Two family converted from one family
824 QUINCY STREET
BROOKLYN · BIN 3044583
💬 Discuss this project
1899Year Built
3Stories
B3Building Class
R6BZoning
2,001 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,667 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction16p · 1 filing · 17 docs
Floor 2Under Construction15p · 1 filing · 17 docs
Floor 1Under Construction15p · 1 filing · 17 docs
CellarUnder Construction17p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/15/2015$900K—— → —$450/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO NYANDAK ARCHITECTURE AND ENG405/21/2026
PATRICK ROSS103/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAFATA, SALVATOREElectrical103/21/2026
LAMBE, EUGENEElectrical103/21/2026
MCLEOD, AElectrical103/21/2026
K.W.MCINTOSH CONSTRUCTIONGeneral Contractor107/08/2026
STUDIO NYANDAK CONSTRUCTIGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing108/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO NYANDAK ARCHITECTU8378303/04/2026
Building Lifecycle
All (52)Filed (5)Permit Issued (4)Signed Off (1)Violation (3)Inspection (5)Objection (10)Special Inspection (24)
08/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/07/2026
Permit issued — Plumbing
B01361705-S1-PL
07/10/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/08/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2026
Permit issued — Structural
B01361705-S2-ST
06/01/2026
Permit issued — Construction Fence
B01361705-S4-FN
05/21/2026
Filed — Alteration
Subsequent filing for proposed plumbing work for the interior renovation of two-family home at ground, 2nd, & 3rd floors. To include demo of existing kitchen at 1st & 3rd Fl. Demo and reconfig of bathrooms on 2nd & 3rd FL. Addition of bathroom on 3rd
B01361705-S4
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Resolved
03/25/2026
Objection raised — Zoning
03/25/2026
Objection raised — Other
03/25/2026
Objection raised — Scope
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/11/2026
Objection raised — Structural
03/11/2026
Objection raised — Admin
03/04/2026
Filed — Alteration
Subsequent filing for proposed plumbing work for the interior renovation of two-family home at ground, 2nd, & 3rd floors. To include demo of existing kitchen at 1st & 3rd Fl. Demo and reconfig of bathrooms on 2nd & 3rd FL. Addition of bathroom on 3rd
B01361705-I1
03/04/2026
Filed — Alteration
Subsequent filing for proposed plumbing work for the interior renovation of two-family home at ground, 2nd, & 3rd floors. To include demo of existing kitchen at 1st & 3rd Fl. Demo and reconfig of bathrooms on 2nd & 3rd FL. Addition of bathroom on 3rd
B01361705-S1
03/04/2026
Filed — Alteration
Subsequent filing for proposed plumbing work for the interior renovation of two-family home at ground, 2nd, & 3rd floors. To include demo of existing kitchen at 1st & 3rd Fl. Demo and reconfig of bathrooms on 2nd & 3rd FL. Addition of bathroom on 3rd
B01361705-S2
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/23/2026
Special inspection requirement — Insulation placement and R values
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/23/2026
Special inspection requirement — Air barrier - visual inspection
02/23/2026
Special inspection requirement — Fenestration air leakage
02/23/2026
Special inspection requirement — Lighting in dwelling units
02/23/2026
Special inspection requirement — Fenestration areas
02/23/2026
Special inspection requirement — Permanent certificate
02/23/2026
Special inspection requirement — Metering
02/23/2026
Special inspection requirement — Maintenance information
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/23/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
02/18/2026
Special inspection requirement — Final
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/11/2025
Signed off — Alteration
Demo of exist. Cellar Slab on grade; const. of new Cellar Concrete Slab on grade at lower elevation; new concrete bench footing on all walls at Cellar level. Const. of new rated walls to enclose boiler; install. (1) sump pit & pump; continue in comments
B01040607-I1
05/07/2024
Permit issued — Structural
B01040607-I1-ST
04/23/2024
Filed — Alteration
