20/2023
Objection raised — Fire_Protection
12/20/2023
Objection raised — Structural
12/20/2023
Objection raised — Other
12/20/2023
Objection raised — Fire_Protection
12/20/2023
Objection raised — Scope
12/20/2023
Objection raised — Mechanical
12/18/2023
Objection raised — Zoning
12/18/2023
Objection raised — Zoning
12/18/2023
Objection raised — Zoning
11/22/2023
Violation issued (HPD, open)
I
11/21/2023
Special inspection requirement — Post-installed Anchors
Gene Hu
11/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Gene Hu
11/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
Gene Hu
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gene Hu
10/25/2023
Special inspection requirement — Fenestration areas
Jonathan Man
10/18/2023
Objection raised — Zoning
10/18/2023
Objection raised — Fire_Protection
10/13/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
Plumbing and gas scope associated with Alteration Type 1
B00931501-I1
09/14/2023
Special inspection requirement — Metering
Jonathan Man
09/14/2023
Special inspection requirement — Lighting in dwelling units
Jonathan Man
09/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Jonathan Man
09/14/2023
Special inspection requirement — Maintenance information
Jonathan Man
09/14/2023
Special inspection requirement — Air barrier - visual inspection
Jonathan Man
09/14/2023
Special inspection requirement — Insulation placement and R values
Jonathan Man
Latest 60 of 90 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
628 GRAND AVE OWNERS LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HYKE ENGINEERING & MANAGEMENT PC112/27/2023
MAN ARCHITECTURE PC110/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MAN ARCHITECTURE203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HYKE ENGINEERING & MANAGE2422112/27/2023
GROUP PROJECTS ARCHITECTU7696110/13/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/21/2023Post-installed AnchorsGene Huspecial
11/21/2023HVAC-R and service water piping design and insulationGene Huenergy_progress
11/21/2023HVAC-R and service water heating system controlsGene Huenergy_progress
11/21/2023Fire-Resistant Penetrations and JointsGene Huspecial
10/25/2023Fenestration areasJonathan Manenergy_progress
09/14/2023MeteringJonathan Manenergy_progress
09/14/2023Lighting in dwelling unitsJonathan Manenergy_progress
09/14/2023Fenestration and door U-factor and product ratingsJonathan Manenergy_progress
09/14/2023Maintenance informationJonathan Manenergy_progress
09/14/2023Air barrier - visual inspectionJonathan Manenergy_progress
09/14/2023Insulation placement and R valuesJonathan Manenergy_progress
09/14/2023Lighting controlsJonathan Manenergy_progress
09/14/2023Exterior lighting powerJonathan Manenergy_progress
09/14/2023Interior lighting powerJonathan Manenergy_progress
09/14/2023Fenestration air leakageJonathan Manenergy_progress
09/13/2023Fire-Resistance Rated ConstructionJonathan Manprogress
09/13/2023Fire-Resistant Penetrations and JointsJonathan Manspecial
09/13/2023Energy Code Compliance InspectionsJonathan Manprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026B00931501-I1Request digital key ↗
08/15/2026B00931501-S3Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00931501-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00931501-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature12
08/30/2026B00931501-I1Open ↗
08/30/2026B00931501-I1Open ↗
08/30/2026B00931501-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00931501-S3Open ↗
08/26/2026B00931501-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026B00931501-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B00931501-S3Open ↗
08/13/2026B00931501-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/15/2026B00931501-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00931501-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00931501-I1Open ↗