← Back
Elevator apt, semi-fireproof without stores
540 ST JOHNS PLACE
BROOKLYN · BIN 3029579
💬 Discuss this project
1931Year Built
6Stories
D1Building Class
R7AZoning
46,963 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized76 Open Violations 73 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: CLASSON PROSPECT INC · 10,274 sf lot · 4.57 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipment
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 6 docs
CellarUnder Construction5p · 1 filing · 13 docs
1 job · most recent 07/13/2026
Gas
FiledStatusContractorScope
07/13/2026Permit IssuedBELL FUEL OIL, LLCGas
1 job · most recent 06/22/2026
FiledStatusContractorScope
06/22/2026Permit IssuedMAC ELECT'L CONTR. INC.—
Building Lifecycle
All (83)Filed (6)Permit Issued (3)Signed Off (1)Violation (60)Objection (6)Special Inspection (7)
07/29/2026
Permit issued — Plumbing
B01418589-S1-PL
07/13/2026
Filed — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BURNER.
B01418589-S1
07/13/2026
Filed — Alteration
CONNECT EXISTING GAS PIPING TO REPLACEMENT BURNER.
B01418589-I1
07/07/2026
Violation issued (ECB, open)
Elevators
06/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/18/2026
Special inspection requirement — Heating Systems
LOUIS ARENA
06/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/18/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
06/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
05/15/2025
Filed — Alteration
B01211123-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/21/2024
Permit issued — Suspended Scaffold
B01095802-I1-SC
08/13/2024
Filed — Alteration
Suspended scaffold installation and use as per plans filed herewith.
B01095802-I1
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2024
Violation issued (HPD, closed)
A
03/14/2024
Filed — Alteration
brick replacement and spot pointing as per plan. no change in use, egress or occupancy with this application.
B01004352-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (HPD, open)
B
12/01/2023
Violation issued (HPD, open)
B
12/01/2023
Violation issued (HPD, closed)
C
12/01/2023
Violation issued (HPD, closed)
C
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (HPD, closed)
C
12/01/2023
Violation issued (HPD, closed)
C
12/01/2023
Violation issued (HPD, open)
B
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/31/2023
Signed off — Alteration
Removal and installation of antennas and RRUs on the roof. Installation of cable tray step over on the roof. All work is in compliance with TPPN5/98. No change in use, egress, or occupancy.
B00628054-I1
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Violation issued (HPD, closed)
A
02/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/10/2023
Permit issued — Antenna
B00628054-I1-AN
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/30/2022
Violation issued (HPD, closed)
C
11/30/2022
Violation issued (HPD, open)
C
11/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/10/2022
Violation issued (ECB, open)
Elevators
03/02/2022
Violation issued (HPD, closed)
A
02/28/2022
Objection resolved — Addressed
02/10/2022
Objection resolved — Addressed
02/10/2022
Objection resolved — Addressed
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/05/2022
Objection raised — 1998-AN AC 28-103.14.1-Adminis
01/05/2022
Objection raised — 1998-AN AC 28-103.14.1-TPPN-98
01/05/2022
Objection raised — 2014-AN AC 28-104.7.1-Administ
01/03/2022
Filed — Alteration
Removal and installation of antennas and RRUs on the roof. Installation of cable tray step over on the roof. All work is in compliance with TPPN5/98. No change in use, egress, or occupancy.
B00628054-I1
12/02/2021
Violation issued (FDNY_ORDER, closed)
12/02/2021
Violation issued (FDNY_NOV, closed)
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/17/2021
Violation issued (HPD, closed)
C
11/17/2021
Violation issued (HPD, closed)
C
11/17/2021
Violation issued (HPD, closed)
B
11/17/2021
Violation issued (HPD, closed)
B
11/17/2021
Violation issued (HPD, closed)
C
11/15/2021
Violation issued (HPD, closed)
C
Latest 60 of 83 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JEN MANAGEMENT107/30/2026
PHILOW MANAGEMENT607/08/2026
CLASSON PROJECT INC103/22/2026
JOHN FRANKLIN ASSOCIATES103/22/2026
JOHN-FRANKLIN ASSOCIA103/22/2026
T-MOBILE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.103/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMMUNICATION COMPONENT SGeneral Contractor303/21/2026
JAMES FAMULAROElectrical103/21/2026
BELL FUEL OIL, LLCPlumbing107/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851207/13/2026
BUTTERFIELD & O'CONNOR4189103/14/2024
FRENCH & PARRELLO ASSOCIA1271101/03/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBELL FUEL OIL, LLC07/29/2026
DOB NOWSuspended ScaffoldPermit IssuedMARKIE CONSTRUCTION INC08/21/2024
DOB NOWAntennaSigned-offCOMMUNICATION COMPONENT S01/10/2023
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/20/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC09/03/2015
BISOTISSUEDMERCURY NATIONAL CONSTRUCTION06/04/2001
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/18/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/18/2026Heating SystemsLOUIS ARENAspecial
06/18/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/18/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/18/2026Maintenance informationLOUIS ARENAenergy_progress
06/18/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/18/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01004352-I1Request digital key ↗
08/24/2026B01095802-I1Request digital key ↗
08/21/2026B01211123-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION3
10/31/2015321116653Open ↗
09/08/2015321116653Open ↗
09/08/2008310185135Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
06/12/2018321116653Open ↗
04/23/2015321116653Open ↗
08/19/2008310185135Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/17/2018321116653Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01211123-I1Open ↗
08/16/2026B01418589-I1Open ↗
08/16/2026B01418589-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01418589-I1Open ↗
09/01/2026B01418589-I1Open ↗
09/01/2026B01418589-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01418589-I1Open ↗
09/01/2026B01418589-I1Open ↗
08/28/2026B01418589-S1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/19/2018321116653Open ↗
04/23/2015321116653Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA2
09/03/2015321116653Open ↗
07/23/2015321116653Open ↗
▸BISSCHEDULE B - PLUMBING1
08/19/2008310185135Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/19/2008310185135Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
08/19/2008310185135Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01211123-I1Open ↗
08/16/2026B01418589-I1Open ↗
08/16/2026B01418589-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/19/2008310185135Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/19/2018321116653Open ↗
04/23/2015321116653Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/19/2018321116653Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
04/23/2015321116653Open ↗
08/19/2008310185135Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/19/2018321116653Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/19/2018321116653Open ↗
08/29/2018321116653Open ↗
04/23/2015321116653Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
04/23/2015321116653Open ↗
08/19/2008310185135Open ↗
▸BISADDITIONAL INFORMATION1
08/29/2018321116653Open ↗
▸BISBOROUGH INTAKE FORM1
10/19/2018321116653Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01095802-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01095802-I1Open ↗