Miscellaneous two family
819 LINCOLN PLACE
BROOKLYN · BIN 3032335
💬 Discuss this project
1897Year Built
2Stories
B9Building Class
R6Zoning
2,910 sfGross Floor Area
2Units
Miscellaneous two family · 2,555 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 312p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar18p · 1 filing · 20 docs
Basement12p · 1 filing · 20 docs
1 job · most recent 07/26/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/26/2024Signed-offPALONE BROTHERS AIRHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TUMYP0361AK43NA 3 tons · Vrf Outdoor ×2
TUMYP0481AK43NA 4 tons · Condensing Unit ×2
1 job · most recent 07/26/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/26/2024Signed-offASPECT PLBNG&HTNG CO LLCGas, Water/Sanitary
1 job · most recent 05/22/2023
General Wiring
FiledStatusContractorScope
05/22/2023CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring
1 job · most recent 07/26/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
07/26/2024Signed-offPALONE BROTHERS AIRSteel, Concrete, Masonry, Wood
Building Lifecycle
All (74)Filed (9)Permit Issued (5)Signed Off (4)Inspection (8)Objection (18)Special Inspection (30)
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
08/06/2024
Special inspection requirement — Air barrier - visual inspection
Lisa Ekle
08/06/2024
Special inspection requirement — Insulation placement and R values
Lisa Ekle
08/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Lisa Ekle
08/06/2024
Special inspection requirement — Fenestration areas
Lisa Ekle
08/06/2024
Special inspection requirement — Fenestration air leakage
Lisa Ekle
08/06/2024
Special inspection requirement — Lighting in dwelling units
Lisa Ekle
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Lisa Ekle
08/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
Lisa Ekle
08/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
07/26/2024
Filed — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-P4
06/18/2024
Special inspection requirement — Fenestration air leakage
Lisa Ekle
06/18/2024
Special inspection requirement — Lighting in dwelling units
Lisa Ekle
06/18/2024
Special inspection requirement — Fenestration areas
Lisa Ekle
06/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Lisa Ekle
06/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Lisa Ekle
06/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Jabour
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
06/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Lisa Ekle
06/18/2024
Special inspection requirement — Insulation placement and R values
Lisa Ekle
06/18/2024
Special inspection requirement — Air barrier - visual inspection
Lisa Ekle
04/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2024
Filed — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-P3
03/07/2024
Signed off — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-S3
01/04/2024
Permit issued — Mechanical Systems
B00722002-S3-MS
12/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
12/22/2023
Special inspection requirement — Mechanical Systems
Joseph Jabour
12/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
12/22/2023
Special inspection requirement — Final
Joseph Jabour
12/22/2023
Special inspection requirement — Shutoff dampers
Joseph Jabour
12/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
12/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
12/22/2023
Special inspection requirement — Maintenance information
Joseph Jabour
12/19/2023
Filed — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-P2
09/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
09/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
08/28/2023
Signed off — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-S2
08/17/2023
Signed off — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-S4
08/01/2023
Signed off — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-S1
04/25/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/18/2023
Filed — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-P1
02/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/26/2022
Permit issued — Foundation
B00722002-S4-FO
09/14/2022
Filed — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-S4
09/07/2022
Permit issued — Plumbing
B00722002-S1-PL
08/31/2022
Filed — Alteration CO
NEW HVAC MINI SPLIT SYSTEM FOR UPPER UNIT OF TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH THE ALTERATION OF THE RESIDENCE.
B00722002-S1
08/30/2022
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
08/24/2022
Objection raised — Mechanical
08/24/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Scope
08/24/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Scope
08/24/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Admin
08/24/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Structural
08/24/2022
Objection resolved — Addressed
08/23/2022
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
Latest 60 of 74 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2015$1.8M—VERDELL HENDERSON ESTATE → Private party$622/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
E.G. ARCHITECTURE PLLC507/26/2024
EP ENGINEERING LLC212/19/2023
M C STRUCTURAL ENGINEERING209/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN TECH CONSTRUCT CORGeneral Contractor307/08/2026
SUNBIRD ELECTRICAL CONTRElectrical103/22/2026
PALONE BROTHERS AIRGeneral Contractor107/08/2026
ASPECT PLBNG&HTNG CO LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930907/26/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPALONE BROTHERS AIR01/04/2024
DOB NOWFoundationSigned-offDESIGN TECH CONSTRUCT COR10/26/2022
DOB NOWPlumbingSigned-offASPECT PLBNG&HTNG CO LLC09/07/2022
DOB NOWStructuralSigned-offDESIGN TECH CONSTRUCT COR08/17/2022
DOB NOWGeneral ConstructionPermit IssuedDESIGN TECH CONSTRUCT COR08/04/2022
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2022Pass-Final SD - Fire PumpPassView ↗
08/23/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/19/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
08/06/2024Fire-Resistant Penetrations and JointsJoseph Jabourspecial
08/06/2024Air barrier - visual inspectionLisa Ekleenergy_progress
08/06/2024Insulation placement and R valuesLisa Ekleenergy_progress
08/06/2024Fenestration and door U-factor and product ratingsLisa Ekleenergy_progress
08/06/2024Fenestration areasLisa Ekleenergy_progress
08/06/2024Fenestration air leakageLisa Ekleenergy_progress
08/06/2024Lighting in dwelling unitsLisa Ekleenergy_progress
08/06/2024Energy Code Compliance InspectionsLisa Ekleprogress
08/06/2024Fire-Resistance Rated ConstructionLisa Ekleprogress
08/06/2024Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
06/18/2024Fenestration air leakageLisa Ekleenergy_progress
06/18/2024Lighting in dwelling unitsLisa Ekleenergy_progress
06/18/2024Fenestration areasLisa Ekleenergy_progress
06/18/2024Fire-Resistance Rated ConstructionLisa Ekleprogress
06/18/2024Energy Code Compliance InspectionsLisa Ekleprogress
06/18/2024Structural Stability – Alterations of existing buildingsJoseph Jabourspecial
06/18/2024Fire-Resistant Penetrations and JointsJoseph Jabourspecial
06/18/2024Fenestration and door U-factor and product ratingsLisa Ekleenergy_progress
06/18/2024Insulation placement and R valuesLisa Ekleenergy_progress
06/18/2024Air barrier - visual inspectionLisa Ekleenergy_progress
12/22/2023HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
12/22/2023Mechanical SystemsJoseph Jabourspecial
12/22/2023Energy Code Compliance InspectionsJoseph Jabourprogress
12/22/2023FinalJoseph Jabourprogress
12/22/2023Shutoff dampersJoseph Jabourenergy_progress
Latest 25 of 45.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026B00722002-P4Request digital key ↗
08/28/2026B00722002-P3Request digital key ↗
08/28/2026B00722002-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/13/2026B00722002-S2Open ↗
08/13/2026B00722002-P3Open ↗
08/13/2026B00722002-I1Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00722002-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature14
09/17/2026B00722002-S4Open ↗
09/17/2026B00722002-S4Open ↗
09/01/2026B00722002-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026B00722002-P4Open ↗
08/28/2026B00722002-P3Open ↗
08/28/2026B00722002-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/17/2026B00722002-S4Open ↗
09/01/2026B00722002-P2Open ↗
08/29/2026B00722002-P4Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00722002-P3Open ↗
08/13/2026B00722002-P4Open ↗
08/13/2026B00722002-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B00722002-I1Open ↗
08/28/2026B00722002-P4Open ↗
08/28/2026B00722002-P2Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00722002-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/28/2026B00722002-P4Open ↗
08/28/2026B00722002-P3Open ↗
08/28/2026B00722002-I1Open ↗