← Back
Three families
2118 FULTON STREET
BROOKLYN · BIN 3042169
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R6Zoning
2,600 sfGross Floor Area
3Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Three families · 1,992 sf lot · 1.31 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction7p · 2 filings · 10 docs
CellarUnder Construction1p · 1 filing · 5 docs
1 job · most recent 03/05/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/05/2025Permit IssuedKISHAN PLUMBING INCGas, Water/Sanitary
2 jobs · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026Permit IssuedRICHARD NEU—
12/11/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
Building Lifecycle
All (56)Filed (2)Permit Issued (3)Violation (24)Inspection (1)Objection (22)Special Inspection (4)
09/01/2026
Permit issued — Sidewalk Shed
B01453399-I1-SH
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2026
Violation issued (HPD, open)
A
04/16/2026
Permit issued — Plumbing
B01180715-I1-PL
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Objection resolved — Addressed
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGEY BOLOTOV
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SERGEY BOLOTOV
02/25/2026
Objection raised — Energy
02/25/2026
Objection raised — Cost
02/25/2026
Objection raised — Plumbing
02/25/2026
Objection raised — Plumbing
02/25/2026
Objection raised — Plumbing
02/25/2026
Objection raised — Plumbing
02/25/2026
Objection raised — Plumbing
02/12/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Plumbing
02/02/2026
Objection resolved — Addressed
11/20/2025
Violation issued (HPD, open)
I
10/23/2025
Permit issued — General Construction
B01027723-I1-GC
06/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SERGEY BOLOTOV
06/09/2025
Violation issued (HPD, open)
A
03/18/2025
Objection raised — Plumbing
03/18/2025
Objection raised — Plumbing
03/18/2025
Objection raised — Plumbing
03/05/2025
Filed — Alteration
Install New Plumbing on the first floor.
B01180715-I1
11/29/2024
Violation issued (HPD, open)
I
04/10/2024
Violation issued (HPD, open)
A
04/03/2024
Filed — Alteration
Structural interior renovation to the first floor, replacement, and new window.
B01027723-I1
03/29/2024
Special inspection requirement — Final
SERGEY BOLOTOV
11/22/2023
Violation issued (HPD, open)
I
03/22/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, open)
I
02/24/2022
Violation issued (HPD, open)
I
02/24/2022
Violation issued (HPD, open)
A
04/09/2021
Violation issued (HPD, open)
A
04/09/2021
Violation issued (HPD, open)
I
10/30/2019
Violation issued (HPD, open)
I
10/17/2018
Violation issued (HPD, open)
I
11/22/2017
Violation issued (HPD, open)
I
11/09/2016
Violation issued (HPD, open)
I
10/09/2015
Violation issued (HPD, open)
I
04/18/2013
Violation issued (FDNY_NOV, closed)
08/06/1987
Violation issued (HPD, open)
B
08/06/1987
Violation issued (HPD, open)
B
10/28/1986
Violation issued (HPD, open)
B
10/28/1986
Violation issued (HPD, open)
B
10/28/1986
Violation issued (HPD, open)
B
08/05/1986
Violation issued (HPD, open)
C
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILDING DESIGN CONSULTANCY707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE203/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACE CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA SCAFFOLDING INCGeneral Contractor109/07/2026
LIMITLESS DESIGN STRATEGIGeneral Contractor104/09/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SJS INSPECTIONS AND CONSU8286203/05/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC09/01/2026
DOB NOWPlumbingPermit IssuedKISHAN PLUMBING INC04/16/2026
DOB NOWGeneral ConstructionPermit IssuedLIMITLESS DESIGN STRATEGI10/23/2025
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/09/2026Fire-Resistant Penetrations and JointsSERGEY BOLOTOVspecial
03/09/2026HVAC-R and service water piping design and insulationSERGEY BOLOTOVenergy_progress
06/27/2025Structural Stability – Alterations of existing buildingsSERGEY BOLOTOVspecial
03/29/2024FinalSERGEY BOLOTOVprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026B01027723-I1Request digital key ↗
08/22/2026B01180715-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026B01027723-S1Open ↗
08/25/2026B01027723-I1Open ↗
08/13/2026B01180715-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01027723-I1Open ↗
08/23/2026B01180715-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01027723-I1Open ↗
08/23/2026B01180715-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026B01027723-I1Open ↗
08/25/2026B01027723-S1Open ↗
08/13/2026B01180715-I1Open ↗