← Back
Primarily 2 family with 1 store or office
768 WASHINGTON AVENUE
BROOKLYN · BIN 3029235
💬 Discuss this project
1901Year Built
3Stories
S2Building Class
R6AZoning
3,136 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,073 sf lot · 2.92 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction1 filing · 3 docs
Floor 2Under Construction1 filing · 3 docs
Floor 1Under Construction1 filing · 3 docs
CellarUnder Construction1p · 2 filings · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIRO STUDIO LLC109/09/2026
KEVIN KENDALL106/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI DIO ARCHITECTURE, PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAROLLI PLMNG AND HTG INCPlumbing109/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503109/09/2026
KENDALL ENGINEERING PC4154106/12/2023
Building Lifecycle
All (11)Filed (2)Permit Issued (1)Violation (6)Special Inspection (2)
09/16/2026
Permit issued — Plumbing
B01451725-I1-PL
09/09/2026
Filed — Alteration
New boiler and hot water heaters, gas stove and gas stove removal, new steam table gas piping.
B01451725-I1
08/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
06/12/2023
Filed — Alteration
B00877799-I1
06/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KEVIN KENDALL
11/17/2022
Violation issued (HPD, open)
I
03/17/2022
Violation issued (HPD, open)
I
04/21/2021
Violation issued (HPD, open)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBAROLLI PLMNG AND HTG INC09/16/2026
1 project · most recent 09/09/2026
Gas
FiledStatusContractorScope
09/09/2026Permit IssuedBAROLLI PLMNG AND HTG INCGas
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/30/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/06/2023Fire-Resistant Penetrations and JointsKEVIN KENDALLspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/15/2026B01451725-I1Request digital key ↗
08/27/2026B00877799-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/15/2026B01451725-I1Open ↗
08/27/2026B00877799-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026B00877799-I1Open ↗
09/23/2026B01451725-I1Open ↗