← Back
Three families
141 MARCUS GARVEY BLVD
BROOKLYN · BIN 3043068
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6AZoning
3,168 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · 2,024 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 3 docs
Bulkhead2p · 1 filing · 3 docs
Penthouse2p · 1 filing · 3 docs
Floor 42p · 1 filing · 3 docs
Floor 31p · 1 filing · 3 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B D DEVELOPMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.301/29/2026
TREND NEW YORK ARCHITECTURE D.P.C.201/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDINGS REPRISENTATIVE LLC1003/21/2026
Building Lifecycle
All (8)Filed (5)Violation (3)
01/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL ENLARGMENT, EXISTING 4 DWELLING UNITS 4 STORYBUILDING.PROPOSED 5 DWELLING UNITS 4 STORY + PENTHOUSE
B01339422-S8
01/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL ENLARGMENT, EXISTING 4 DWELLING UNITS 4 STORYBUILDING.PROPOSED 5 DWELLING UNITS 4 STORY + PENTHOUSE
B01339422-S7
01/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL ENLARGMENT, EXISTING 4 DWELLING UNITS 4 STORYBUILDING.PROPOSED 5 DWELLING UNITS 4 STORY + PENTHOUSE
B01339422-S9
01/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL ENLARGMENT, EXISTING 4 DWELLING UNITS 4 STORYBUILDING.PROPOSED 5 DWELLING UNITS 4 STORY + PENTHOUSE
B01339422-S1
01/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL AND HORIZONTAL ENLARGMENT, EXISTING 4 DWELLING UNITS 4 STORYBUILDING.PROPOSED 5 DWELLING UNITS 4 STORY + PENTHOUSE
B01339422-I1
04/04/2005
Violation issued (ECB, open)
Construction
01/14/2005
Violation issued (ECB, closed)
Construction
01/06/2005
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 01/29/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/29/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXMA54AAVJU 63,000 BTU · Vrf Indoor ×4
RXTA60AAVJU 5,700 BTU · Vrf Outdoor ×4
FXMA18AAVJU 20,000 BTU · Vrf Indoor ×1
FXMA36AAVJU 40,000 BTU · Vrf Indoor ×1
RXTA24AAVJU 25,800 BTU · Vrf Outdoor ×1
RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×1
Qmark CWH3404 10,230 BTU · Electric Heater ×2
CSH-07A 4,266 BTU · Electric Heater ×1
Ventilation
Whisper Warm FV-11VH1 50 CFM · Exhaust Fan ×10
Greenheck SP-110VG 50 CFM · Exhaust Fan ×5
CUE-10HP-VG 800 CFM · Exhaust Fan ×1
G-095-VG 250 CFM · Exhaust Fan ×1
G-098-VG 500 CFM · Exhaust Fan ×1
Daikin VAM300GVJU 300 CFM · Erv ×1
1 project · most recent 01/29/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/29/2026——Storm, Water/Sanitary
2 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/18/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
1 project · most recent 01/29/2026
FiledStatusContractorScope
01/29/2026——1 scope_items
1 project · most recent 01/29/2026
Fence
FiledStatusContractorScope
01/29/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
01/28/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/28/2026Fire-Resistant Penetrations and Joints—special
01/28/2026HVAC-R and service water heating system controls—energy_progress
01/28/2026Maintenance information—energy_progress
01/28/2026HVAC-R and service water piping design and insulation—energy_progress
01/28/2026HVAC-R and service water heating equipment—energy_progress
01/28/2026Fire-Resistant Penetrations and Joints—special
01/28/2026Post-installed Anchors—special
01/21/2026Sprinkler Systems—special
01/02/2026Structural Stability – Alterations of existing buildings—special
12/30/2025Fire-Resistance Rated Construction—progress
12/30/2025Exterior lighting power—energy_progress
12/30/2025Metering—energy_progress
12/30/2025Fenestration areas—energy_progress
12/30/2025Lighting controls—energy_progress
12/30/2025Fenestration air leakage—energy_progress
12/30/2025Protection of exposed foundation insulation—energy_progress
12/30/2025Insulation placement and R values—energy_progress
12/30/2025Lighting in dwelling units—energy_progress
12/30/2025Fenestration and door U-factor and product ratings—energy_progress
12/30/2025Vestibules—energy_progress
12/30/2025Interior lighting power—energy_progress
12/30/2025Maintenance information—energy_progress
12/30/2025Electrical motors and elevators—energy_progress
12/30/2025Air barrier - visual inspection—energy_progress
Latest 25 of 28.
▾Documents — 4 on file (BIS + DOB NOW)
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01339422-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01339422-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01339422-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01339422-I1Open ↗