← Back
Primarily 2 family with 1 store or office
308 ROGERS AVENUE
BROOKLYN · BIN 3034152
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
R6Zoning
2,907 sfGross Floor Area
3Units
10 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: H308 ROGERS AVENUE, LLC · 1,287 sf lot · 2.26 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 18 docs
Floor 31p · 1 filing · 18 docs
Floor 21p · 1 filing · 18 docs
Floor 11p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DUPREE RESIDENTIAL1109/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2024$1.2M—— → —$430/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OUTSOURCE SPECIAL INSPECTION304/29/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHOIDESIGNCONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MOSSO CONSTRUCTION INCGeneral Contractor303/21/2026
TS CONSTRUCTION NY INCGeneral Contractor106/28/2026
HOD PIPING & HEATING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637304/29/2026
Building Lifecycle
All (28)Filed (3)Permit Issued (3)Signed Off (1)Violation (10)Inspection (3)Special Inspection (8)
04/30/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR, EXISTING RESIDENTIAL UNITS ON 2ND FLOOR & 3RD FLOOR INCLUDES REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS ERECTION OF NEW INTERIOR PARTITIONS A/C INSTALLATION AS PER PLANS FILED HEREWITH NO
B01218174-S1
04/29/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR, EXISTING RESIDENTIAL UNITS ON 2ND FLOOR & 3RD FLOOR INCLUDES REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS ERECTION OF NEW INTERIOR PARTITIONS A/C INSTALLATION AS PER PLANS FILED HEREWITH NO
B01218174-P1
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
04/29/2026
Special inspection requirement — Mechanical Systems
Robert Truskosky
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
04/29/2026
Special inspection requirement — Final
Jonar Madriaga
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
04/27/2026
Special inspection requirement — Mechanical Systems
Robert Truskosky
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
04/27/2026
Special inspection requirement — Final
Jonar Madriaga
03/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/19/2025
Permit issued — General Construction
B01218174-I1-GC
09/05/2025
Permit issued — Plumbing
B01218174-S1-PL
07/21/2025
Permit issued — General Construction
B01218174-I1-GC
05/19/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR, EXISTING RESIDENTIAL UNITS ON 2ND FLOOR & 3RD FLOOR INCLUDES REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS ERECTION OF NEW INTERIOR PARTITIONS A/C INSTALLATION AS PER PLANS FILED HEREWITH NO
B01218174-S1
05/19/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR, EXISTING RESIDENTIAL UNITS ON 2ND FLOOR & 3RD FLOOR INCLUDES REMOVAL OF NON-LOAD BEARING INTERIOR PARTITIONS ERECTION OF NEW INTERIOR PARTITIONS A/C INSTALLATION AS PER PLANS FILED HEREWITH NO
B01218174-I1
01/20/2012
Violation issued (HPD, open)
B
01/20/2012
Violation issued (HPD, open)
B
01/20/2012
Violation issued (HPD, open)
B
01/20/2012
Violation issued (HPD, open)
A
07/05/2002
Violation issued (HPD, open)
A
07/05/2002
Violation issued (HPD, open)
A
07/05/2002
Violation issued (HPD, open)
A
07/05/2002
Violation issued (HPD, open)
A
07/05/2002
Violation issued (HPD, open)
B
07/05/2002
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMOSSO CONSTRUCTION INC09/19/2025
DOB NOWPlumbingSigned-offHOD PIPING & HEATING CORP09/05/2025
DOB NOWGeneral ConstructionPermit IssuedTS CONSTRUCTION NY INC07/21/2025
1 project · most recent 04/29/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/29/2026Permit IssuedMOSSO CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Daikin FTXS12W 12,000 BTU · Split System ×24
Ventilation
Daikin 4MXM36AVJU9 24,000 BTU · Heat Pump Outdoor ×6
1 project · most recent 04/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/29/2026Signed-offHOD PIPING & HEATING CORPGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/29/2026Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
04/29/2026Mechanical SystemsRobert Truskoskyspecial
04/29/2026Energy Code Compliance InspectionsRobert Truskoskyprogress
04/29/2026FinalJonar Madriagaprogress
04/27/2026Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
04/27/2026Mechanical SystemsRobert Truskoskyspecial
04/27/2026Energy Code Compliance InspectionsRobert Truskoskyprogress
04/27/2026FinalJonar Madriagaprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026B01218174-I1Request digital key ↗
08/17/2026B01218174-S1Request digital key ↗
08/17/2026B01218174-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026B01218174-P2Open ↗
08/17/2026B01218174-P1Open ↗
08/13/2026B01218174-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01218174-P1Open ↗
09/01/2026B01218174-P1Open ↗
08/26/2026B01218174-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01218174-P1Open ↗
08/26/2026B01218174-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01218174-P2Open ↗
08/17/2026B01218174-P1Open ↗
08/13/2026B01218174-I1Open ↗
Showing 3 of 4 on file for this type