← Back
City residence, one family
57 STERLING STREET
BROOKLYN · BIN 3034742
💬 Discuss this project
1910Year Built
2Stories
A4Building Class
R5Zoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
City residence, one family · 0.65 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 1Under Construction2p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLM STERLING PROPERTIES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAST DESIGN BUILD LLC207/03/2026
KMP DESIGN & ENGINEERING PLLC107/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNER CITY CONTRACTINGElectrical103/21/2026
RONALD TESTA, JR.Electrical103/21/2026
LA RENOVATIONS, LLCGeneral Contractor108/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLACK BOX ENGINEERING7196107/18/2022
Building Lifecycle
All (45)Filed (3)Permit Issued (1)Violation (1)Objection (22)Special Inspection (18)
08/20/2026
Objection resolved — Resolved
08/19/2026
Objection raised — Scope
08/17/2026
Permit issued — General Construction
B00748347-I1-GC-CX
08/10/2026
Objection resolved — Addressed
08/10/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/13/2026
Objection raised — Admin
07/13/2026
Objection raised — Scope
07/13/2026
Objection raised — Inspections
07/10/2026
Objection raised — Scope
07/10/2026
Objection raised — Scope
07/03/2026
Filed — Alteration
Kitchen renovation including replacement of plumbing fixtures, reconnection of domestic water and sanitary piping, and permanent capping of the existing gas branch serving the removed gas range. New cooking appliance to be electric.
B01413684-I1
07/03/2026
Filed — Alteration
Kitchen renovation including replacement of plumbing fixtures, reconnection of domestic water and sanitary piping, and permanent capping of the existing gas branch serving the removed gas range. New cooking appliance to be electric.
B01413684-S1
06/30/2026
Special inspection requirement — Concrete - Cast-In-Place
06/30/2026
Special inspection requirement — Structural Steel - Welding
06/30/2026
Special inspection requirement — Structural Steel - Details
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/08/2026
Special inspection requirement — Footing and Foundation
06/08/2026
Special inspection requirement — Final
07/29/2022
Objection resolved — Addressed
07/29/2022
Objection resolved — Addressed
07/29/2022
Objection resolved — Addressed
07/29/2022
Objection resolved — Addressed
07/29/2022
Objection resolved — Addressed
07/29/2022
Special inspection requirement — Fenestration areas
Jeffrey Zaborski
07/29/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Zaborski
07/29/2022
Special inspection requirement — Fenestration air leakage
Jeffrey Zaborski
07/22/2022
Objection raised — Inspections
07/22/2022
Objection raised — Scope
07/22/2022
Objection raised — Other
07/22/2022
Objection raised — Structural
07/22/2022
Objection raised — Energy
07/18/2022
Filed — Alteration
REMOVAL OF WINDOW DOOR AND WALL SECTION TO INSTALL NEW GLASS PANELS AND DOOR AT REAR FACADE.
B00748347-I1
05/31/2022
Special inspection requirement — Structural Steel - Details
David Bueno
05/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Bueno
05/31/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Bueno
05/31/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Zaborski
05/31/2022
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Zaborski
05/31/2022
Special inspection requirement — Final
Jeffrey Zaborski
05/31/2022
Special inspection requirement — Masonry
David Bueno
05/31/2022
Special inspection requirement — Air barrier - visual inspection
Jeffrey Zaborski
05/31/2022
Special inspection requirement — Insulation placement and R values
Jeffrey Zaborski
07/07/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLA RENOVATIONS, LLC08/17/2026
BISOTISSUEDEMPOWER CES LLC11/24/2019
BISPLISSUEDNESS MECHANICAL P & H INC09/02/2015
BISMHISSUEDSUPER STAR CONSTRUCTION I04/10/2015
BISOTISSUEDSUPER STAR CONSTRUCTION I03/25/2015
BISOTISSUEDSUPER STAR CONSTRUCTION I01/20/2015
1 project · most recent 07/03/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/03/2026——Gas, Water/Sanitary
1 project · most recent 11/05/2020
FiledStatusContractorScope
11/05/2020CompleteISLAND ELECTRIC CORP—
2 projects · most recent 07/03/2026
Steel Masonry
FiledStatusContractorScope
07/03/2026——Steel
07/18/2022Permit IssuedLA RENOVATIONS, LLCSteel, Masonry
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/30/2026Concrete - Cast-In-Place—special
06/30/2026Structural Steel - Welding—special
06/30/2026Structural Steel - Details—special
06/30/2026Structural Stability – Alterations of existing buildings—special
06/08/2026Footing and Foundation—progress
06/08/2026Final—progress
07/29/2022Fenestration areasJeffrey Zaborskienergy_progress
07/29/2022Fenestration and door U-factor and product ratingsJeffrey Zaborskienergy_progress
07/29/2022Fenestration air leakageJeffrey Zaborskienergy_progress
05/31/2022Structural Steel - DetailsDavid Buenospecial
05/31/2022Fire-Resistant Penetrations and JointsDavid Buenospecial
05/31/2022Structural Stability – Alterations of existing buildingsDavid Buenospecial
05/31/2022Fire-Resistance Rated ConstructionJeffrey Zaborskiprogress
05/31/2022Energy Code Compliance InspectionsJeffrey Zaborskiprogress
05/31/2022FinalJeffrey Zaborskiprogress
05/31/2022MasonryDavid Buenospecial
05/31/2022Air barrier - visual inspectionJeffrey Zaborskienergy_progress
05/31/2022Insulation placement and R valuesJeffrey Zaborskienergy_progress
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/15/2026B01413684-S1Request digital key ↗
08/15/2026B00748347-I1Request digital key ↗
08/15/2026B01413684-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
11/24/2019340698338Open ↗
09/03/2015320985145Open ↗
04/23/2015320985145Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
10/29/2015320985145Open ↗
10/02/2014320985145Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZoning Diagram (ZD1)1
12/24/2014320985145Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026B00748347-I1Open ↗
08/27/2026B00748347-I1Open ↗
08/27/2026B00748347-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01413684-S1Open ↗
08/16/2026B01413684-I1Open ↗
08/13/2026B00748347-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/15/2015320985145Open ↗
10/02/2014320985145Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/27/2019340698338Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B00748347-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/29/2015320985145Open ↗
10/02/2014320985145Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
09/27/2019340698338Open ↗
▸BISSTREET TREE CHECKLIST1
10/02/2014320985145Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/27/2019340698338Open ↗
10/02/2014320985145Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B01413684-I1Open ↗
08/13/2026B00748347-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
10/02/2014320985145Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/14/2022340698338Open ↗
06/09/2022340698338Open ↗
09/27/2019340698338Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/15/2015320985145Open ↗
10/02/2014320985145Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/27/2019340698338Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
06/09/2022340698338Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/09/2022340698338Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/15/2015320985145Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/09/2022340698338Open ↗
09/27/2019340698338Open ↗
09/27/2019340698338Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/17/2022340698338Open ↗
12/15/2015320985145Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
06/17/2022340698338Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/02/2014320985145Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
09/27/2019340698338Open ↗
12/15/2015320985145Open ↗
10/02/2014320985145Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/09/2022340698338Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/27/2019340698338Open ↗
▸BISEFILING COVER SHEET1
10/02/2014320985145Open ↗
▸Other Documents2
▸BISTax Abatement Miscellaneous1
06/10/2022340698338Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/15/2026B00748347-I1Open ↗