Two family converted from one family
570 MONROE STREET
BROOKLYN · BIN 3044865
💬 Discuss this project
1899Year Built
2Stories
B3Building Class
R6BZoning
2,241 sfGross Floor Area
2Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,867 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
Architecture
Floor 217p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
Basement18p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ISAIAH ARCHITECTS311/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R.A.M ELECTRICAL CONTR COElectrical203/22/2026
DFE CONTRACTOR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISAIAH ARCHITECT P.C.7479311/03/2025
Building Lifecycle
All (98)Filed (3)Permit Issued (1)Violation (20)Objection (53)Special Inspection (21)
07/09/2026
Objection raised — Other
06/24/2026
Objection resolved — Addressed
06/01/2026
Special inspection requirement — Maintenance information
06/01/2026
Special inspection requirement — Permanent certificate
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
05/27/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
11/24/2025
Violation issued (HPD, closed)
I
11/07/2025
Objection raised — Fire_Protection
11/07/2025
Objection raised — Plumbing
11/07/2025
Objection raised — Cost
11/07/2025
Objection raised — Fire_Protection
11/03/2025
Filed — Alteration CO
PROPOSE PLUMBING AND SPRINKLER AS PER DRAWINGS FOR PROPOSED CHANGE OF FROM TWO (2) FAMILY TO (3) FAMILY DWELLING
B00984141-S4
05/12/2025
Special inspection requirement — Sprinkler Systems
UDOETTE ISAIAH
03/25/2025
Permit issued — General Construction
B00984141-I1-GC
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
03/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
UDOETTE ISAIAH
03/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
UDOETTE ISAIAH
03/06/2025
Special inspection requirement — Energy Code Compliance Inspections
UDOETTE ISAIAH
03/06/2025
Special inspection requirement — Interior lighting power
UDOETTE ISAIAH
03/06/2025
Special inspection requirement — Lighting controls
UDOETTE ISAIAH
03/06/2025
Special inspection requirement — Lighting in dwelling units
UDOETTE ISAIAH
03/04/2025
Filed — Alteration CO
PROPOSE PLUMBING AND SPRINKLER AS PER DRAWINGS FOR PROPOSED CHANGE OF FROM TWO (2) FAMILY TO (3) FAMILY DWELLING
B00984141-P1
03/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
UDOETTE ISAIAH
03/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
UDOETTE ISAIAH
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
UDOETTE ISAIAH
03/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
UDOETTE ISAIAH
03/03/2025
Special inspection requirement — Lighting controls
03/03/2025
Special inspection requirement — Interior lighting power
03/03/2025
Special inspection requirement — Lighting in dwelling units
02/10/2025
Objection resolved — Addressed
11/15/2024
Objection raised — Other
11/13/2024
Objection resolved — Addressed
11/07/2024
Objection resolved — Addressed
11/07/2024
Objection resolved — Addressed
10/29/2024
Objection resolved — Addressed
10/29/2024
Objection resolved — Addressed
10/29/2024
Objection resolved — Addressed
10/29/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/11/2024
Objection resolved — Addressed
10/11/2024
Objection resolved — Addressed
10/11/2024
Objection resolved — Addressed
07/08/2024
Objection raised — Other
07/08/2024
Objection raised — Fire_Protection
07/08/2024
Objection raised — Other
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDFE CONTRACTOR LLC03/25/2025
1 project · most recent 11/03/2025
FiledStatusContractorScope
11/03/2025——40 heads
1 project · most recent 11/03/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/03/2025——Gas, Water/Sanitary
1 project · most recent 01/21/2025
General Wiring
FiledStatusContractorScope
01/21/2025Permit IssuedR.A.M ELECTRICAL CONTR COGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
06/01/2026Maintenance information—energy_progress
06/01/2026Permanent certificate—energy_progress
06/01/2026HVAC-R and service water piping design and insulation—energy_progress
06/01/2026HVAC-R and service water heating equipment—energy_progress
06/01/2026HVAC-R and service water heating system controls—energy_progress
05/28/2026Energy Code Compliance Inspections—progress
05/12/2025Sprinkler SystemsUDOETTE ISAIAHspecial
03/06/2025Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
03/06/2025Structural Stability – Alterations of existing buildingsUDOETTE ISAIAHspecial
03/06/2025Fire-Resistance Rated ConstructionUDOETTE ISAIAHprogress
03/06/2025Energy Code Compliance InspectionsUDOETTE ISAIAHprogress
03/06/2025Interior lighting powerUDOETTE ISAIAHenergy_progress
03/06/2025Lighting controlsUDOETTE ISAIAHenergy_progress
03/06/2025Lighting in dwelling unitsUDOETTE ISAIAHenergy_progress
03/03/2025Fire-Resistant Penetrations and JointsUDOETTE ISAIAHspecial
03/03/2025Structural Stability – Alterations of existing buildingsUDOETTE ISAIAHspecial
03/03/2025Energy Code Compliance InspectionsUDOETTE ISAIAHprogress
03/03/2025Fire-Resistance Rated ConstructionUDOETTE ISAIAHprogress
03/03/2025Lighting controls—energy_progress
03/03/2025Interior lighting power—energy_progress
03/03/2025Lighting in dwelling units—energy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B00984141-I1Request digital key ↗
08/20/2026B00984141-P1Request digital key ↗
08/20/2026B00984141-S4Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B00984141-I1Open ↗
08/13/2026B00984141-P1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026B00984141-I1Open ↗
08/24/2026B00984141-I1Open ↗
08/24/2026B00984141-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00984141-P1Open ↗
09/01/2026B00984141-P1Open ↗
08/24/2026B00984141-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B00984141-P1Open ↗
08/20/2026B00984141-I1Open ↗
08/20/2026B00984141-S4Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00984141-P1Open ↗
08/13/2026B00984141-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B00984141-I1Open ↗
08/20/2026B00984141-S4Open ↗
08/20/2026B00984141-P1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/20/2026B00984141-I1Open ↗
08/20/2026B00984141-P1Open ↗