← Back
Two family brick
1278 BERGEN STREET
BROOKLYN · BIN 3030763
💬 Discuss this project
1896Year Built
2Stories
B1Building Class
R6Zoning
3,000 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 2,000 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 232p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Cellar33p · 1 filing · 20 docs
Basement34p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 1278 BERGEN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.401/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOKEN HOME IMPROVEMENTGeneral Contractor307/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781401/31/2024
Building Lifecycle
All (48)Filed (4)Permit Issued (4)Signed Off (1)Violation (1)Inspection (8)Special Inspection (30)
11/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2024
Signed off — Alteration CO
B00698837-S1
02/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/08/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/08/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/08/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/31/2024
Filed — Alteration CO
B00698837-P3
01/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/31/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/31/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Chimneys and vents
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
01/24/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/30/2023
Filed — Alteration CO
B00698837-P1
10/26/2023
Permit issued — Plumbing
B00698837-S1-PL
10/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/09/2023
Permit issued — General Construction
B00698837-I1-GC-CX
10/12/2022
Permit issued — Plumbing
B00698837-S1-PL
04/20/2022
Permit issued — Structural
B00698837-I1-GC-CX
04/05/2022
Filed — Alteration CO
B00698837-S1
03/17/2022
Filed — Alteration CO
B00698837-I1
03/18/1994
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN10/26/2023
DOB NOWGeneral ConstructionPermit IssuedMOKEN HOME IMPROVEMENT01/09/2023
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN10/12/2022
DOB NOWStructuralPermit IssuedMOKEN HOME IMPROVEMENT04/20/2022
1 project · most recent 08/01/2024
General Wiring
FiledStatusContractorScope
08/01/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
02/08/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/08/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/08/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/08/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/08/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
02/08/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/31/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/31/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/31/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/31/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
01/31/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
01/31/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/24/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
01/24/2024MasonryCHRISTIAN LOZADAspecial
01/24/2024Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
01/24/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
01/24/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/24/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/24/2024Heating SystemsCHRISTIAN LOZADAspecial
01/24/2024Mechanical SystemsCHRISTIAN LOZADAspecial
01/24/2024Chimneys and ventsCHRISTIAN LOZADAspecial
01/24/2024Structural Steel - DetailsCHRISTIAN LOZADAspecial
01/24/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/24/2024FinalCHRISTIAN LOZADAprogress
01/24/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
Latest 25 of 60.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00698837-S1Request digital key ↗
08/26/2026B00698837-I1Request digital key ↗
08/26/2026B00698837-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B00698837-P3Open ↗
08/13/2026B00698837-S1Open ↗
08/13/2026B00698837-I1Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00698837-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00698837-I1Open ↗
09/01/2026B00698837-I1Open ↗
08/30/2026B00698837-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00698837-I1Open ↗
09/01/2026B00698837-I1Open ↗
09/01/2026B00698837-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00698837-S1Open ↗
08/26/2026B00698837-I1Open ↗
08/26/2026B00698837-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/26/2026B00698837-P1Open ↗
08/26/2026B00698837-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00698837-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00698837-P1Open ↗
08/26/2026B00698837-S1Open ↗
08/26/2026B00698837-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00698837-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/26/2026B00698837-P1Open ↗
08/26/2026B00698837-I1Open ↗