Demo of exist. Cellar Slab on grade; const. of new Cellar Concrete Slab on grade at lower elevation; new concrete bench footing on all walls at Cellar level. Const. of new rated walls to enclose boiler; install. (1) sump pit & pump; continue in comments
B01040607-I1
04/23/2024
Special inspection requirement — Post-installed Anchors
TENZIN NYANDAK
04/23/2024
Special inspection requirement — Structural Steel - Details
TENZIN NYANDAK
04/23/2024
Special inspection requirement — Subgrade Inspections
TENZIN NYANDAK
04/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
TENZIN NYANDAK
04/23/2024
Special inspection requirement — Final
TENZIN NYANDAK
04/23/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
TENZIN NYANDAK
04/23/2024
Special inspection requirement — Concrete - Cast-In-Place
TENZIN NYANDAK
04/23/2024
Special inspection requirement — Masonry
TENZIN NYANDAK
08/18/2005
Violation issued (HPD, open)
B
08/18/2005
Violation issued (HPD, open)
C
08/18/2005
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG08/07/2026
DOB NOWStructuralPermit IssuedSTAKE MANAGEMENT LLC06/05/2026
DOB NOWConstruction FencePermit IssuedSTUDIO NYANDAK CONSTRUCTI06/01/2026
DOB NOWStructuralSigned-offK.W.MCINTOSH CONSTRUCTION05/07/2024
BISPLISSUEDZONE PLUMBING & HEATING C08/09/2020
BISOTISSUEDVASTECH CONTRACTING CORP03/25/2019
BISOTISSUEDVASTECH CONTRACTING CORP04/19/2018
1 project · most recent 05/21/2026
Steel Masonry
FiledStatusContractorScope
05/21/2026Permit IssuedJOHN FITZGERALD PLBG &HTGSteel, Masonry
1 project · most recent 05/21/2026
Fence
FiledStatusContractorScope
05/21/2026Permit IssuedJOHN FITZGERALD PLBG &HTGFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
02/23/2026Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
02/23/2026Fire-Resistance Rated Construction—progress
02/23/2026Insulation placement and R values—energy_progress
02/23/2026Fenestration and door U-factor and product ratings—energy_progress
02/23/2026Air barrier - visual inspection—energy_progress
02/23/2026Fenestration air leakage—energy_progress
02/23/2026Lighting in dwelling units—energy_progress
02/23/2026Fenestration areas—energy_progress
02/23/2026Permanent certificate—energy_progress
02/23/2026Metering—energy_progress
02/23/2026Maintenance information—energy_progress
02/23/2026Fire-Resistant Penetrations and Joints—special
02/23/2026Wall Panels, Curtain Walls, and Veneers—special
02/23/2026Energy Code Compliance Inspections—progress
02/18/2026Final—progress
02/18/2026Structural Stability – Alterations of existing buildings—special
04/23/2024Post-installed AnchorsTENZIN NYANDAKspecial
04/23/2024Structural Steel - DetailsTENZIN NYANDAKspecial
04/23/2024Subgrade InspectionsTENZIN NYANDAKspecial
04/23/2024Structural Stability – Alterations of existing buildingsTENZIN NYANDAKspecial
04/23/2024FinalTENZIN NYANDAKprogress
04/23/2024Construction Operations Influencing Adjacent StructuresTENZIN NYANDAKspecial
04/23/2024Concrete - Cast-In-PlaceTENZIN NYANDAKspecial
04/23/2024MasonryTENZIN NYANDAKspecial
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B01040607-I1Request digital key ↗
08/18/2026B01361705-S2Request digital key ↗
08/18/2026B01361705-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION2
08/09/2020321722542Open ↗
04/19/2018321722542Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/18/2026B01361705-I1Open ↗
08/13/2026B01361705-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B01040607-I1Open ↗
08/18/2026B01361705-S1Open ↗
08/18/2026B01361705-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01361705-S1Open ↗
08/27/2026B01040607-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/26/2018321722542Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01040607-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B01040607-I1Open ↗
08/18/2026B01361705-S1Open ↗
08/18/2026B01361705-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/26/2018321722542Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/26/2018321722542Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/26/2018321722542Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/26/2018321722542Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01361705-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01361705-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01361705-I1Open ↗