← Back
Two family brick
1293 PARK PLACE
BROOKLYN · BIN 3036190
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R6Zoning
2,160 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family brick · Owner of record: EAST 52 STREET HOLDINGS CORP · 2,555 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JEWEL VENTURES509/18/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2025$1.0M—Private party → EAST 52 STREET HOLDINGS CORP$465/sf building
10/17/2024$1.4M—Private party → U.S. BANK TRUST, NATIONAL ASSOCIATION, NOT IN ITS$632/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC408/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING SOLUTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor107/04/2026
ARANDA PLBG & HTG CORPPlumbing109/18/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323104/29/2025
Building Lifecycle
All (28)Filed (4)Permit Issued (3)Violation (1)Inspection (5)Special Inspection (15)
09/17/2026
Permit issued — Plumbing
B01208335-S1-PL
08/24/2026
Filed — Alteration
HEREWITH FILING TO PROPOSED RENOVATION TO EXISTING 2 STORY W/ BASEMENT; 2 FAMILY DWELLING. NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01208335-P2
07/16/2026
Filed — Alteration
HEREWITH FILING TO PROPOSED RENOVATION TO EXISTING 2 STORY W/ BASEMENT; 2 FAMILY DWELLING. NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01208335-P1
02/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2025
Violation issued (HPD, open)
I
07/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/12/2025
Permit issued — Plumbing
B01208335-S1-PL
05/06/2025
Filed — Alteration
HEREWITH FILING TO PROPOSED RENOVATION TO EXISTING 2 STORY W/ BASEMENT; 2 FAMILY DWELLING. NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01208335-S1
04/30/2025
Permit issued — General Construction
B01208335-I1-GC
04/29/2025
Filed — Alteration
HEREWITH FILING TO PROPOSED RENOVATION TO EXISTING 2 STORY W/ BASEMENT; 2 FAMILY DWELLING. NEW GYP BOARD, REPLACE WINDOWS AND ALL FINISHES AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01208335-I1
04/24/2025
Special inspection requirement — Exterior lighting power
William Alicea
04/24/2025
Special inspection requirement — Interior lighting power
William Alicea
04/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
04/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
William Alicea
04/24/2025
Special inspection requirement — Lighting controls
William Alicea
04/24/2025
Special inspection requirement — Lighting in dwelling units
William Alicea
04/24/2025
Special inspection requirement — Air barrier - visual inspection
William Alicea
04/24/2025
Special inspection requirement — Fenestration air leakage
William Alicea
04/24/2025
Special inspection requirement — Fenestration areas
William Alicea
04/24/2025
Special inspection requirement — Maintenance information
William Alicea
04/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
William Alicea
04/24/2025
Special inspection requirement — Permanent certificate
William Alicea
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
04/09/2025
Special inspection requirement — Final
William Alicea
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP09/17/2026
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS05/12/2025
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO04/30/2025
1 project · most recent 08/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/24/2026Signed-offARANDA PLBG & HTG CORPGas, Water/Sanitary
1 project · most recent 03/24/2025
General Wiring
FiledStatusContractorScope
03/24/2025CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/24/2025Exterior lighting powerWilliam Aliceaenergy_progress
04/24/2025Interior lighting powerWilliam Aliceaenergy_progress
04/24/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
04/24/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
04/24/2025Fire-Resistance Rated ConstructionWilliam Aliceaprogress
04/24/2025Lighting controlsWilliam Aliceaenergy_progress
04/24/2025Lighting in dwelling unitsWilliam Aliceaenergy_progress
04/24/2025Air barrier - visual inspectionWilliam Aliceaenergy_progress
04/24/2025Fenestration air leakageWilliam Aliceaenergy_progress
04/24/2025Fenestration areasWilliam Aliceaenergy_progress
04/24/2025Maintenance informationWilliam Aliceaenergy_progress
04/24/2025Fenestration and door U-factor and product ratingsWilliam Aliceaenergy_progress
04/24/2025Permanent certificateWilliam Aliceaenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
04/09/2025FinalWilliam Aliceaprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01208335-P2Request digital key ↗
08/21/2026B01208335-S1Request digital key ↗
08/21/2026B01208335-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01208335-P1Open ↗
08/21/2026B01208335-P2Open ↗
08/21/2026B01208335-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01208335-I1Open ↗
08/25/2026B01208335-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01208335-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01208335-P1Open ↗
08/21/2026B01208335-P2Open ↗
08/13/2026B01208335-I1Open ↗
Showing 3 of 4 on file for this type