← Back
Over six families without stores
889 ST MARKS AVENUE
BROOKLYN · BIN 3030787
💬 Discuss this project
1903Year Built
4Stories
C1Building Class
R6Zoning
6,470 sfGross Floor Area
8Units
Rent Stabilized148 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: GREATER MT PLEASANT BAPTIST CHURCH · 3,313 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 11p · 1 filing · 13 docs
CellarUnder Construction7p · 1 filing · 10 docs
Basement1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREATER MT PLEASANT BAPTIST CHURCH103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC-HI-TECT ASSOCIATE INC403/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTURAL DESIGN SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BARNETT PLBG & HTG CORPPlumbing206/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963403/24/2026
Building Lifecycle
All (82)Filed (4)Permit Issued (2)Violation (60)Inspection (10)Special Inspection (6)
05/06/2026
Violation issued (HPD, open)
A
04/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Special inspection requirement — Heating Systems
IGOR LISOVENKO
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
IGOR LISOVENKO
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
IGOR LISOVENKO
03/25/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/24/2026
Filed — Alteration
REGISTERED THE BOILER ALSO REPLACE HOT WATER TANK AND NEW GASPIPING FROM METER TO BOILER ,4TH FLOOR APARTMENT 4B.
B01341527-P3
03/24/2026
Filed — Alteration
REGISTERED THE BOILER ALSO REPLACE HOT WATER TANK AND NEW GASPIPING FROM METER TO BOILER ,4TH FLOOR APARTMENT 4B.
B01341527-P2
03/23/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/20/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/12/2026
Special inspection requirement — Heating Systems
IGOR LISOVENKO
03/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
IGOR LISOVENKO
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
IGOR LISOVENKO
03/02/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/03/2026
Permit issued — Plumbing
B01341527-S1-PL
02/03/2026
Permit issued — Boiler Equipment
B01341527-I1-BE
01/15/2026
Filed — Alteration
REGISTERED THE BOILER ALSO REPLACE HOT WATER TANK AND NEW GASPIPING FROM METER TO BOILER ,4TH FLOOR APARTMENT 4B.
B01341527-I1
01/15/2026
Filed — Alteration
REGISTERED THE BOILER ALSO REPLACE HOT WATER TANK AND NEW GASPIPING FROM METER TO BOILER ,4TH FLOOR APARTMENT 4B.
B01341527-S1
12/23/2025
Violation issued (HPD, open)
B
12/23/2025
Violation issued (HPD, open)
B
12/23/2025
Violation issued (HPD, open)
C
12/23/2025
Violation issued (HPD, open)
C
12/23/2025
Violation issued (HPD, open)
C
12/23/2025
Violation issued (HPD, closed)
C
12/23/2025
Violation issued (HPD, closed)
C
12/23/2025
Violation issued (HPD, open)
B
11/19/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/05/2025
Violation issued (HPD, open)
A
10/05/2025
Violation issued (HPD, open)
B
10/05/2025
Violation issued (HPD, open)
C
10/05/2025
Violation issued (HPD, open)
C
10/05/2025
Violation issued (HPD, open)
B
10/05/2025
Violation issued (HPD, open)
B
10/05/2025
Violation issued (HPD, open)
A
06/11/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, closed)
C
05/14/2025
Violation issued (HPD, open)
C
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, open)
A
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, closed)
C
05/14/2025
Violation issued (HPD, open)
B
05/14/2025
Violation issued (HPD, open)
B
02/18/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
02/16/2025
Violation issued (HPD, open)
C
02/16/2025
Violation issued (HPD, open)
A
02/16/2025
Violation issued (HPD, open)
A
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBARNETT PLBG & HTG CORP02/03/2026
DOB NOWBoiler EquipmentSigned-offBARNETT PLBG & HTG CORP02/03/2026
1 project · most recent 03/24/2026
Gas
FiledStatusContractorScope
03/24/2026Signed-offBARNETT PLBG & HTG CORPGas
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/23/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/20/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/02/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/18/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/31/2026Heating SystemsIGOR LISOVENKOspecial
03/31/2026Tenant Protection Plan ComplianceIGOR LISOVENKOspecial
03/31/2026Tenant Protection Plan ComplianceIGOR LISOVENKOspecial
03/12/2026Heating SystemsIGOR LISOVENKOspecial
03/12/2026Tenant Protection Plan ComplianceIGOR LISOVENKOspecial
03/11/2026Tenant Protection Plan ComplianceIGOR LISOVENKOspecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B01341527-P3Request digital key ↗
08/18/2026B01341527-S1Request digital key ↗
08/18/2026B01341527-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026B00989354-S3Open ↗
08/13/2026B00989354-S2Open ↗
08/13/2026B00989354-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B01341527-P3Open ↗
09/01/2026B01341527-P3Open ↗
08/31/2026B01341527-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026B01341527-S1Open ↗
08/18/2026B01341527-I1Open ↗
08/18/2026B01341527-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026B01341527-S1Open ↗
08/18/2026B01341527-I1Open ↗
08/18/2026B01341527-P2Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026B00989354-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00989354-S3Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/13/2026B00989354-I1Open ↗