← Back
Two family converted from one family
584 QUINCY STREET
BROOKLYN · BIN 3044482
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,700 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC107/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854107/11/2025
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Objection (2)Special Inspection (5)
02/19/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
B01253439-I1
08/05/2025
Permit issued — Solar
B01253439-I1-SL
07/28/2025
Objection resolved — Addressed
07/15/2025
Objection raised — Electrical
07/11/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
B01253439-I1
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
07/09/2025
Special inspection requirement — Final
TOM PETERSEN
07/09/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
05/13/2005
Violation issued (HPD, open)
A
05/19/1993
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY08/05/2025
1 project · most recent 07/10/2025
FiledStatusContractorScope
07/10/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/09/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
07/09/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
07/09/2025Energy Code Compliance InspectionsTOM PETERSENprogress
07/09/2025FinalTOM PETERSENprogress
07/09/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01253439-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01253439-I1Open ↗
08/28/2026B01253439-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01253439-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01253439-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01253439-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01253439-I1Open ↗