← Back
Primarily 2 family with 1 store or office
964 DEKALB AVENUE
BROOKLYN · BIN 3043243
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6AZoning
2,532 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 964 DEKALB AVE 168 LLC · 1,500 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
964 DEKALB AVE 1681004/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SU ARCHITECT, P.C.311/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SU ARCHITECT PC6857311/04/2025
Building Lifecycle
All (68)Filed (3)Permit Issued (2)Signed Off (2)Violation (11)Inspection (3)Objection (35)Special Inspection (12)
04/01/2026
Signed off — Alteration
TO INSTALL PLUMBING FIXTURES FOR COMMERCIAL KITCHEN IN CONJUNCTIONWITH GC WORK TYPE B01211883-I1 AS PER PLAN FILED HEREWITH; NO CHANGE OF USE, EGRESS OR CERTIFICATEOF OCCUPANCY
B01244716-I1
03/26/2026
Signed off — Alteration
TO INSTALL PARTITION WALLS AND COMMERCIAL EXHAUST HOOD FOR EXISTING RETAIL SPACE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01211883-I1
02/24/2026
Permit issued — General Construction
B01211883-I1-GC-CX
01/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/26/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2025
Permit issued — Plumbing
B01244716-I1-PL
11/17/2025
Objection resolved — Addressed
11/14/2025
Objection raised — Scope
11/14/2025
Objection raised — Cost
11/14/2025
Objection resolved — Addressed
11/04/2025
Filed — Alteration
TO INSTALL PLUMBING FIXTURES FOR COMMERCIAL KITCHEN IN CONJUNCTIONWITH GC WORK TYPE B01211883-I1 AS PER PLAN FILED HEREWITH; NO CHANGE OF USE, EGRESS OR CERTIFICATEOF OCCUPANCY
B01244716-I1
11/04/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Cost
10/08/2025
Objection resolved — Addressed
10/01/2025
Objection resolved — Addressed
09/09/2025
Objection raised — Structural
09/09/2025
Objection raised — Fire_Protection
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Plumbing
09/09/2025
Objection raised — Fire_Protection
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Energy
09/09/2025
Objection raised — Structural
09/09/2025
Objection raised — Plumbing
08/27/2025
Filed — Alteration
TO INSTALL PARTITION WALLS AND COMMERCIAL EXHAUST HOOD FOR EXISTING RETAIL SPACE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01278061-I1
08/26/2025
Special inspection requirement — Ventilation and air distribution system
QIANG SU
08/26/2025
Special inspection requirement — Mechanical Systems
QIANG SU
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
08/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
08/26/2025
Special inspection requirement — Final
08/11/2025
Objection raised — Fire_Protection
06/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
QIANG SU
06/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
06/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
06/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
06/10/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Scope
04/25/2025
Objection raised — Admin
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Structural
04/25/2025
Objection raised — Fire_Protection
04/23/2025
Filed — Alteration
TO INSTALL PARTITION WALLS AND COMMERCIAL EXHAUST HOOD FOR EXISTING RETAIL SPACE WITH GENERAL CONSTRUCTION AND MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01211883-I1
11/28/2023
Violation issued (HPD, closed)
I
03/13/2023
Violation issued (HPD, closed)
C
03/13/2023
Violation issued (HPD, closed)
C
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC02/24/2026
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/12/2025
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEMS04/15/2002
1 project · most recent 08/27/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2025——Ventilation Systems
Ventilation
Dayton 56JN93 4,674 CFM · Exhaust Fan ×1
1 project · most recent 08/27/2025
General Wiring
FiledStatusContractorScope
08/27/2025CompleteNASSA ELECTRICAL CONT CORGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/26/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/04/2025Energy Code Compliance InspectionsQIANG SUprogress
08/26/2025Ventilation and air distribution systemQIANG SUenergy_progress
08/26/2025Mechanical SystemsQIANG SUspecial
08/26/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
08/26/2025Tenant Protection Plan ComplianceQIANG SUspecial
08/26/2025Energy Code Compliance InspectionsQIANG SUprogress
08/26/2025Final—progress
06/23/2025Tenant Protection Plan ComplianceQIANG SUspecial
06/23/2025HVAC-R and service water piping design and insulationQIANG SUenergy_progress
06/23/2025HVAC-R and service water heating system controlsQIANG SUenergy_progress
06/23/2025HVAC-R and service water heating equipmentQIANG SUenergy_progress
06/23/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B01278061-I1Request digital key ↗
08/15/2026B01244716-I1Request digital key ↗
08/14/2026B01211883-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01244716-I1Open ↗
09/01/2026B01244716-I1Open ↗
09/01/2026B01244716-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01278061-I1Open ↗
08/13/2026B01211883-I1Open ↗
08/13/2026B01244716-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01244716-I1Open ↗
09/01/2026B01244716-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01278061-I1Open ↗
08/13/2026B01244716-I1Open ↗