← Back
Two family brick
1486 EASTERN PARKWAY
BROOKLYN · BIN 3039524
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6Zoning
2,660 sfGross Floor Area
2Units
Two family brick · 2,260 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 5 docs
Basement3p · 1 filing · 5 docs
1 job · most recent 08/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin 2MXM18AVJU9 18,000 BTU · Heat Pump Outdoor ×5
3MXM24AVJU9 24,000 BTU · Heat Pump Outdoor ×5
Ventilation
Greenheck G-095-VG 350 CFM · Exhaust Fan ×20
Nutone PTE511RK 50 CFM · Ptac ×10
PTEL511RK 100 CFM · Exhaust Fan ×10
1 job · most recent 08/20/2026
Sprinkler System
FiledStatusContractorScope
08/20/2026——Sprinkler System
Building Lifecycle
All (38)Filed (2)Objection (22)Special Inspection (14)
09/16/2026
Objection resolved — Resolved
09/11/2026
Objection raised — Other
08/20/2026
Filed — Alteration CO
Interior renovation to increase number of dwelling units from 2 to 10 units to an existing 2 story + basement building.
B01428267-S2
08/19/2026
Special inspection requirement — Sprinkler Systems
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Resolved
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/15/2026
Filed — Alteration CO
Interior renovation to increase number of dwelling units from 2 to 10 units to an existing 2 story + basement building.
B01428267-I1
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/08/2026
Special inspection requirement — Maintenance information
07/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/08/2026
Special inspection requirement — Insulation placement and R values
07/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/08/2026
Special inspection requirement — Fenestration areas
07/08/2026
Special inspection requirement — Air barrier - visual inspection
07/08/2026
Special inspection requirement — Permanent certificate
07/08/2026
Special inspection requirement — Interior lighting power
07/08/2026
Special inspection requirement — Fenestration air leakage
07/08/2026
Special inspection requirement — Metering
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/08/2013$535K—Private party → Private party$201/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE108/20/2026
KMA DESIGNS LLC107/15/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/19/2026Sprinkler Systems—special
07/08/2026Fire-Resistant Penetrations and Joints—special
07/08/2026Energy Code Compliance Inspections—progress
07/08/2026Fire-Resistance Rated Construction—progress
07/08/2026Maintenance information—energy_progress
07/08/2026Fenestration and door U-factor and product ratings—energy_progress
07/08/2026Insulation placement and R values—energy_progress
07/08/2026Structural Stability – Alterations of existing buildings—special
07/08/2026Fenestration areas—energy_progress
07/08/2026Air barrier - visual inspection—energy_progress
07/08/2026Permanent certificate—energy_progress
07/08/2026Interior lighting power—energy_progress
07/08/2026Fenestration air leakage—energy_progress
07/08/2026Metering—energy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026B01428267-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026B01428267-S2Open ↗
08/16/2026B01428267-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01428267-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026B01428267-I1Open ↗