Two family brick
706 STERLING PLACE
BROOKLYN · BIN 3031795
💬 Discuss this project
1899Year Built
2Stories
B1Building Class
R5BZoning
2,622 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: STERLING RESIDENTIAL LLC · 2,620 sf lot · 1 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingOther
Roof3p · 4 filings · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 11p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
Basement3p · 2 filings · 20 docs
1 job · most recent 01/12/2021
General Wiring
FiledStatusContractorScope
01/12/2021Permit IssuedV ELECTRIC NY INCGeneral Wiring
Building Lifecycle
All (35)Filed (7)Permit Issued (4)Signed Off (3)Violation (2)Special Inspection (19)
12/09/2025
Signed off — Alteration
ALTERATIONS AT FACADE, ROOF, & INTERIOR RENOVATION. ENLARGEMENT OF WINDOW OPENING AT REAR FACADE. REPLACEMENT OF JOIST FROM BASEMENT TO ROOF AS SHOWN IN PLANS. NEW FOOTINGS FOR REAR YARD DECK, NEW SKYLIGHTS AT ROOF. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00458518-I1
12/01/2025
Filed — Alteration
ALTERATIONS AT FACADE, ROOF, & INTERIOR RENOVATION. ENLARGEMENT OF WINDOW OPENING AT REAR FACADE. REPLACEMENT OF JOIST FROM BASEMENT TO ROOF AS SHOWN IN PLANS. NEW FOOTINGS FOR REAR YARD DECK, NEW SKYLIGHTS AT ROOF. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00458518-P3
05/16/2025
Signed off — Alteration
GAS METER & PIPING TO BE REMOVED AND NEW DOMESTIC WATER SERVICE. REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00368956-I1
05/14/2025
Signed off — Alteration
B00368965-I1
12/04/2024
Violation issued (HPD, closed)
I
10/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
10/04/2021
Special inspection requirement — HVAC and service water heating equipment
William Ryan
10/04/2021
Special inspection requirement — Maintenance information
William Ryan
10/04/2021
Special inspection requirement — HVAC and service water heating system controls
William Ryan
10/04/2021
Special inspection requirement — HVAC insulation and sealing
William Ryan
10/04/2021
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
09/29/2021
Filed — Alteration
GAS METER & PIPING TO BE REMOVED AND NEW DOMESTIC WATER SERVICE. REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00368956-P1
09/27/2021
Special inspection requirement — HVAC and service water heating equipment
William Ryan
09/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
09/27/2021
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
09/27/2021
Special inspection requirement — Maintenance information
William Ryan
09/27/2021
Special inspection requirement — HVAC insulation and sealing
William Ryan
09/27/2021
Special inspection requirement — HVAC and service water heating system controls
William Ryan
04/14/2021
Permit issued — General Construction
B00458518-I1-FO
03/23/2021
Filed — Alteration
ALTERATIONS AT FACADE, ROOF, & INTERIOR RENOVATION. ENLARGEMENT OF WINDOW OPENING AT REAR FACADE. REPLACEMENT OF JOIST FROM BASEMENT TO ROOF AS SHOWN IN PLANS. NEW FOOTINGS FOR REAR YARD DECK, NEW SKYLIGHTS AT ROOF. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00458518-P1
03/19/2021
Special inspection requirement — Demolition
ROBERT WOLFSON
03/19/2021
Special inspection requirement — Footing and Foundation
William Ryan
03/19/2021
Special inspection requirement — Final
William Ryan
03/19/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ROBERT WOLFSON
03/19/2021
Special inspection requirement — Concrete - Cast-In-Place
William Ryan
03/19/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBERT WOLFSON
03/19/2021
Special inspection requirement — Post-installed Anchors
William Ryan
03/03/2021
Permit issued — General Construction
B00458518-I1-GC
01/29/2021
Filed — Alteration
ALTERATIONS AT FACADE, ROOF, & INTERIOR RENOVATION. ENLARGEMENT OF WINDOW OPENING AT REAR FACADE. REPLACEMENT OF JOIST FROM BASEMENT TO ROOF AS SHOWN IN PLANS. NEW FOOTINGS FOR REAR YARD DECK, NEW SKYLIGHTS AT ROOF. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
B00458518-I1
11/06/2020
Permit issued — Mechanical Systems
B00368965-I1-MS
11/05/2020
Permit issued — Plumbing
B00368956-I1-PL
09/02/2020
Filed — Alteration
GAS METER & PIPING TO BE REMOVED AND NEW DOMESTIC WATER SERVICE. REMOVAL, RELOCATION, & INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AND CUT/CONNECT SANITARY/VENT PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00368956-I1
09/02/2020
Filed — Alteration
B00368965-I1
08/31/2020
Filed — Alteration
B00368586-I1
04/28/2015
Violation issued (HPD, closed)
C
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STERLING RESIDENTIAL2704/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2020$1.6M—— → —$610/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TITAN ENGINEERS PC412/01/2025
ABS ENGINEERING, PLLC309/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
READ ARCHITECTURE DESIGN DPC703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ORBIT PLBG & HTG INCPlumbing1407/08/2026
ORBIT MECHANICAL SOLUTIO*General Contractor504/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018712/01/2025
VIBRANALYSIS INC., DBA VT6864412/01/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offORBIT MECHANICAL SOLUTIO*04/14/2021
DOB NOWGeneral ConstructionSigned-offORBIT MECHANICAL SOLUTIO*03/03/2021
