← Back
Three families
297 STUYVESANT AVENUE
BROOKLYN · BIN 3046132
💬 Discuss this project
1888Year Built
3Stories
C0Building Class
R6BZoning
2,280 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations ▸FDNY Report ↗
Three families · Owner of record: MOUNT PISGAH BAPTIST CHURCH · 1,900 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction1p · 2 filings · 20 docs
Floor 2Under Construction2 filings · 20 docs
Floor 1Under Construction2 filings · 20 docs
CellarUnder Construction3p · 2 filings · 20 docs
BasementUnder Construction1 filing · 19 docs
Sub-BasementUnder Construction1 filing · 5 docs
1 job · most recent 06/25/2026
Sprinkler System
FiledStatusContractorScope
06/25/2026Permit IssuedVIP FIRE SPRINKLER INCSprinkler System
1 job · most recent 06/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/25/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
1 job · most recent 05/25/2026
General Wiring
FiledStatusContractorScope
05/25/2026Permit IssuedSolar Pro Electric Inc.General Wiring
1 job · most recent 06/25/2026
Wood
FiledStatusContractorScope
06/25/2026Permit IssuedPLBG P & H INCWood
1 job · most recent 07/23/2026
Scaffold
FiledStatusContractorScope
07/23/2026Permit IssuedEMPIRE CITY CONSTRUCTIONScaffold
Building Lifecycle
All (86)Filed (5)Permit Issued (5)Violation (18)Inspection (2)Objection (33)Special Inspection (23)
09/11/2026
Permit issued — Supported Scaffold
B01435541-I1-SF
07/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2026
Permit issued — Plumbing
B01247788-S2-PL
07/27/2026
Special inspection requirement — Exterior lighting power
07/27/2026
Special inspection requirement — Maintenance information
07/27/2026
Special inspection requirement — Insulation placement and R values
07/27/2026
Special inspection requirement — Fenestration air leakage
07/27/2026
Special inspection requirement — Fenestration areas
07/27/2026
Special inspection requirement — Lighting in dwelling units
07/27/2026
Special inspection requirement — Interior lighting power
07/27/2026
Special inspection requirement — Metering
07/27/2026
Special inspection requirement — Air barrier - visual inspection
07/27/2026
Special inspection requirement — Lighting controls
07/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/27/2026
Special inspection requirement — Permanent certificate
07/23/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01435541-I1
07/23/2026
Permit issued — Supported Scaffold
B01435541-I1-SF
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Resolved
07/23/2026
Objection resolved — Addressed
07/23/2026
Objection resolved — Addressed
07/13/2026
Permit issued — Sprinklers
B01247788-S1-EW-SP
06/25/2026
Filed — Alteration CO
CONVERTING EXISTING 4 STORY, 3 FAMILY DWELLING UNIT TO 2FAMILY DWELLING UNIT WITH NEW LAYOUT AS PER PLAN.PROPOSED ONE D.U. ON BASEMENT AND TRIPLEX FOR ONE D.U.ON 1ST TO 3RD FLOOR.
B01247788-S2
06/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
06/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
06/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
06/17/2026
Filed — Alteration CO
CONVERTING EXISTING 4 STORY, 3 FAMILY DWELLING UNIT TO 2FAMILY DWELLING UNIT WITH NEW LAYOUT AS PER PLAN.PROPOSED ONE D.U. ON BASEMENT AND TRIPLEX FOR ONE D.U.ON 1ST TO 3RD FLOOR.
B01247788-S1
06/17/2026
Special inspection requirement — Sprinkler Systems
SIMON JIANG
05/07/2026
Permit issued — General Construction
B01392433-I1-GC
05/07/2026
Objection resolved — Addressed
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/06/2026
Violation issued (HPD, open)
A
05/04/2026
Filed — Alteration
INTERIOR DEMOLITION ON EXISTING TWO (2)-FAMILY, THREE (3) STORY BRICK RESIDENTIAL BUILDING WITH BASEMENTAND CELLAR.NO CHANGE OF BUILDING BULK, OCCUPANCY OR EGRESS
B01392433-I1
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
01/05/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
11/20/2025
Violation issued (HPD, open)
I
11/11/2025
Objection resolved — Addressed
11/11/2025
Objection resolved — Addressed
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Admin
10/22/2025
Objection raised — Cost
10/22/2025
Objection raised — Admin
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Zoning
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Energy
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Structural
10/22/2025
Objection raised — Zoning
Latest 60 of 86 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRICKSTONE GROUP508/29/2026
MOUNT PISGAH BAPTIST CHURCH103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB107/23/2026
CQ&J CORPORATION306/25/2026
THOMAS C. TUNG, P.E.106/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE CITY CONSTRUCTIONGeneral Contractor209/13/2026
VIP FIRE SPRINKLER INCFire Protection107/14/2026
MORELL BUILDERS INCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON7555106/17/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedEMPIRE CITY CONSTRUCTION09/11/2026
DOB NOWPlumbingPermit IssuedPLBG P & H INC07/27/2026
DOB NOWSupported ScaffoldPermit IssuedEMPIRE CITY CONSTRUCTION07/23/2026
DOB NOWSprinklersPermit IssuedVIP FIRE SPRINKLER INC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC05/07/2026
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/27/2026Exterior lighting power—energy_progress
07/27/2026Maintenance information—energy_progress
07/27/2026Insulation placement and R values—energy_progress
07/27/2026Fenestration air leakage—energy_progress
07/27/2026Fenestration areas—energy_progress
07/27/2026Lighting in dwelling units—energy_progress
07/27/2026Interior lighting power—energy_progress
07/27/2026Metering—energy_progress
07/27/2026Air barrier - visual inspection—energy_progress
07/27/2026Lighting controls—energy_progress
07/27/2026Fenestration and door U-factor and product ratings—energy_progress
07/27/2026Permanent certificate—energy_progress
06/24/2026HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
06/24/2026Energy Code Compliance InspectionsCALVIN TRANprogress
06/24/2026HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
06/24/2026HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
06/17/2026Sprinkler SystemsSIMON JIANGspecial
05/07/2026Structural Stability – Alterations of existing buildings—special
04/24/2026Energy Code Compliance InspectionsCALVIN TRANprogress
06/27/2025Fire-Resistant Penetrations and Joints—special
06/27/2025Fire-Resistance Rated Construction—progress
06/27/2025Energy Code Compliance Inspections—progress
06/26/2025Final—progress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01247788-S1Request digital key ↗
08/21/2026B01247788-S2Request digital key ↗
08/17/2026B01392433-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/21/2026B01247788-S2Open ↗
08/17/2026B01392433-I1Open ↗
08/13/2026B01247788-I1Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01247788-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01247788-S2Open ↗
08/21/2026B01247788-I1Open ↗
08/21/2026B01247788-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B01247788-S2Open ↗
08/29/2026B01247788-S2Open ↗
08/29/2026B01247788-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01247788-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01247788-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01247788-S1Open ↗
08/21/2026B01247788-S2Open ↗
08/17/2026B01392433-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026B01247788-I1Open ↗