← Back
Police Department
18 RALPH AVENUE
BROOKLYN · BIN 3044596
💬 Discuss this project
1973Year Built
3Stories
Y2Building Class
R6AZoning
58,745 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸
Police Department · Owner of record: NYC POLICE DEPARTMENT · 25,125 sf lot · 2.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
3 jobs · most recent 10/28/2025
Lighting General Wiring
FiledStatusContractorScope
10/28/2025Permit IssuedVIAL ELECTRIC & COMPANYLighting
03/12/2025CompletePOLARIS ELEC'L CONST CORP—
09/23/2019Permit IssuedAPPROVED ELEC CONT'G INCGeneral Wiring
Building Lifecycle
All (39)Filed (3)Permit Issued (2)Signed Off (2)Violation (17)Objection (8)Special Inspection (7)
07/15/2025
Signed off — Alteration
EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1)4000-GAL GASOLINE UST, CONCRETE FUEL DISPENSING ISLAND. INSTALL NEW (1)4000-GAL GASOLINE DOUBLE WALL FIBERGLASS UST, NEW CONCRETE ISLAND, (1) FUEL DISPENSER & VEEDER ROOT TLS-350R. TANK WILL BE REPLACED IN-KIND.
B00927499-I1
01/24/2025
Signed off — Alteration
Propose to file for support of excavation. No change to use, egress or occupancy.
B01108034-I1
01/03/2025
Filed — Alteration
Propose to file for support of excavation. No change to use, egress or occupancy.
B01108034-P1
12/19/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
12/19/2024
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
09/17/2024
Permit issued — Support of Excavation
B01108034-I1-SE
09/16/2024
Permit issued — Structural
B00927499-I1-GC-CX
09/12/2024
Filed — Alteration
Propose to file for support of excavation. No change to use, egress or occupancy.
B01108034-I1
09/18/2023
Objection resolved — Addressed
09/18/2023
Objection resolved — Addressed
09/18/2023
Objection resolved — Addressed
09/18/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Structural
09/08/2023
Objection raised — Fire_Protection
09/08/2023
Objection raised — Structural
09/08/2023
Objection raised — Structural
08/31/2023
Filed — Alteration
EMPTY, PURGE, CLEAN, REMOVE & DISPOSE OF (1)4000-GAL GASOLINE UST, CONCRETE FUEL DISPENSING ISLAND. INSTALL NEW (1)4000-GAL GASOLINE DOUBLE WALL FIBERGLASS UST, NEW CONCRETE ISLAND, (1) FUEL DISPENSER & VEEDER ROOT TLS-350R. TANK WILL BE REPLACED IN-KIND.
B00927499-I1
08/30/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/30/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
08/30/2023
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
08/30/2023
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
08/30/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/28/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/23/2011
Violation issued (ECB, closed)
Construction
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/1989
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC POLICE DEPARTMENT203/22/2026
NYCPD103/21/2026
NYC DEPT OF DESIGN CONSTRUCTIO303/21/2026
NYC DEPARTMENT OF DESIGN203/21/2026
NYC DEPT OF GEN SERVICES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WALTER T. GORMAN, P.E., P.C.201/03/2025
LIRO ENGINEERS, INC.108/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WALTER T GORMAN PE403/21/2026
P WOLFE CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEMSTAR CONSTRUCTION CORP.General Contractor307/08/2026
DESIGNER'S HOME IMPROVEMEElectrical103/21/2026
FRIDMAN, YURYElectrical103/21/2026
LAUER, BElectrical103/21/2026
ABBRACCIAMENTO, JOHNElectrical103/21/2026
WALTER, ERNESTElectrical103/21/2026
WILLIAMS, KEITHElectrical103/21/2026
MANTEO, AGRIPPINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106301/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offGEMSTAR CONSTRUCTION CORP.09/17/2024
DOB NOWStructuralSigned-offGEMSTAR CONSTRUCTION CORP.09/16/2024
BISPLISSUEDPERFORMANCE PLBG SRVCS IN08/06/2009
BISBLISSUEDPERFORMANCE PL SVC INC10/26/2006
BISPLISSUEDPERFORMANCE PL SVC INC10/26/2006
BISMHISSUEDIDEAL KITCHEN VENTILATION03/21/2003
BISPLISSUEDWADE PLBG & HTG02/14/2002
BISOTISSUEDSTONEWALL CONTRACTING CORP.07/30/2001
BISSPISSUEDLEEWEN CONTR09/01/1999
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.09/18/1998
BISPLISSUEDTHOMAS F.CASH & SONS INC04/02/1998
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/23/1998
BISMHISSUEDWHITESTONE CONSTRUCTION CORP03/23/1998
BISOTISSUEDLARRY E.TYREE INC.12/18/1995
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
12/19/2024Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
12/19/2024Subgrade InspectionsGEORGE GHEBRYALspecial
08/30/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
08/30/2023Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
08/30/2023Subgrade InspectionsGEORGE GHEBRYALspecial
08/30/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
08/30/2023FinalGEORGE GHEBRYALprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01108034-I1Request digital key ↗
08/24/2026B01108034-P1Request digital key ↗
08/14/2026B00927499-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01108034-I1Open ↗
08/13/2026B01108034-P1Open ↗
08/13/2026B00927499-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B00927499-I1Open ↗
08/22/2026B01108034-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B00927499-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00927499-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/24/2026B01108034-I1Open ↗
08/13/2026B01108034-P1Open ↗
08/13/2026B00927499-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026B00927499-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00927499-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01108034-I1Open ↗