← Back
Three families
143 STUYVESANT AVENUE
BROOKLYN · BIN 3044071
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6AZoning
3,600 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸
Three families · 1,500 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 08/10/2022
FiledStatusContractorScope
08/10/2022Permit IssuedTRIPLE T ELECTRIC INC3 meters, 3 new_meters
1 job · most recent 09/15/2026
Steel Wood
FiledStatusContractorScope
09/15/2026——Steel, Wood
Building Lifecycle
All (29)Filed (1)Violation (8)Special Inspection (20)
09/15/2026
Filed — Alteration CO
CONVERSION OF EXISTING 2-1/2 STORY,3 FAMILY IN TO 3 STORY,2 FAMILY DWELLING RAISED UP PARTIAL 3 RD FLOOR ROOF AND NEW STAIR BULKHEAD AS PER PLAN.OBTAIN NEW C.O.
B01458718-I1
09/15/2026
Special inspection requirement — Fenestration air leakage
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/15/2026
Special inspection requirement — Structural Steel - Details
09/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/15/2026
Special inspection requirement — Structural Cold-Formed Steel
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
09/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/15/2026
Special inspection requirement — Structural Wood Frame
09/15/2026
Special inspection requirement — Maintenance information
09/15/2026
Special inspection requirement — Interior lighting power
09/15/2026
Special inspection requirement — Air barrier - visual inspection
09/15/2026
Special inspection requirement — Lighting controls
09/15/2026
Special inspection requirement — Metering
09/15/2026
Special inspection requirement — Lighting in dwelling units
09/15/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/15/2026
Special inspection requirement — Exterior lighting power
09/15/2026
Special inspection requirement — Fenestration areas
09/15/2026
Special inspection requirement — Permanent certificate
09/15/2026
Special inspection requirement — Insulation placement and R values
09/11/2026
Special inspection requirement — Final
05/06/2026
Violation issued (HPD, closed)
A
06/11/2025
Violation issued (HPD, closed)
A
03/27/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
A
11/29/2017
Violation issued (HPD, closed)
I
04/03/2017
Violation issued (ECB, open)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.109/15/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/15/2026Fenestration air leakage—energy_progress
09/15/2026Fire-Resistant Penetrations and Joints—special
09/15/2026Structural Steel - Details—special
09/15/2026Structural Stability – Alterations of existing buildings—special
09/15/2026Structural Cold-Formed Steel—special
09/15/2026Energy Code Compliance Inspections—progress
09/15/2026Fire-Resistance Rated Construction—progress
09/15/2026Structural Wood Frame—progress
09/15/2026Maintenance information—energy_progress
09/15/2026Interior lighting power—energy_progress
09/15/2026Air barrier - visual inspection—energy_progress
09/15/2026Lighting controls—energy_progress
09/15/2026Metering—energy_progress
09/15/2026Lighting in dwelling units—energy_progress
09/15/2026Fenestration and door U-factor and product ratings—energy_progress
09/15/2026Exterior lighting power—energy_progress
09/15/2026Fenestration areas—energy_progress
09/15/2026Permanent certificate—energy_progress
09/15/2026Insulation placement and R values—energy_progress
09/11/2026Final—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/23/2026B01458718-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
09/23/2026B01458718-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
09/23/2026B01458718-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/23/2026B01458718-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/23/2026B01458718-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
09/23/2026B01458718-I1Open ↗
▸DOB NOWPlot Diagram1
09/23/2026B01458718-I1Open ↗
▸DOB NOWSite Survey: Initial1
09/23/2026B01458718-I1Open ↗