Miscellaneous two family
34 GUNTHER PLACE
BROOKLYN · BIN 3042567
💬 Discuss this project
1901Year Built
2Stories
B9Building Class
R5Zoning
2,160 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,320 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof3p · 2 filings · 5 docs
Floor 11p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
2 jobs · most recent 07/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026——Heating and Air Conditioning Systems
Heat / Cool
06/22/2026——Heating and Air Conditioning Systems
Heat / Cool
2 jobs · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring
11/18/2025Permit IssuedALL-RITE ELECT CORP OF NYGeneral Wiring
2 jobs · most recent 07/07/2026
Masonry Wood
FiledStatusContractorScope
07/07/2026——Masonry, Wood
06/22/2026——Masonry, Wood
Building Lifecycle
All (75)Filed (7)Permit Issued (3)Signed Off (3)Violation (2)Inspection (6)Objection (24)Special Inspection (30)
09/15/2026
Objection raised — Energy
09/15/2026
Objection raised — Cost
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Open
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Open
08/04/2026
Objection resolved — Open
08/04/2026
Objection resolved — Open
07/30/2026
Objection resolved — Open
07/30/2026
Objection resolved — Addressed
07/22/2026
Objection raised — Scope
07/21/2026
Objection raised — Scope
07/21/2026
Objection raised — Scope
07/21/2026
Objection raised — Admin
07/21/2026
Objection raised — Fire_Protection
07/21/2026
Objection raised — Scope
07/21/2026
Objection raised — Scope
07/21/2026
Objection raised — Scope
07/21/2026
Objection raised — Fire_Protection
07/21/2026
Objection raised — Fire_Protection
07/21/2026
Objection raised — Scope
07/07/2026
Filed — Alteration CO
ADDITION OF COMMERCIAL USE TO EXISTING 2-FAMILY HOUSE
B01421450-I1
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/23/2026
Special inspection requirement — Interior lighting power
06/23/2026
Special inspection requirement — Mechanical Systems
06/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/23/2026
Special inspection requirement — Final
06/23/2026
Special inspection requirement — Fenestration areas
06/23/2026
Special inspection requirement — Air barrier - visual inspection
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/23/2026
Special inspection requirement — Ventilation and air distribution system
06/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/23/2026
Special inspection requirement — Insulation placement and R values
06/23/2026
Special inspection requirement — Heating Systems
06/23/2026
Special inspection requirement — Masonry
06/23/2026
Special inspection requirement — Lighting controls
06/23/2026
Special inspection requirement — Maintenance information
06/22/2026
Filed — Alteration CO
ADDITION OF COMMERCIAL USE TO EXISTING 2-FAMILY HOUSE
B01406892-I1
05/25/2026
Special inspection requirement — Ventilation and air distribution system
05/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/25/2026
Special inspection requirement — Lighting controls
05/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/25/2026
Special inspection requirement — Final
05/25/2026
Special inspection requirement — Fenestration areas
05/25/2026
Special inspection requirement — Masonry
05/25/2026
Special inspection requirement — Air barrier - visual inspection
05/25/2026
Special inspection requirement — Heating Systems
05/25/2026
Special inspection requirement — Insulation placement and R values
05/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/25/2026
Special inspection requirement — Mechanical Systems
02/26/2026
Signed off — Alteration
INSTALLATION AND REPLACEMENT OF PLUMBING FIXTURES
B01266200-S1
02/10/2026
Signed off — Alteration
INSTALLATION AND REPLACEMENT OF PLUMBING FIXTURES
B01266200-I1
02/10/2026
Signed off — Alteration
INSTALLATION AND REPLACEMENT OF PLUMBING FIXTURES
B01266200-S2
02/09/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
Latest 60 of 75 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2025$860K—GUNTHER 34 LLC → Private party$398/sf building
06/14/2024$600K—Private party → GUNTHER 34 LLC$278/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANJI AWOSIKA ARCHITECT P.C.707/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BANJI ARCHITECT PC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor204/09/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANJI AWOSIKA ARCHITECT P2721401/05/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C10/15/2025
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP09/18/2025
DOB NOWMechanical SystemsSigned-offYAFE MEOD CORP09/18/2025
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/09/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/14/2026Fail-Final General Construction Non-Directive 14FailView ↗
10/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
07/06/2026HVAC-R and service water piping design and insulation—energy_progress
07/06/2026HVAC-R and service water heating equipment—energy_progress
07/06/2026HVAC-R and service water heating system controls—energy_progress
06/23/2026Ventilation and air distribution system—energy_progress
06/23/2026Lighting controls—energy_progress
06/23/2026Air barrier - visual inspection—energy_progress
06/23/2026Fenestration and door U-factor and product ratings—energy_progress
06/23/2026Insulation placement and R values—energy_progress
06/23/2026Final—progress
06/23/2026Masonry—special
06/23/2026Heating Systems—special
06/23/2026Fire-Resistant Penetrations and Joints—special
06/23/2026Mechanical Systems—special
06/23/2026Fenestration areas—energy_progress
06/23/2026Structural Stability – Alterations of existing buildings—special
06/23/2026Interior lighting power—energy_progress
06/23/2026Maintenance information—energy_progress
05/25/2026Structural Stability – Alterations of existing buildings—special
05/25/2026Mechanical Systems—special
05/25/2026Masonry—special
05/25/2026Fire-Resistant Penetrations and Joints—special
05/25/2026Heating Systems—special
05/25/2026Final—progress
05/25/2026HVAC-R and service water piping design and insulation—energy_progress
05/25/2026Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 78.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026B01266200-S1Request digital key ↗
08/19/2026B01266200-I1Request digital key ↗
08/19/2026B01266200-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01421450-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026B01266200-I1Open ↗
08/19/2026B01266200-S1Open ↗
08/19/2026B01266200-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01266200-I1Open ↗
09/23/2026B01266200-I1Open ↗
09/01/2026B01266200-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01266200-I1Open ↗
09/01/2026B01266200-P2Open ↗
08/25/2026B01266200-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026B01266200-I1Open ↗
08/19/2026B01266200-P2Open ↗
08/19/2026B01266200-P1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/15/2026B01421450-I1Open ↗