← Back
Walk-up apt, over six families with stores
619 NOSTRAND AVENUE
BROOKLYN · BIN 3030709
💬 Discuss this project
1910Year Built
4Stories
C7Building Class
R6AZoning
8,852 sfGross Floor Area
11Units
Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: NOSTRAND BERGEN GROUP LLC · 3,200 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof1p · 1 filing · 4 docs
Floor 119p · 3 filings · 20 docs
Cellar4p · 1 filing · 14 docs
1 job · most recent 01/22/2025
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/22/2025Permit IssuedHOPE HOME IMPROVEMENT INCHeating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Tosot TUD60-24AH2ADU HVAC 5TONS 60,000 BTU · Condensing Unit ×1
Fujitsu FOC1342 FUJITSU HVAC 3.5TONS 42,000 BTU ×1
FOC1360 FUJITSU HVAC 5TONS 60,000 BTU ×1
Ventilation
Greenheck CUE 1,468 CFM · Kitchen Exhaust ×2
Refrigeration
Copeland COPELAND M2CH-H047-1A6-321 125,600 BTU · Condensing Unit ×2
1 job · most recent 12/13/2019
Water/Sanitary
FiledStatusContractorScope
12/13/2019Permit IssuedTRI STATE PLBG & HTG INCWater/Sanitary
Building Lifecycle
All (81)Filed (6)Permit Issued (5)Violation (27)Inspection (2)Objection (24)Special Inspection (17)
07/04/2026
Violation issued (ECB, open)
Construction
11/10/2025
Objection resolved — Resolved
11/10/2025
Objection resolved — Resolved
06/10/2025
Violation issued (HPD, closed)
A
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Other
02/06/2025
Objection raised — Other
02/06/2025
Objection raised — Other
02/06/2025
Objection raised — Other
02/06/2025
Objection raised — Other
02/06/2025
Objection raised — Other
02/06/2025
Objection raised — Other
02/06/2025
Objection raised — Other
02/06/2025
Objection raised — Other
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2025
Filed — Alteration
Renovation of the existing take-out eating establishment as per the submitted drawing. The fire suppression system was filed under approved FDNY reference#2024-TMRGHD-007258.
B01087943-P1
12/30/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
GLEN LANGER
12/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
12/30/2024
Special inspection requirement — Final
GLEN LANGER
12/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
12/30/2024
Special inspection requirement — Mechanical Systems
GLEN LANGER
12/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
12/09/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Permit issued — Mechanical Systems
B01087943-I1-MS
12/05/2024
Permit issued — General Construction
B01087943-I1-GC
11/27/2024
Violation issued (HPD, closed)
I
11/20/2024
Permit issued — Plumbing
B01087943-S1-PL
11/19/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
10/15/2024
Objection resolved — Addressed
08/29/2024
Objection raised — Other
08/29/2024
Objection raised — Other
08/29/2024
Objection raised — Other
08/16/2024
Filed — Alteration
Renovation of the existing take-out eating establishment as per the submitted drawing. The fire suppression system was filed under approved FDNY reference#2024-TMRGHD-007258.
B01087943-I1
08/16/2024
Filed — Alteration
Renovation of the existing take-out eating establishment as per the submitted drawing. The fire suppression system was filed under approved FDNY reference#2024-TMRGHD-007258.
B01087943-S1
08/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
08/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
08/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
08/12/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
GLEN LANGER
08/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
07/29/2024
Special inspection requirement — Mechanical Systems
GLEN LANGER
07/29/2024
Special inspection requirement — Final
GLEN LANGER
04/11/2024
Violation issued (HPD, closed)
A
12/13/2019
Filed — Alteration
FILING PLUMBING WORK FOR A NAIL SALON AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00275940-P1
12/13/2019
Permit issued — Plumbing
B00275940-I1-PL
12/13/2019
Special inspection requirement — HVAC and service water heating system controls
Michelle Contri
12/13/2019
Special inspection requirement — HVAC and service water heating equipment
Michelle Contri
12/13/2019
Special inspection requirement — HVAC insulation and sealing
Michelle Contri
12/13/2019
Special inspection requirement — Maintenance information
Michelle Contri
12/10/2019
Filed — Alteration
B00275914-I1
12/10/2019
Filed — Alteration
FILING PLUMBING WORK FOR A NAIL SALON AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00275940-I1
12/10/2019
Permit issued — Mechanical Systems
B00275914-I1-MS
11/24/2014
Violation issued (HPD, closed)
B
09/11/2011
Violation issued (HPD, closed)
B
Latest 60 of 81 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NOSTRAND BERGEN GROUP LLC103/22/2026
619 NOSTRAND AVE CORP603/22/2026
19 NOSTRAAND AVE CORP103/22/2026
NOSTRAND PLAZA703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/12/2014$3.3M—NOSTRAND PLAZA INC → NOSTRAND BERGEN GROUP LLC$373/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOUTHERN CONSULTING ENGINEERING PC301/22/2025
