← Back
Primarily 2 family with 1 store or office
99 RALPH AVENUE
BROOKLYN · BIN 3039740
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
R6AZoning
3,300 sfGross Floor Area
3Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,500 sf lot · 2.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 2 filings · 15 docs
Floor 31p · 1 filing · 7 docs
Floor 22p · 1 filing · 7 docs
Floor 12p · 1 filing · 7 docs
Cellar2p · 2 filings · 15 docs
1 job · most recent 06/22/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2026Signed-offEDMUND S. JOSEPHHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric msz-gx09nl 10 BTU · Split System ×3
1 job · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
Building Lifecycle
All (86)Filed (3)Permit Issued (1)Signed Off (1)Violation (22)Objection (39)Special Inspection (20)
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/14/2026
Objection raised — Scope
08/14/2026
Objection raised — Scope
08/14/2026
Objection raised — Zoning
07/01/2026
Signed off — Alteration
HEREWITH FILING FOR AN INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01394103-I1
06/22/2026
Filed — Alteration
HEREWITH FILING FOR AN INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01394103-S1
06/04/2026
Special inspection requirement — Mechanical Systems
06/04/2026
Special inspection requirement — Final
05/05/2026
Permit issued — General Construction
B01394103-I1-GC
05/05/2026
Violation issued (HPD, open)
A
05/01/2026
Filed — Alteration
HEREWITH FILING FOR AN INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01394103-I1
04/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
04/29/2026
Special inspection requirement — Final
ADITYA DESAI
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
04/04/2024
Objection raised — Other
04/04/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/28/2024
Objection resolved — Addressed
03/20/2024
Special inspection requirement — Exterior lighting power
03/19/2024
Objection raised — Zoning
03/19/2024
Objection raised — Other
03/19/2024
Objection raised — Other
03/19/2024
Objection raised — Other
03/19/2024
Objection raised — Zoning
03/19/2024
Objection raised — Zoning
03/19/2024
Objection raised — Other
03/19/2024
Objection raised — Other
03/19/2024
Objection raised — Other
03/19/2024
Objection raised — Zoning
03/19/2024
Objection raised — Zoning
03/19/2024
Objection raised — Zoning
03/19/2024
Objection raised — Zoning
03/19/2024
Objection raised — Accessibility
03/19/2024
Objection raised — Fire_Protection
03/13/2024
Objection raised — Zoning
02/26/2024
Filed — Alteration CO
Proposing ALT1 interior renovation and conversion to 6 dwelling units and 1 commercial space
B01008072-I1
02/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
02/22/2024
Special inspection requirement — Air barrier - visual inspection
02/22/2024
Special inspection requirement — Lighting controls
02/22/2024
Special inspection requirement — Insulation placement and R values
02/22/2024
Special inspection requirement — Fenestration areas
02/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 86 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RESIDENTS GROUP309/13/2026
MJH CONSTRUCTION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLHJOU ENGINEERING PLLC106/22/2026
PRAMODRAY SHAH, P.E.105/01/2026
LEANDRO NILS DICKSON ARCHITECT, LLC102/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EDMUND S. JOSEPHGeneral Contractor107/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818105/01/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEDMUND S. JOSEPH05/05/2026
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/04/2026Mechanical Systems—special
06/04/2026Final—progress
04/30/2026Fire-Resistant Penetrations and JointsNORMAN LOKspecial
04/29/2026FinalADITYA DESAIprogress
03/20/2024Exterior lighting power—energy_progress
02/22/2024Fenestration and door U-factor and product ratings—energy_progress
02/22/2024Air barrier - visual inspection—energy_progress
02/22/2024Lighting controls—energy_progress
02/22/2024Insulation placement and R values—energy_progress
02/22/2024Fenestration areas—energy_progress
02/22/2024Fire-Resistant Penetrations and Joints—special
02/22/2024Interior lighting power—energy_progress
02/22/2024Lighting in dwelling units—energy_progress
02/22/2024Maintenance information—energy_progress
02/22/2024Metering—energy_progress
02/22/2024Fenestration air leakage—energy_progress
02/22/2024Exterior Insulation and Finish Systems (EIFS)—special
02/22/2024Structural Stability – Alterations of existing buildings—special
02/22/2024Energy Code Compliance Inspections—progress
02/22/2024Fire-Resistance Rated Construction—progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026B01394103-S1Request digital key ↗
08/17/2026B01394103-I1Request digital key ↗
08/15/2026B01008072-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01008072-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01394103-S1Open ↗
08/17/2026B01394103-I1Open ↗
08/13/2026B01008072-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026B01394103-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01394103-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01008072-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01394103-S1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01008072-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01008072-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01008072-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01008072-I1Open ↗