← Back
Walk-up cooperative
578 RALPH AVENUE
BROOKLYN · BIN 3037219
💬 Discuss this project
1922Year Built
4Stories
C6Building Class
R6Zoning
14,400 sfGross Floor Area
19Units
Rent Stabilized102 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 578 RALPH AVENUE HOUS · 4,000 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 41 filing · 12 docs
Floor 31 filing · 12 docs
Floor 21 filing · 12 docs
Floor 11p · 2 filings · 16 docs
Cellar2p · 1 filing · 12 docs
2 jobs · most recent 07/02/2025
Gas
FiledStatusContractorScope
07/02/2025Permit IssuedM & M PIPING AND HEATINGGas
04/24/2023Permit IssuedM & M PIPING AND HEATINGGas
1 job · most recent 07/22/2022
General Wiring
FiledStatusContractorScope
07/22/2022Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
Building Lifecycle
All (91)Filed (6)Permit Issued (4)Violation (60)Inspection (8)Objection (8)Special Inspection (5)
05/05/2026
Violation issued (HPD, open)
A
04/23/2026
Violation issued (HPD, open)
C
04/23/2026
Violation issued (HPD, open)
C
02/25/2026
Violation issued (HPD, open)
A
02/25/2026
Violation issued (HPD, open)
B
02/07/2026
Violation issued (HPD, closed)
C
02/07/2026
Violation issued (HPD, open)
C
01/22/2026
Violation issued (HPD, open)
B
01/22/2026
Violation issued (HPD, open)
B
12/06/2025
Violation issued (HPD, open)
B
12/06/2025
Violation issued (HPD, open)
A
12/06/2025
Violation issued (HPD, open)
B
12/01/2025
Violation issued (FDNY_ORDER, closed)
12/01/2025
Violation issued (FDNY_ORDER, closed)
12/01/2025
Violation issued (FDNY_ORDER, closed)
12/01/2025
Violation issued (FDNY_ORDER, closed)
12/01/2025
Violation issued (FDNY_ORDER, closed)
11/20/2025
Violation issued (HPD, closed)
I
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, open)
C
10/30/2025
Violation issued (HPD, closed)
A
10/30/2025
Violation issued (HPD, closed)
C
10/30/2025
Violation issued (HPD, open)
B
10/30/2025
Violation issued (HPD, open)
B
10/30/2025
Violation issued (HPD, open)
B
10/30/2025
Violation issued (HPD, open)
B
10/30/2025
Violation issued (HPD, closed)
A
10/01/2025
Violation issued (HPD, open)
B
10/01/2025
Violation issued (HPD, open)
B
08/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/02/2025
Filed — Alteration
add separate Navien heater unit on each apartment, all as shown on attached drawings submitted. REVISE DRAWINGS SHOWING AS BUILT CONDITIONS. REVISED DRAWINGS TO SATISFY PLUMBING INSPECTION.
B00849798-P3
06/10/2025
Violation issued (HPD, open)
A
05/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/03/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/16/2025
Filed — Alteration
add separate Navien heater unit on each apartment, all as shown on attached drawings submitted. REVISE DRAWINGS SHOWING AS BUILT CONDITIONS. REVISED DRAWINGS TO SATISFY PLUMBING INSPECTION.
B00849798-P2
04/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Violation issued (HPD, open)
B
04/10/2025
Violation issued (HPD, open)
B
04/10/2025
Violation issued (HPD, open)
B
04/10/2025
Violation issued (HPD, open)
B
04/10/2025
Violation issued (HPD, open)
C
04/10/2025
Violation issued (HPD, closed)
C
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/21/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/11/2025
Permit issued — Plumbing
B00856053-I1-PL
02/07/2025
Filed — Alteration
add separate Navien heater unit on each apartment, all as shown on attached drawings submitted. REVISE DRAWINGS SHOWING AS BUILT CONDITIONS. REVISED DRAWINGS TO SATISFY PLUMBING INSPECTION.
B00849798-P1
01/23/2025
Violation issued (HPD, closed)
C
01/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/29/2024
Violation issued (HPD, closed)
I
11/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/18/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/25/2024
Permit issued — Plumbing
B00849798-I1-PL
05/15/2024
Filed — Alteration
add separate Navien heater unit on each apartment, all as shown on attached drawings submitted. REVISE DRAWINGS SHOWING AS BUILT CONDITIONS. REVISED DRAWINGS TO SATISFY PLUMBING INSPECTION.
B00849798-I1
04/28/2024
Violation issued (HPD, closed)
A
04/28/2024
Violation issued (HPD, open)
B
04/28/2024
Violation issued (HPD, open)
B
04/28/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
04/17/2024
Violation issued (HPD, open)
B
Latest 60 of 91 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
578 RALPH AVENUE HOUS103/22/2026
578 RALPH AVENUE HOUS LES103/22/2026
578 RALPH AVE HOUSING103/22/2026
HPD103/21/2026
578 RALPH AVE HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ART OF FORM, ARCHITECTS507/02/2025
ALPHA HOME DESIGN LLC109/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ART OF FORM ARCHITECTS1003/21/2026
INDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & M PIPING AND HEATINGPlumbing307/08/2026
ANDREW MYHRE INCElectrical103/21/2026
ENGLISH, CLAUDIUSElectrical103/21/2026
GOODE, BRIANElectrical103/21/2026
SIGN MASTER USA INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619109/29/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING03/11/2025
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING06/25/2024
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING06/29/2023
DOB NOWGeneral ConstructionPermit IssuedSIGN MASTER USA INC11/10/2022
BISMHISSUEDMEDRA EXHAUST SYSTEMS COR07/11/2017
BISOTISSUEDA&A BUILDING CONSULTANTS07/07/2017
BISPLISSUEDV.A.L. PLUMBING & HTG COR07/07/2017
BISOTISSUEDDAMO CONSTRUCTION04/12/1994
BISPLISSUEDEDWARD ESBIN & SONS, INC.12/07/1993
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/21/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
11/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/18/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/03/2025Tenant Protection Plan Compliance—special
05/14/2025Tenant Protection Plan Compliance—special
04/01/2025Tenant Protection Plan Compliance—special
01/22/2025Tenant Protection Plan Compliance—special
06/20/2023Energy Code Compliance InspectionsMark Searageprogress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B08012705-I1Request digital key ↗
08/21/2026B00849798-P1Request digital key ↗
08/21/2026B00849798-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
07/13/2017321618175Open ↗
07/12/2017321618175Open ↗
07/12/2017321618175Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/12/2017321618175Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B08012705-I1Open ↗
08/27/2026B00856053-I1Open ↗
08/21/2026B00849798-P2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/12/2017321618175Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/12/2017321618175Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/12/2017321618175Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00856053-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/12/2017321618175Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B00849798-P2Open ↗
08/21/2026B00849798-P1Open ↗
08/21/2026B00849798-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/12/2017321618175Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/12/2017321618175Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/12/2017321618175Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/14/2017321618175Open ↗