← Back
Miscellaneous two family
901 LINCOLN PLACE
BROOKLYN · BIN 3032407
💬 Discuss this project
1906Year Built
2Stories
B9Building Class
R6Zoning
3,268 sfGross Floor Area
2Units
4 Open Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous two family · 2,006 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction12p · 1 filing · 16 docs
Floor 1Under Construction12p · 1 filing · 16 docs
CellarUnder Construction14p · 1 filing · 16 docs
BasementUnder Construction12p · 1 filing · 16 docs
1 job · most recent 02/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
02/21/2025Permit IssuedL&J PLG & HTG CO OF NY INGas, Water/Sanitary
2 jobs · most recent 03/23/2026
General Wiring
FiledStatusContractorScope
03/23/2026Permit IssuedSMART LINE ELECTRIC, LLCGeneral Wiring
09/29/2025Permit IssuedADAM ELECL CONTRNG LLCGeneral Wiring
Building Lifecycle
All (65)Filed (2)Permit Issued (4)Violation (15)Objection (24)Special Inspection (20)
07/24/2026
Permit issued — Plumbing
B01150240-S1-PL
07/09/2026
Violation issued (ECB, open)
Construction
07/06/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/06/2026
Violation issued (ECB, open)
Construction
07/06/2026
Violation issued (ECB, open)
Unknown
05/12/2026
Permit issued — General Construction
B01150240-I1-GC
09/24/2025
Permit issued — Plumbing
B01150240-S1-PL
09/12/2025
Permit issued — General Construction
B01150240-I1-GC
03/31/2025
Objection resolved — Addressed
03/26/2025
Objection raised — Admin
03/26/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
03/19/2025
Objection raised — Admin
03/17/2025
Objection resolved — Addressed
03/17/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
03/11/2025
Objection resolved — Addressed
02/26/2025
Objection raised — Zoning
02/25/2025
Objection raised — Energy
02/25/2025
Objection raised — Plumbing
02/21/2025
Filed — Alteration CO
FILING FOR PLUMBING WORK TYPE ONLY AS A SUBSEQUENCE FILING OF JOB#B01150240 FOR THE RENOVATION OF AN EXISTING BUILDING WITH 2 DWELLING UNITS.
B01150240-S1
02/13/2025
Objection resolved — Addressed
02/13/2025
Objection resolved — Addressed
02/13/2025
Objection resolved — Addressed
02/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/11/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/24/2024
Objection raised — Zoning
12/24/2024
Objection raised — Admin
12/24/2024
Objection raised — Zoning
12/24/2024
Objection raised — Zoning
12/24/2024
Objection raised — Energy
12/24/2024
Objection raised — Structural
12/24/2024
Objection raised — Structural
12/20/2024
Filed — Alteration CO
FILING FOR PLUMBING WORK TYPE ONLY AS A SUBSEQUENCE FILING OF JOB#B01150240 FOR THE RENOVATION OF AN EXISTING BUILDING WITH 2 DWELLING UNITS.
B01150240-I1
12/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/03/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
12/03/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
12/03/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/03/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/03/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/03/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/03/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/03/2024
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/03/2024
Special inspection requirement — Masonry
FAHAD FATEH
12/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/29/2019
Violation issued (HPD, closed)
I
01/28/2019
Violation issued (HPD, closed)
C
01/28/2019
Violation issued (HPD, closed)
C
01/28/2019
Violation issued (HPD, closed)
B
12/28/2013
Violation issued (HPD, closed)
C
11/27/2013
Violation issued (HPD, closed)
B
Latest 60 of 65 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/15/2023$1.3M—Private party → Private party$398/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PWR ENGINEERING DESIGN DPC202/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KP CONSULTING ENGINEER403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LILY HOME IMPROVEMENT CORGeneral Contractor104/09/2026
WASOFF PLUMBING & UTILITY COGeneral Contractor107/08/2026
L&J PLG & HTG CO OF NY INPlumbing108/16/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616202/21/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedL&J PLG & HTG CO OF NY IN07/24/2026
DOB NOWGeneral ConstructionPermit IssuedWASOFF PLUMBING & UTILITY CO05/12/2026
DOB NOWPlumbingPermit IssuedFLAVIO MECHANICAL CORP09/24/2025
DOB NOWGeneral ConstructionPermit IssuedLILY HOME IMPROVEMENT COR09/12/2025
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/17/2025Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
02/11/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/11/2025Maintenance informationFAHAD FATEHenergy_progress
02/11/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/11/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/11/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/03/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
12/03/2024Maintenance informationFAHAD FATEHenergy_progress
12/03/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
12/03/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
12/03/2024Fenestration air leakageFAHAD FATEHenergy_progress
12/03/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
12/03/2024Interior lighting powerFAHAD FATEHenergy_progress
12/03/2024Fenestration areasFAHAD FATEHenergy_progress
12/03/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
12/03/2024Concrete - Cast-In-PlaceFAHAD FATEHspecial
12/03/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/03/2024MasonryFAHAD FATEHspecial
12/03/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
12/03/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026B01150240-S1Request digital key ↗
08/22/2026B01150240-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/13/2026B01150240-S1Open ↗
08/13/2026B01150240-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026B01150240-S1Open ↗
08/22/2026B01150240-I1Open ↗
08/22/2026B01150240-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B01150240-S1Open ↗
08/22/2026B01150240-I1Open ↗
08/22/2026B01150240-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026B01150240-I1Open ↗
08/22/2026B01150240-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01150240-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01150240-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01150240-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/22/2026B01150240-I1Open ↗