← Back
Three families
800 GREENE AVENUE
BROOKLYN · BIN 3044022
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,096 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Three families · 1,436 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Cellar1p · 2 filings · 20 docs
1 job · most recent 11/02/2023
Gas Water/Sanitary
FiledStatusContractorScope
11/02/2023——Gas, Water/Sanitary
Building Lifecycle
All (31)Filed (5)Permit Issued (3)Signed Off (1)Violation (22)
05/04/2026
Violation issued (HPD, open)
A
01/22/2026
Violation issued (ECB, closed)
Construction
11/19/2025
Violation issued (HPD, open)
I
08/12/2025
Signed off — Alteration
REPAIR TWO STAIRS AT THE FRONT OF THE BUILDING. UNDERPINNING AND EXCAVATION, INTERIOR RENOVATION WITH PARTITIONS AT CELLAR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B00948612-I1
06/09/2025
Violation issued (HPD, open)
A
11/29/2024
Permit issued — General Construction
B00948612-I1-GC
11/27/2024
Violation issued (HPD, open)
I
10/23/2024
Permit issued — General Construction
B00948612-I1-GC
10/07/2024
Filed — Alteration
REPAIR TWO STAIRS AT THE FRONT OF THE BUILDING. UNDERPINNING AND EXCAVATION, INTERIOR RENOVATION WITH PARTITIONS AT CELLAR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B00948612-P3
05/01/2024
Filed — Alteration
REPAIR TWO STAIRS AT THE FRONT OF THE BUILDING. UNDERPINNING AND EXCAVATION, INTERIOR RENOVATION WITH PARTITIONS AT CELLAR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B00948612-P2
02/29/2024
Violation issued (ECB, closed)
Construction
02/29/2024
Violation issued (ECB, closed)
Construction
02/22/2024
Permit issued — General Construction
B00948612-I1-GC
12/08/2023
Filed — Alteration
REPAIR TWO STAIRS AT THE FRONT OF THE BUILDING. UNDERPINNING AND EXCAVATION, INTERIOR RENOVATION WITH PARTITIONS AT CELLAR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B00948612-P1
11/21/2023
Violation issued (HPD, closed)
I
11/02/2023
Filed — Alteration
REPAIR TWO STAIRS AT THE FRONT OF THE BUILDING. UNDERPINNING AND EXCAVATION, INTERIOR RENOVATION WITH PARTITIONS AT CELLAR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B00948612-I1
11/02/2023
Filed — Alteration
PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00948629-I1
03/23/2023
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
I
10/30/2019
Violation issued (HPD, closed)
I
10/17/2018
Violation issued (HPD, closed)
I
11/22/2017
Violation issued (HPD, closed)
I
11/09/2016
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/20/2015
Violation issued (HPD, closed)
I
02/07/1995
Violation issued (HPD, open)
C
02/07/1995
Violation issued (HPD, open)
C
02/07/1995
Violation issued (HPD, open)
C
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HUAN DESIGN INC.310/07/2024
L&C ASSOCIATES212/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
LINE CONSTR GROUP, CORPGeneral Contractor303/21/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669310/07/2024
M. INT'L ENGINEERING PLLC3129210/07/2024
NKM ENGINEERING PLLC6244111/02/2023
SQ. ARCH, LLC4802111/02/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/29/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC10/23/2024
DOB NOWGeneral ConstructionSigned-offLINE CONSTR GROUP, CORP02/22/2024
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
10/07/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
10/07/2024Subsurface Investigations (Borings/Test Pits)Paul Raymondspecial
10/07/2024Underpinning and alternate methods of support of buildings and adjacent propertyNARESH MAHANGUspecial
10/07/2024Construction Operations Influencing Adjacent StructuresKaijin Liangspecial
10/07/2024Structural Stability – Alterations of existing buildingsKaijin Liangspecial
10/07/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
10/07/2024FinalZHENHUAN XUprogress
10/07/2024Interior lighting powerZHENHUAN XUenergy_progress
10/07/2024Concrete - Cast-In-PlaceZHENHUAN XUspecial
10/02/2024Construction Operations Influencing Adjacent StructuresNANIK MASSANDspecial
10/02/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
10/02/2024Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
10/02/2024Subsurface Investigations (Borings/Test Pits)Paul Raymondspecial
10/02/2024Underpinning and alternate methods of support of buildings and adjacent propertyNANIK MASSANDspecial
10/02/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
10/02/2024FinalZHENHUAN XUprogress
10/02/2024Interior lighting powerZHENHUAN XUenergy_progress
10/02/2024Concrete - Cast-In-PlaceZHENHUAN XUspecial
11/20/2023Concrete - Cast-In-Place—special
11/20/2023Construction Operations Influencing Adjacent Structures—special
11/20/2023Fire-Resistant Penetrations and Joints—special
11/20/2023Structural Stability – Alterations of existing buildings—special
11/20/2023Subsurface Investigations (Borings/Test Pits)—special
11/20/2023Underpinning and alternate methods of support of buildings and adjacent property—special
11/20/2023Energy Code Compliance Inspections—progress
Latest 25 of 30.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026B00948612-P2Request digital key ↗
08/26/2026B00948612-P1Request digital key ↗
08/26/2026B00948612-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature11
09/18/2026B00948612-P3Open ↗
09/18/2026B00948612-P3Open ↗
09/18/2026B00948612-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/18/2026B00948612-P3Open ↗
09/18/2026B00948612-P3Open ↗
09/18/2026B00948612-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026B00948612-I1Open ↗
08/26/2026B00948612-P3Open ↗
08/26/2026B00948612-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B00948612-P1Open ↗
08/26/2026B00948612-P3Open ↗
08/26/2026B00948612-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026B00948612-I1Open ↗
08/13/2026B00948612-P3Open ↗
08/13/2026B00948612-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00948612-I1Open ↗