← Back
Three families
475 HALSEY STREET
BROOKLYN · BIN 3046104
💬 Discuss this project
1885Year Built
3Stories
C0Building Class
R6BZoning
3,262 sfGross Floor Area
3Units
Rent Stabilized28 Open Violations ▸
Three families · Owner of record: RED STONE HOMES LLC · 1,700 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Floor 310p · 2 filings · 20 docs
Floor 212p · 3 filings · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar16p · 3 filings · 20 docs
Basement10p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITY LINE PROPERTIES1107/08/2026
RED STONE HOMES LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/17/2025$2.7M—RED STONE HOMES LLC → Private party$835/sf building
11/16/2023$900K—— → —$276/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PRIME ZONE BUILDING CONSULTING601/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TURN KEY NYC LLCGeneral Contractor407/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8065101/07/2025
M. INT'L ENGINEERING PLLC3129101/07/2025
NKM ENGINEERING PLLC6244206/24/2024
PRIME ZONE BUILDING CONSU9474105/15/2024
Building Lifecycle
All (125)Filed (6)Permit Issued (4)Signed Off (3)Violation (60)Inspection (10)Objection (12)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
07/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/09/2025
Violation issued (HPD, open)
A
06/06/2025
Signed off — Alteration
INTERIOR RENOVATION IN EXISTING 3-STORY 3-FAMILY RESIDENTIAL BUILDING WITH CELLAR. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION
B01031491-I1
05/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/20/2025
Signed off — Alteration
PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT EXISTING FOUR (4) STORY BUILDING WITH CELLAR & BASEMENT IN CONJUNCTION WITH ALT 1 JOB # B01031491-I1
B01070508-I1
03/17/2025
Violation issued (HPD, open)
A
03/17/2025
Violation issued (HPD, open)
A
03/17/2025
Violation issued (HPD, open)
B
03/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/10/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/05/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/20/2025
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB# B01046806-I1
B01084208-I1
01/28/2025
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Lighting in dwelling units
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Maintenance information
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Fenestration air leakage
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Air barrier - visual inspection
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Metering
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Lighting controls
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Fenestration areas
CHI WAI CHUNG
01/28/2025
Special inspection requirement — Insulation placement and R values
CHI WAI CHUNG
01/20/2025
Objection resolved — Addressed
01/20/2025
Objection resolved — Addressed
01/20/2025
Special inspection requirement — Insulation placement and R values
01/17/2025
Objection raised — Zoning
01/17/2025
Objection raised — Zoning
01/07/2025
Filed — Alteration CO
CONVERT EXISTING 3-STORY RESIDENTIALBUILDING WITH BASEMENT AND CELLAR FROM 3 DWELLING UNITS TO 2 DWELLING UNITS. REMOVE ILLEGAL EXTENSION AT REAR. INTERIOR RENOVATION. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B01046806-P1
01/06/2025
Special inspection requirement — Fenestration air leakage
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Metering
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Lighting in dwelling units
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Air barrier - visual inspection
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Maintenance information
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Lighting controls
CHI WAI CHUNG
01/06/2025
Special inspection requirement — Fenestration areas
CHI WAI CHUNG
12/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2024
Violation issued (HPD, closed)
I
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
JICHEN SUN
09/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
JICHEN SUN
09/12/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-1 JOB# B01046806-I1
B01084208-P1
09/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC08/07/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC08/07/2024
DOB NOWGeneral ConstructionPermit IssuedTURN KEY NYC LLC07/30/2024
DOB NOWGeneral ConstructionSigned-offTURN KEY NYC LLC04/17/2024
1 project · most recent 04/14/2025
General Wiring
FiledStatusContractorScope
04/14/2025CompleteK.A.B. ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/05/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
01/28/2025Interior lighting powerCHI WAI CHUNGenergy_progress
01/28/2025Lighting in dwelling unitsCHI WAI CHUNGenergy_progress
01/28/2025Maintenance informationCHI WAI CHUNGenergy_progress
01/28/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
01/28/2025Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
01/28/2025Energy Code Compliance InspectionsCHI WAI CHUNGprogress
01/28/2025Fire-Resistance Rated ConstructionCHI WAI CHUNGprogress
01/28/2025Fenestration air leakageCHI WAI CHUNGenergy_progress
01/28/2025Air barrier - visual inspectionCHI WAI CHUNGenergy_progress
01/28/2025Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
01/28/2025MeteringCHI WAI CHUNGenergy_progress
01/28/2025Lighting controlsCHI WAI CHUNGenergy_progress
01/28/2025Fenestration areasCHI WAI CHUNGenergy_progress
01/28/2025Insulation placement and R valuesCHI WAI CHUNGenergy_progress
01/20/2025Insulation placement and R values—energy_progress
01/06/2025Fenestration air leakageCHI WAI CHUNGenergy_progress
01/06/2025Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
01/06/2025Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
01/06/2025Energy Code Compliance InspectionsCHI WAI CHUNGprogress
01/06/2025Fire-Resistance Rated ConstructionCHI WAI CHUNGprogress
01/06/2025MeteringCHI WAI CHUNGenergy_progress
01/06/2025Lighting in dwelling unitsCHI WAI CHUNGenergy_progress
01/06/2025Interior lighting powerCHI WAI CHUNGenergy_progress
01/06/2025Air barrier - visual inspectionCHI WAI CHUNGenergy_progress
01/06/2025Fenestration and door U-factor and product ratingsCHI WAI CHUNGenergy_progress
Latest 25 of 32.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01031491-I1Request digital key ↗
08/24/2026B01070508-I1Request digital key ↗
08/24/2026B01084208-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit5
08/13/2026B01084208-I1Open ↗
08/13/2026B01046806-I1Open ↗
08/13/2026B01046806-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
01/25/2010320122997Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01046806-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature7
08/25/2026B01084208-I1Open ↗
08/25/2026B01084208-I1Open ↗
08/24/2026B01046806-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B01084208-P1Open ↗
08/24/2026B01084208-I1Open ↗
08/13/2026B01046806-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026B01046806-P1Open ↗
08/24/2026B01046806-P1Open ↗
08/23/2026B01046806-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/25/2010320122997Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/25/2010320122997Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B01046806-I1Open ↗
08/13/2026B01046806-P1Open ↗
▸BISSTREET TREE CHECKLIST1
01/25/2010320122997Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026B01084208-I1Open ↗
08/24/2026B01084208-P1Open ↗
08/13/2026B01031491-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/25/2010320122997Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/25/2010320122997Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/25/2010320122997Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/13/2026B01046806-I1Open ↗
08/13/2026B01046806-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01046806-I1Open ↗