DOB NOWMechanical SystemsSigned-offORBIT MECHANICAL SOLUTIO*11/06/2020
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC11/05/2020
BISOTISSUEDORBIT MECHANICAL SOLUTIO*12/08/2020
BISOTISSUEDORBIT MECHANICAL SOLUTIO*10/28/2020
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/04/2021Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/04/2021HVAC and service water heating equipment William Ryanenergy_progress
10/04/2021Maintenance informationWilliam Ryanenergy_progress
10/04/2021HVAC and service water heating system controls William Ryanenergy_progress
10/04/2021HVAC insulation and sealing William Ryanenergy_progress
10/04/2021Energy Code Compliance InspectionsWilliam Ryanprogress
09/27/2021HVAC and service water heating equipment William Ryanenergy_progress
09/27/2021Fire-Resistant Penetrations and JointsWilliam Ryanspecial
09/27/2021Energy Code Compliance InspectionsWilliam Ryanprogress
09/27/2021Maintenance informationWilliam Ryanenergy_progress
09/27/2021HVAC insulation and sealing William Ryanenergy_progress
09/27/2021HVAC and service water heating system controls William Ryanenergy_progress
03/19/2021DemolitionROBERT WOLFSONspecial
03/19/2021Footing and FoundationWilliam Ryanprogress
03/19/2021FinalWilliam Ryanprogress
03/19/2021Subsurface Investigations (Borings/Test Pits)ROBERT WOLFSONspecial
03/19/2021Concrete - Cast-In-PlaceWilliam Ryanspecial
03/19/2021Subsurface Conditions – Fill Placement & In-Place DensityROBERT WOLFSONspecial
03/19/2021Post-installed AnchorsWilliam Ryanspecial
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Foundation3
09/01/2026B00458518-I1Request digital key ↗
09/01/2026B00458518-P1Request digital key ↗
09/01/2026B00458518-P3Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction3
09/01/2026B00458518-I1Request digital key ↗
09/01/2026B00458518-P1Request digital key ↗
09/01/2026B00458518-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00368956-I1Request digital key ↗
08/15/2026B00368956-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00368586-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00368965-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
08/26/2021340749177Open ↗
08/25/2021340749177Open ↗
11/27/2020340749177Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
10/28/2020340749177Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
10/28/2020340749177Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
10/28/2020340749177Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
08/30/2026B00458518-P1Open ↗
08/30/2026B00458518-P1Open ↗
08/26/2026B00368956-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00458518-P1Open ↗
09/01/2026B00458518-I1Open ↗
09/01/2026B00458518-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/30/2026B00458518-P1Open ↗
08/30/2026B00458518-P1Open ↗
08/30/2026B00458518-P1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/02/2020340749177Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/02/2020340749177Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/26/2021340749177Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/02/2020340749177Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
03/11/2022340749177Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00458518-I1Open ↗
09/01/2026B00458518-P1Open ↗
09/01/2026B00458518-P3Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B00368586-I1Open ↗
08/13/2026B00368956-I1Open ↗
08/13/2026B00368965-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
10/28/2020340749177Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/27/2020340749177Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/02/2020340749177Open ↗
▸BISEXTERIOR LIGHTING POWER1
04/01/2025340749177Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/01/2025340749177Open ↗
▸BISINTERIOR LIGHTING POWER1
04/01/2025340749177Open ↗
▸BISFENESTRATION AREAS1
04/01/2025340749177Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/02/2020340749177Open ↗
▸BISNYCECC ANALYSIS1
09/02/2020340749177Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/01/2025340749177Open ↗
▸BISLIGHTING CONTROLS1
04/01/2025340749177Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT3
08/13/2026B00458518-P3Open ↗
08/13/2026B00458518-P1Open ↗
08/13/2026B00458518-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/01/2025340749177Open ↗
09/02/2020340749177Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/01/2025340749177Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/01/2025340749177Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
10/28/2020340749177Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00458518-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00458518-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/03/2025340749177Open ↗
▸BISFINAL1
04/01/2025340749177Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/02/2020340749177Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/18/2025340749177Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
08/26/2021340749177Open ↗
08/26/2021340749177Open ↗
11/27/2020340749177Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/02/2020340749177Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/02/2020340749177Open ↗
09/02/2020340749177Open ↗