← Back
Three families
514 MONROE STREET
BROOKLYN · BIN 3044788
💬 Discuss this project
1905Year Built
3Stories
C0Building Class
R6BZoning
3,200 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction47p · 1 filing · 20 docs
Floor 2Under Construction48p · 1 filing · 20 docs
Floor 1Under Construction44p · 1 filing · 20 docs
CellarUnder Construction50p · 1 filing · 20 docs
Sub-BasementUnder Construction46p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/22/2024$1.5M—Private party → Private party$469/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REKSTUR ARCHITECTURE504/17/2026
BRIAN MCDONOUGH, PE202/10/2026
DIMITRI PAPAGIANNAKIS310/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCHLINK DESIGN CORPGeneral Contractor204/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN496604/17/2026
WINTON GROUP ARCHITECTURE4343704/17/2026
Building Lifecycle
All (81)Filed (10)Permit Issued (4)Violation (16)Inspection (4)Objection (28)Special Inspection (19)
07/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/05/2026
Violation issued (HPD, open)
A
04/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/17/2026
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179590-P7
03/13/2026
Special inspection requirement — Sprinkler Systems
Vladimir Kaushansky
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
02/10/2026
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179590-P6
02/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/06/2026
Special inspection requirement — Sprinkler Systems
Vladimir Kaushansky
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
01/29/2026
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179590-P5
01/27/2026
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179590-P3
12/09/2025
Permit issued — Sprinklers
B01179590-S3-EW-SP
12/08/2025
Permit issued — Plumbing
B01179590-S1-PL
10/15/2025
Special inspection requirement — Post-installed Anchors
ANTHONY UGBEBOR
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANTHONY UGBEBOR
10/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
ANTHONY UGBEBOR
10/15/2025
Special inspection requirement — Structural Steel - Details
ANTHONY UGBEBOR
10/15/2025
Special inspection requirement — Final
ANTHONY UGBEBOR
10/08/2025
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179590-P2
10/06/2025
Special inspection requirement — Structural Steel - High Strength Bolting
ANTHONY UGBEBOR
10/06/2025
Special inspection requirement — Post-installed Anchors
ANTHONY UGBEBOR
10/06/2025
Special inspection requirement — Final
ANTHONY UGBEBOR
10/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ANTHONY UGBEBOR
10/06/2025
Special inspection requirement — Structural Steel - Details
ANTHONY UGBEBOR
07/14/2025
Permit issued — Structural
B01179590-S2-ST
07/10/2025
Permit issued — General Construction
B01179590-I1-GC
06/10/2025
Violation issued (HPD, open)
A
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
05/30/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Scope
05/28/2025
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179590-S3
05/20/2025
Filed — Alteration
STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01179590-P1
05/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/09/2025
Special inspection requirement — Final
05/09/2025
Special inspection requirement — Structural Steel - High Strength Bolting
05/09/2025
Special inspection requirement — Structural Steel - Details
04/29/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/17/2025
Objection resolved — Addressed
04/16/2025
Objection raised — Scope
04/16/2025
Objection raised — Fire_Protection
04/16/2025
Objection raised — Scope
04/08/2025
Objection raised — Scope
04/01/2025
Objection resolved — Addressed
03/20/2025
Objection resolved — Addressed
03/20/2025
Objection resolved — Addressed
03/20/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection resolved — Addressed
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBIN12/09/2025
DOB NOWPlumbingPermit IssuedLG ELITE PLUMBING INC12/08/2025
DOB NOWStructuralSigned-offARCHLINK DESIGN CORP07/14/2025
DOB NOWGeneral ConstructionPermit IssuedARCHLINK DESIGN CORP07/10/2025
1 project · most recent 04/17/2026
Sprinkler System
FiledStatusContractorScope
04/17/2026Permit IssuedAMERICAN STANDARD PLUMBINSprinkler System
1 project · most recent 04/17/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/17/2026Permit IssuedLG ELITE PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 03/02/2026
General Wiring
FiledStatusContractorScope
03/02/2026Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
1 project · most recent 04/17/2026
Steel
FiledStatusContractorScope
04/17/2026Permit IssuedAMERICAN STANDARD PLUMBINSteel
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/13/2026Sprinkler SystemsVladimir Kaushanskyspecial
03/13/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
02/06/2026Sprinkler SystemsVladimir Kaushanskyspecial
02/06/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
02/03/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
10/15/2025Post-installed AnchorsANTHONY UGBEBORspecial
10/15/2025Structural Stability – Alterations of existing buildingsANTHONY UGBEBORspecial
10/15/2025Structural Steel - High Strength BoltingANTHONY UGBEBORspecial
10/15/2025Structural Steel - DetailsANTHONY UGBEBORspecial
10/15/2025FinalANTHONY UGBEBORprogress
10/06/2025Structural Steel - High Strength BoltingANTHONY UGBEBORspecial
10/06/2025Post-installed AnchorsANTHONY UGBEBORspecial
10/06/2025FinalANTHONY UGBEBORprogress
10/06/2025Structural Stability – Alterations of existing buildingsANTHONY UGBEBORspecial
10/06/2025Structural Steel - DetailsANTHONY UGBEBORspecial
05/09/2025Structural Stability – Alterations of existing buildings—special
05/09/2025Final—progress
05/09/2025Structural Steel - High Strength Bolting—special
05/09/2025Structural Steel - Details—special
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/17/2026B01179590-S2Request digital key ↗
08/17/2026B01179590-S1Request digital key ↗
08/17/2026B01179590-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B01179590-P6Open ↗
09/02/2026B01179590-P6Open ↗
09/02/2026B01179590-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/17/2026B01179590-S2Open ↗
08/17/2026B01179590-S1Open ↗
08/17/2026B01179590-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B01179590-S2Open ↗
08/22/2026B01179590-P2Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/17/2026B01179590-S2Open ↗
08/17/2026B01179590-S1Open ↗
08/17/2026B01179590-I1Open ↗
Showing 3 of 10 on file for this type
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B01179590-S2Open ↗