← Back
Three families
849 PUTNAM AVENUE
BROOKLYN · BIN 3045286
💬 Discuss this project
1899Year Built
2Stories
C0Building Class
R6BZoning
2,700 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR203/30/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475203/30/2026
Building Lifecycle
All (27)Filed (2)Permit Issued (1)Signed Off (1)Violation (18)Special Inspection (5)
05/05/2026
Violation issued (HPD, closed)
A
04/27/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
B01333087-I1
04/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
04/24/2026
Special inspection requirement — Final
Andres Arias Londono
04/24/2026
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
03/30/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
B01333087-P1
01/14/2026
Permit issued — Solar
B01333087-I1-SL
12/24/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
B01333087-I1
11/20/2025
Violation issued (HPD, closed)
I
06/10/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
04/11/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/24/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
10/31/2019
Violation issued (HPD, closed)
I
10/19/2018
Violation issued (HPD, closed)
I
11/28/2017
Violation issued (HPD, closed)
I
11/14/2016
Violation issued (HPD, closed)
I
10/13/2015
Violation issued (HPD, closed)
I
02/24/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY01/14/2026
2 projects · most recent 03/19/2026
FiledStatusContractorScope
03/19/2026CompleteBERGER QUALITY ELEC'L CON4 meters
12/04/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/24/2026Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
04/24/2026Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
04/24/2026Energy Code Compliance InspectionsAndres Arias Londonoprogress
04/24/2026FinalAndres Arias Londonoprogress
04/24/2026Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026B01333087-I1Request digital key ↗
08/19/2026B01333087-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026B01333087-P1Open ↗
08/13/2026B01333087-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01333087-I1Open ↗
09/01/2026B01333087-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01333087-I1Open ↗
09/01/2026B01333087-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01333087-P1Open ↗
08/13/2026B01333087-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/19/2026B01333087-I1Open ↗