← Back
Over six families without stores
808 PUTNAM AVENUE
BROOKLYN · BIN 3045536
💬 Discuss this project
1910Year Built
4Stories
C1Building Class
R6AZoning
4,736 sfGross Floor Area
8Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 808 PUTNAM LLC · 2,000 sf lot · 2.37 FAR built · Flood zone X
Locations of Work
Architecture
Floor 41p · 1 filing · 20 docs
Floor 3
Floor 2
Floor 1
Cellar2p · 1 filing · 20 docs
1 job · most recent 07/03/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/03/2024Signed-offPARK USA DESIGN & REMODELHeating and Air Conditioning Systems
Heat / Cool
Daikin 2MXS18GVJU 18,000 BTU · Condensing Unit ×16
1 job · most recent 07/03/2024
Storm Water/Sanitary
FiledStatusContractorScope
07/03/2024Signed-offDYNAMIC PLBG & SPRKLR CORStorm, Water/Sanitary
2 jobs · most recent 05/23/2023
General Wiring
FiledStatusContractorScope
05/23/2023CompleteACCURATE ELEC'L CORP.General Wiring
02/27/2023Permit IssuedADD ELECTRICAL CONTRG INC—
Building Lifecycle
All (81)Filed (7)Permit Issued (2)Signed Off (1)Violation (26)Inspection (5)Objection (10)Special Inspection (30)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/03/2024
Filed — Alteration
Proposed interior renovation to an existing four (4) story + cellar residential building. Renovation includes interior partitions, replacement of doors, flooring, bathrooms and kitchens. No change to bulk, use, egress or occupancy with this application
B07997504-P5
05/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2023
Signed off — Alteration
Proposed interior renovation to an existing four (4) story + cellar residential building. Renovation includes interior partitions, replacement of doors, flooring, bathrooms and kitchens. No change to bulk, use, egress or occupancy with this application
B07997504-I1
11/27/2023
Filed — Alteration
Proposed interior renovation to an existing four (4) story + cellar residential building. Renovation includes interior partitions, replacement of doors, flooring, bathrooms and kitchens. No change to bulk, use, egress or occupancy with this application
B07997504-P4
11/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
11/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/22/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
11/22/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
11/22/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
11/22/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
11/22/2023
Special inspection requirement — Final
NAVEEN KUMAR
11/06/2023
Filed — Alteration
Proposed interior renovation to an existing four (4) story + cellar residential building. Renovation includes interior partitions, replacement of doors, flooring, bathrooms and kitchens. No change to bulk, use, egress or occupancy with this application
B07997504-P3
10/30/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
10/30/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
10/30/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
10/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
10/30/2023
Special inspection requirement — Final
NAVEEN KUMAR
10/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/23/2023
Filed — Alteration
Proposed interior renovation to an existing four (4) story + cellar residential building. Renovation includes interior partitions, replacement of doors, flooring, bathrooms and kitchens. No change to bulk, use, egress or occupancy with this application
B07997504-P2
05/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/24/2023
Violation issued (HPD, closed)
A
03/06/2023
Filed — Alteration
Proposed interior renovation to an existing four (4) story + cellar residential building. Renovation includes interior partitions, replacement of doors, flooring, bathrooms and kitchens. No change to bulk, use, egress or occupancy with this application
B07997504-P1
03/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
03/03/2023
Special inspection requirement — Final
NAVEEN KUMAR
03/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/03/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/03/2023
Special inspection requirement — Interior lighting power
Younes Abouyaala
03/03/2023
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
02/28/2023
Violation issued (ECB, closed)
Construction
02/28/2023
Violation issued (ECB, closed)
Construction
02/27/2023
Violation issued (ECB, closed)
Construction
02/08/2023
Permit issued — Plumbing
B07997504-S1-PL
12/06/2022
Permit issued — General Construction
B07997504-I1-GC-CX
11/22/2022
Filed — Alteration
Proposed interior renovation to an existing four (4) story + cellar residential building. Renovation includes interior partitions, replacement of doors, flooring, bathrooms and kitchens. No change to bulk, use, egress or occupancy with this application
B07997504-S1
11/10/2022
Violation issued (HPD, closed)
I
09/19/2022
Objection raised — Other
09/19/2022
Objection resolved — Addressed
09/14/2022
Objection raised — Other
09/14/2022
Objection resolved — Addressed
09/14/2022
Objection raised — Other
09/14/2022
Objection resolved — Addressed
09/14/2022
Objection raised — Other
09/14/2022
Objection resolved — Addressed
Latest 60 of 81 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
808 PUTNAM LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/31/2022$1.9M—— → —$412/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT707/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK USA DESIGN & REMODELGeneral Contractor303/21/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519707/03/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS02/08/2023
DOB NOWGeneral ConstructionSigned-offPARK USA DESIGN & REMODEL12/06/2022
BISFBISSUEDWEATHER FUEL OIL INC02/01/1993
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
07/09/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/09/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/30/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/30/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
11/22/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
11/22/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
11/22/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/22/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
11/22/2023Interior lighting powerYounes Abouyaalaenergy_progress
11/22/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
11/22/2023Mechanical SystemsYounes Abouyaalaspecial
11/22/2023FinalNAVEEN KUMARprogress
10/30/2023Mechanical SystemsYounes Abouyaalaspecial
10/30/2023Lighting in dwelling unitsYounes Abouyaalaenergy_progress
10/30/2023Interior lighting powerYounes Abouyaalaenergy_progress
10/30/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
10/30/2023FinalNAVEEN KUMARprogress
10/30/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/30/2023Structural Stability – Alterations of existing buildings—special
10/30/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/22/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/22/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
04/03/2023Structural Stability – Alterations of existing buildings—special
03/03/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
03/03/2023FinalNAVEEN KUMARprogress
Latest 25 of 30.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026B07997504-P1Request digital key ↗
08/27/2026B07997504-P5Request digital key ↗
08/27/2026B07997504-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026B07997504-P3Open ↗
09/02/2026B07997504-P3Open ↗
09/02/2026B07997504-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B07997504-P5Open ↗
08/27/2026B07997504-P4Open ↗
08/27/2026B07997504-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B07997504-P3Open ↗
09/01/2026B07997504-P1Open ↗
08/24/2026B07997504-P5Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B07997504-P5Open ↗
08/27/2026B07997504-P4Open ↗
08/27/2026B07997504-P3Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B07997504-I1Open ↗
▸Other Documents7
▸DOB NOWDHCR Document7
08/13/2026B07997504-I1Open ↗
08/13/2026B07997504-P1Open ↗
08/13/2026B07997504-P4Open ↗
Showing 3 of 7 on file for this type