← Back
Five to six families
Crown Heights Residents for Adults
126 ALBANY AVENUE · BIN 3030211
💬 Discuss this project
1931Year Built
4Stories
C2Building Class
R6Zoning
10,137 sfGross Floor Area
6Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Five to six families · 3,322 sf lot · 3.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 12 docs
Bulkhead2p · 1 filing · 12 docs
Floor 46p · 1 filing · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
Cellar15p · 2 filings · 20 docs
1 job · most recent 03/30/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2026——Air Conditioning Systems
Cooling
Greenheck WCVT10B10B 11,000 BTU · Exhaust Fan ×4
WCVT120B10B 13,500 BTU · Exhaust Fan ×2
1 job · most recent 06/05/2024
Water/Sanitary
FiledStatusContractorScope
06/05/2024Signed-offA.R.L. PLUMBING & HTG LLCWater/Sanitary
6 jobs · most recent 03/05/2026
General Wiring Boiler Controls
FiledStatusContractorScope
03/05/2026CompleteWATTS UP ELECTRIC NY LLCGeneral Wiring
03/05/2026CancelledWATTS UP ELECTRIC NY LLCGeneral Wiring
03/05/2026CancelledWATTS UP ELECTRIC NY LLCGeneral Wiring
01/22/2026CompleteWATTS UP ELECTRIC NY LLCBoiler Controls
03/10/2025CompleteTRIPLE CROWN ELECTRIC INCGeneral Wiring
02/07/2024CompleteTRIPLE CROWN ELECTRIC INCGeneral Wiring
Building Lifecycle
All (125)Filed (8)Permit Issued (4)Signed Off (2)Violation (60)Inspection (9)Objection (17)Special Inspection (25)
09/01/2026
Objection resolved — Resolved
05/01/2026
Violation issued (HPD, closed)
A
04/20/2026
Violation issued (HPD, closed)
A
04/20/2026
Violation issued (HPD, closed)
B
04/20/2026
Violation issued (HPD, closed)
C
04/20/2026
Violation issued (HPD, closed)
A
04/20/2026
Violation issued (HPD, closed)
A
04/20/2026
Violation issued (HPD, closed)
A
04/13/2026
Objection raised — Scope
04/11/2026
Violation issued (HPD, closed)
B
04/10/2026
Objection raised — Scope
04/10/2026
Objection raised — Cost
04/10/2026
Objection raised — Cost
03/30/2026
Filed — Alteration
Modification to HVAC system as per plans
B01371488-I1
03/30/2026
Filed — Alteration
Modification to HVAC system as per plans
B01371488-S1
03/30/2026
Filed — Alteration
Modification to HVAC system as per plans
B01371488-S5
03/30/2026
Filed — Alteration
Modification to HVAC system as per plans
B01371488-S2
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2026
Special inspection requirement — Shutoff dampers
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Exterior lighting power
03/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/18/2026
Special inspection requirement — Fenestration air leakage
03/18/2026
Special inspection requirement — Lighting controls
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Masonry
03/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/18/2026
Special inspection requirement — Air barrier - visual inspection
03/16/2026
Special inspection requirement — Final
03/13/2026
Special inspection requirement — Final
03/13/2026
Special inspection requirement — Mechanical Systems
03/02/2026
Violation issued (HPD, closed)
A
11/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/09/2025
Violation issued (HPD, closed)
C
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
B
06/09/2025
Violation issued (HPD, closed)
A
06/09/2025
Violation issued (HPD, closed)
B
Latest 60 of 125 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LDCCH209/13/2026
LOCAL DEVELOPMENT CORP OF CROWN HE1407/08/2026
LOCAL DEVELOPMENT CORPORATION OF CH103/22/2026
NAGAN EX CONSULTANTS103/22/2026
CROWN HEIGHTS RESIDENCE FOR ADULTS HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSENTHAL ENGINEERING PLLC303/30/2026
ESKW/A103/30/2026
CRICKET ARCHITECTS NJ LLC406/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NAGAN EX CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.R.L. PLUMBING & HTG LLCPlumbing207/08/2026
TRIPLE CROWN ELECTRIC INCElectrical103/22/2026
WATTS UP ELECTRIC NY LLCElectrical103/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.R.L. PLUMBING & HTG LLC02/04/2025
DOB NOWGeneral ConstructionSigned-offLOCAL DEVELOPMENT CORP. OF CROWN HE01/30/2025
DOB NOWPlumbingSigned-offA.R.L. PLUMBING & HTG LLC06/05/2024
DOB NOWGeneral ConstructionPermit IssuedLOCAL DEVELOPMENT CORP. OF CROWN HE10/20/2023
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Fail-Final CND-Occupancy InspectionFailView ↗
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/30/2026HVAC-R and service water heating equipment—energy_progress
03/30/2026HVAC-R and service water heating system controls—energy_progress
03/30/2026HVAC-R and service water piping design and insulation—energy_progress
03/27/2026HVAC-R and service water heating equipment—energy_progress
03/27/2026HVAC-R and service water piping design and insulation—energy_progress
03/27/2026HVAC-R and service water heating system controls—energy_progress
03/26/2026Tenant Protection Plan Compliance—special
03/25/2026Tenant Protection Plan Compliance—special
03/25/2026Fire-Resistant Penetrations and Joints—special
03/24/2026Shutoff dampers—energy_progress
03/24/2026Tenant Protection Plan Compliance—special
03/24/2026Energy Code Compliance Inspections—progress
03/24/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Exterior lighting power—energy_progress
03/18/2026Fenestration and door U-factor and product ratings—energy_progress
03/18/2026Fenestration air leakage—energy_progress
03/18/2026Lighting controls—energy_progress
03/18/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Masonry—special
03/18/2026Structural Stability – Alterations of existing buildings—special
03/18/2026Tenant Protection Plan Compliance—special
03/18/2026Air barrier - visual inspection—energy_progress
03/16/2026Final—progress
03/13/2026Final—progress
03/13/2026Mechanical Systems—special
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00860030-S1Request digital key ↗
08/26/2026B00860030-I1Request digital key ↗
08/26/2026B00860030-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B00860030-I1Open ↗
08/13/2026B00860030-S1Open ↗
08/13/2026B00860030-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00860030-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00860030-I1Open ↗
08/26/2026B00860030-S3Open ↗
08/26/2026B00860030-S2Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00860030-I1Open ↗
08/13/2026B00860030-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01371488-S2Open ↗
08/17/2026B01371488-S5Open ↗
08/14/2026B01371488-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026B00860030-S3Open ↗
08/13/2026B00860030-S1Open ↗
08/13/2026B00860030-S2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents6
▸DOB NOWDHCR Document4
08/13/2026B00860030-S2Open ↗
08/13/2026B00860030-I1Open ↗
08/13/2026B00860030-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification1
08/26/2026B00860030-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00860030-I1Open ↗