← Back
Single or multiple dwelling with stores or offices
631 FRANKLIN AVENUE
BROOKLYN · BIN 3030240
💬 Discuss this project
1905Year Built
3Stories
S9Building Class
R7AZoning
3,400 sfGross Floor Area
4Units
Rent Stabilized32 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 1,600 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 10 docs
Floor 1Under Construction3p · 1 filing · 10 docs
CellarUnder Construction6p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING PRESERVATION & DEVELOPMENT407/08/2026
PRESPECTIVE GENERAL CONSTRUCTION IN304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SU ARCHITECT, P.C.205/18/2026
BANGASH ASSOCIATES INC.111/04/2024
FL&M ENGINEERING DESIGN &INSPECTION108/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHEIKH EXPEDITING203/21/2026
THE GREEN STUDIO103/21/2026
MILLENNIUM DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor109/12/2026
PERSPECTIVE GENERAL CONSTGeneral Contractor104/09/2026
SKY HEIGHTS CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SU ARCHITECT PC6857205/18/2026
BANGASH ASSOCIATES INC8488111/04/2024
Building Lifecycle
All (115)Filed (4)Permit Issued (3)Signed Off (1)Violation (49)Objection (37)Special Inspection (21)
09/10/2026
Permit issued — Mechanical Systems
B01336244-I1-GC-CX
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Inspections
06/02/2026
Objection raised — Structural
06/02/2026
Objection raised — Admin
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Inspections
06/02/2026
Objection raised — Cost
05/18/2026
Filed — Alteration
TO FILE PLUMBING WORK FOR EX. COMMERICIAL SPACE ON 001 FLOOR AND CELLAR IN CONJUNCTION WITH GC WORK TYPE B01336244. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01394794-I1
05/14/2026
Violation issued (ECB, open)
Construction
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
04/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
04/22/2026
Objection resolved — Addressed
04/16/2026
Objection resolved — Addressed
04/16/2026
Objection resolved — Addressed
04/16/2026
Special inspection requirement — Interior lighting power
QIANG SU
04/09/2026
Objection raised — Energy
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Scope
03/20/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/06/2026
Objection raised — Admin
02/27/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/10/2026
Objection raised — Energy
02/10/2026
Objection raised — Zoning
02/10/2026
Objection raised — Plumbing
02/10/2026
Objection raised — Structural
02/10/2026
Objection raised — Plumbing
02/10/2026
Objection raised — Scope
02/10/2026
Objection raised — Scope
01/24/2026
Objection resolved — Addressed
01/24/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Admin
01/02/2026
Objection raised — Scope
01/02/2026
Objection raised — Structural
01/02/2026
Objection raised — Structural
12/19/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF COMMERCIAL SPACE AT 001FL AND CELLAR WITH GENERAL CONSTRUCTION WORK TYPE; TO MODIFY KITCHEN EXHAUST HOOD AND INSTALL SPLIT UNITS WITH MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CO.
B01336244-I1
12/19/2025
Special inspection requirement — Ventilation and air distribution system
QIANG SU
12/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
12/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
12/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
12/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
QIANG SU
12/18/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
12/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
QIANG SU
12/17/2025
Special inspection requirement — Mechanical Systems
QIANG SU
12/17/2025
Special inspection requirement — Final
Giap Flores
11/24/2025
Violation issued (HPD, open)
I
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedKALE CONSTRUCTION INC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedPERSPECTIVE GENERAL CONST07/21/2025
DOB NOWSidewalk ShedSigned-offSKY HEIGHTS CONSTRUCTION08/30/2024
BISMHISSUEDNEW YORK CARRIER TRADING06/07/2016
BISFPISSUEDUNIQUE FIRE SYSTEMS INC02/11/2016
1 project · most recent 12/19/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/19/2025Permit IssuedKALE CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-GX24NL 24,000 BTU · Fan Coil Indoor ×3
MXZ-5D42NL 42,000 BTU · Condensing Unit ×2
MSZ-GX15NL 1,500 BTU · Fan Coil Indoor ×1
Ventilation
Hoodmart 10D-DB 600 CFM · Exhaust Fan ×1
1 project · most recent 05/18/2026
Water/Sanitary
FiledStatusContractorScope
05/18/2026——Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/29/2026HVAC-R and service water piping design and insulationQIANG SUenergy_progress
04/29/2026HVAC-R and service water heating system controlsQIANG SUenergy_progress
04/29/2026HVAC-R and service water heating equipmentQIANG SUenergy_progress
04/29/2026Fire-Resistant Penetrations and JointsQIANG SUspecial
04/29/2026Energy Code Compliance InspectionsQIANG SUprogress
04/29/2026Tenant Protection Plan ComplianceQIANG SUspecial
04/16/2026Interior lighting powerQIANG SUenergy_progress
12/19/2025Ventilation and air distribution systemQIANG SUenergy_progress
12/18/2025HVAC-R and service water heating system controlsQIANG SUenergy_progress
12/18/2025HVAC-R and service water heating equipmentQIANG SUenergy_progress
12/18/2025HVAC-R and service water piping design and insulationQIANG SUenergy_progress
12/18/2025Fire-Resistance Rated ConstructionQIANG SUprogress
12/18/2025Energy Code Compliance InspectionsQIANG SUprogress
12/18/2025Tenant Protection Plan ComplianceQIANG SUspecial
12/18/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
12/18/2025Duct leakage testing, insulation and designQIANG SUenergy_progress
12/17/2025Mechanical SystemsQIANG SUspecial
12/17/2025FinalGiap Floresprogress
10/20/2024MasonryFAZAL BANGASHspecial
10/20/2024Tenant Protection Plan ComplianceFAZAL BANGASHspecial
10/20/2024FinalFAZAL BANGASHprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01058049-I1Request digital key ↗
08/23/2026B01129675-I1Request digital key ↗
08/19/2026B01336244-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
06/08/2016321242829Open ↗
02/18/2016321307279Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/08/2016321242829Open ↗
03/09/2016321307279Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026B01394794-I1Open ↗
08/29/2026B01394794-I1Open ↗
08/29/2026B01394794-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01058049-I1Open ↗
08/19/2026B01336244-I1Open ↗
08/17/2026B01394794-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B01394794-I1Open ↗
08/29/2026B01394794-I1Open ↗
08/28/2026B01336244-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/08/2016321242829Open ↗
03/09/2016321307279Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/08/2016321242829Open ↗
03/09/2016321307279Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/08/2016321242829Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
01/17/2017321307279Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01336244-I1Open ↗
08/15/2026B01394794-I1Open ↗
08/13/2026B01129675-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/08/2016321242829Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/08/2016321242829Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
06/08/2016321242829Open ↗
03/09/2016321307279Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/17/2017321307279Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/17/2017321307279Open ↗
06/08/2016321242829Open ↗
03/09/2016321307279Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
06/08/2016321242829Open ↗
03/09/2016321307279Open ↗