← Back
Three families
1544 PACIFIC STREET
BROOKLYN · BIN 3035638
💬 Discuss this project
2004Year Built
3Stories
C0Building Class
R6Zoning
4,560 sfGross Floor Area
3Units
Rent Stabilized19 Open Violations 18 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · 2,143 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 32p · 1 filing · 13 docs
Floor 26p · 1 filing · 13 docs
Floor 16p · 1 filing · 13 docs
Cellar6p · 1 filing · 13 docs
Sub-Basement6p · 1 filing · 13 docs
2 jobs · most recent 05/27/2026
FiledStatusContractorScope
05/27/2026Permit IssuedRICHARD NEU—
05/24/2025CompleteRICHARD NEU—
1 job · most recent 09/10/2025
Wood
FiledStatusContractorScope
09/10/2025Permit IssuedICE AGE MECHANICAL CORPWood
1 job · most recent 09/13/2025
Scaffold
FiledStatusContractorScope
09/13/2025Permit IssuedPARK CONTRACTING GROUPScaffold
Building Lifecycle
All (54)Filed (4)Permit Issued (5)Violation (35)Special Inspection (10)
05/27/2026
Permit issued — Sidewalk Shed
B01230431-I1-SH
05/05/2026
Violation issued (HPD, closed)
A
04/17/2026
Violation issued (ECB, open)
Construction
09/15/2025
Permit issued — Supported Scaffold
B01286550-I1-SF
09/15/2025
Permit issued — General Construction
B01220450-S1-GC
09/13/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01286550-I1
09/10/2025
Filed — Alteration
filing for partital demolition, temp shoring to address IED # 19160 at the exterior wall noted on plans. No change to use, egress and occupancy.
B01220450-S1
06/25/2025
Special inspection requirement — Air barrier - visual inspection
SHERIF ABDEL-MESEH
06/25/2025
Special inspection requirement — Final
SHERIF ABDEL-MESEH
06/25/2025
Special inspection requirement — Energy Code Compliance Inspections
SHERIF ABDEL-MESEH
06/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
SHERIF ABDEL-MESEH
06/25/2025
Special inspection requirement — Insulation placement and R values
SHERIF ABDEL-MESEH
06/10/2025
Violation issued (HPD, closed)
A
05/28/2025
Permit issued — Sidewalk Shed
B01230431-I1-SH
05/27/2025
Filed — Alteration
B01230431-I1
05/07/2025
Permit issued — Structural
B01220450-I1-GC-CX
05/06/2025
Filed — Alteration
filing for partital demolition, temp shoring to address IED # 19160 at the exterior wall noted on plans. No change to use, egress and occupancy.
B01220450-I1
05/05/2025
Special inspection requirement — Structural Wood Frame
Magdy Youssef
05/04/2025
Special inspection requirement — Demolition
Magdy Youssef
05/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
05/04/2025
Special inspection requirement — Wood – Seismic Resistance
Magdy Youssef
05/04/2025
Special inspection requirement — Final
Magdy Youssef
04/17/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/09/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/09/2025
Violation issued (ECB, open)
Construction
04/09/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2024
Violation issued (HPD, closed)
A
03/24/2023
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
11/28/2017
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
01/21/2015
Violation issued (HPD, open)
B
01/21/2015
Violation issued (HPD, closed)
C
01/21/2015
Violation issued (HPD, open)
B
01/21/2015
Violation issued (HPD, open)
B
01/21/2015
Violation issued (HPD, open)
B
01/21/2015
Violation issued (HPD, open)
B
01/21/2015
Violation issued (HPD, open)
C
01/21/2015
Violation issued (HPD, open)
B
06/06/2011
Violation issued (HPD, open)
B
06/06/2011
Violation issued (HPD, open)
B
06/06/2011
Violation issued (HPD, open)
B
06/06/2011
Violation issued (HPD, open)
B
06/06/2011
Violation issued (HPD, open)
B
06/06/2011
Violation issued (HPD, open)
B
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP807/08/2026
CONSTRUCTIONLABLLC504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP209/13/2025
URBAN DESIGN ENGINEERING109/10/2025
MJ ENGINEERING & DESIGN105/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION LAB403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK CONTRACTING GROUPGeneral Contractor307/08/2026
SASCO BUILDERS INCGeneral Contractor203/21/2026
ICE AGE MECHANICAL CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN5546105/06/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP05/27/2026
DOB NOWSupported ScaffoldPermit IssuedPARK CONTRACTING GROUP09/15/2025
DOB NOWGeneral ConstructionPermit IssuedICE AGE MECHANICAL CORP09/15/2025
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP05/28/2025
DOB NOWStructuralPermit IssuedSASCO BUILDERS INC05/07/2025
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/25/2025Air barrier - visual inspectionSHERIF ABDEL-MESEHenergy_progress
06/25/2025FinalSHERIF ABDEL-MESEHprogress
06/25/2025Energy Code Compliance InspectionsSHERIF ABDEL-MESEHprogress
06/25/2025Fire-Resistance Rated ConstructionSHERIF ABDEL-MESEHprogress
06/25/2025Insulation placement and R valuesSHERIF ABDEL-MESEHenergy_progress
05/05/2025Structural Wood FrameMagdy Youssefprogress
05/04/2025DemolitionMagdy Youssefspecial
05/04/2025Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
05/04/2025Wood – Seismic ResistanceMagdy Youssefspecial
05/04/2025FinalMagdy Youssefprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01230431-I1Request digital key ↗
08/20/2026B01220450-I1Request digital key ↗
08/20/2026B01220450-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01220450-S1Open ↗
09/02/2026B01220450-S1Open ↗
09/02/2026B01220450-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01230431-I1Open ↗
08/20/2026B01220450-I1Open ↗
08/20/2026B01220450-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B01220450-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01220450-I1Open ↗
08/20/2026B01220450-S1Open ↗