M-CON ENGINEERING, PC312/13/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JARED ASSOCIATE CONSULTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOPE HOME IMPROVEMENT INCGeneral Contractor407/08/2026
M J DESIGN AND BUILD INCGeneral Contractor303/21/2026
W & M ELECTRIC CORPElectrical103/21/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008301/22/2025
M-CON ENGINEERING7341112/10/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedHOPE HOME IMPROVEMENT INC12/05/2024
DOB NOWGeneral ConstructionPermit IssuedHOPE HOME IMPROVEMENT INC12/05/2024
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING11/20/2024
DOB NOWPlumbingPermit IssuedDW PLUMBING INC12/13/2019
DOB NOWMechanical SystemsPermit IssuedM J DESIGN AND BUILD INC12/10/2019
BISOTISSUEDM J DESIGN AND BUILD INC12/03/2019
BISPLISSUEDROCK E SMALL PLBG&HTG INC11/25/2014
BISPLISSUEDL&J PLG & HTG CO OF NY IN01/19/2010
BISPLISSUEDTHE PLUMBING COMPANY INC03/23/2009
BISOTISSUEDGOLDSMITH CONSTRUCTION CORP.07/22/2008
BISOTISSUEDREBUILDING A,ERICA04/02/2008
BISPLISSUEDVENTURE PLUMBING AND HEATING11/05/1992
BISOTISSUEDVENTURE PLUMBING AND HEATING10/23/1992
BISBLISSUEDNEW YORK HEATING CO07/08/1992
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/09/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
12/30/2024Exhaust and Vent Systems in Plenums and DuctsGLEN LANGERspecial
12/30/2024Fire-Resistance Rated ConstructionGLEN LANGERprogress
12/30/2024FinalGLEN LANGERprogress
12/30/2024Tenant Protection Plan ComplianceGLEN LANGERspecial
12/30/2024Mechanical SystemsGLEN LANGERspecial
12/30/2024Fire-Resistant Penetrations and JointsGLEN LANGERspecial
08/16/2024Tenant Protection Plan ComplianceGLEN LANGERspecial
08/12/2024Fire-Resistant Penetrations and JointsGLEN LANGERspecial
08/12/2024Fire-Resistance Rated ConstructionGLEN LANGERprogress
08/12/2024Exhaust and Vent Systems in Plenums and DuctsGLEN LANGERspecial
08/12/2024Tenant Protection Plan ComplianceGLEN LANGERspecial
07/29/2024Mechanical SystemsGLEN LANGERspecial
07/29/2024FinalGLEN LANGERprogress
12/13/2019HVAC and service water heating system controls Michelle Contrienergy_progress
12/13/2019HVAC and service water heating equipment Michelle Contrienergy_progress
12/13/2019HVAC insulation and sealing Michelle Contrienergy_progress
12/13/2019Maintenance informationMichelle Contrienergy_progress
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
08/23/2026B01087943-S1Request digital key ↗
08/23/2026B01087943-P1Request digital key ↗
08/23/2026B01087943-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00275940-I1Request digital key ↗
08/15/2026B00275940-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00275914-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
12/04/2019322015154Open ↗
12/03/2014310278115Open ↗
01/20/2010310278115Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
03/06/2020322015154Open ↗
12/04/2019322015154Open ↗
07/09/2008310278115Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/14/2020322015154Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature6
09/29/2026B01087943-I1Open ↗
08/27/2026B00275940-I1Open ↗
08/27/2026B00275940-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026B01087943-I1Open ↗
08/13/2026B00275940-P1Open ↗
08/13/2026B01087943-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/04/2019322015154Open ↗
07/09/2008310278115Open ↗
01/18/2008310075897Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/04/2019322015154Open ↗
07/09/2008310278115Open ↗
01/18/2008310075897Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026B01087943-I1Open ↗
08/25/2026B01087943-P1Open ↗
08/24/2026B01087943-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/09/2008310278115Open ↗
01/18/2008310075897Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/04/2019322015154Open ↗
▸BISPC FULL REPORT1
01/18/2008310075897Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
08/13/2026B00275914-I1Open ↗
08/13/2026B00275940-I1Open ↗
08/13/2026B00275940-P1Open ↗
▸BISTenant Protection Plan and Notes1
12/04/2019322015154Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026B01087943-I1Open ↗
08/13/2026B00275940-P1Open ↗
08/13/2026B01087943-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/09/2008310278115Open ↗
07/09/2008310278115Open ↗
01/18/2008310075897Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/04/2019322015154Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/06/2020322015154Open ↗
12/04/2019322015154Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/14/2020322015154Open ↗
12/14/2020322015154Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/14/2020322015154Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/14/2020322015154Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
07/09/2008310278115Open ↗
01/18/2008310075897Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/20/2010310278115Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/14/2020322015154Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/14/2020322015154Open ↗
12/04/2019322015154Open ↗
10/30/2014310075897Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
12/04/2019322015154Open ↗
07/09/2008310278115Open ↗
▸BISADDITIONAL INFORMATION1
03/06/2020322015154Open ↗