← Back
Two family converted from one family
319 STUYVESANT AVENUE
BROOKLYN · BIN 3046477
💬 Discuss this project
1888Year Built
2Stories
B3Building Class
R6BZoning
2,408 sfGross Floor Area
2Units
Two family converted from one family · 1,599 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Cellar3p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KCE CONSULTING ENGINEERING PLLC508/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KP CONSULTING ENGINEER603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION BY REGALIS IGeneral Contractor304/09/2026
FRANCISCO SOSA, INCGeneral Contractor104/09/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KCE CONSULTING ENGINEERIN3712508/06/2025
Building Lifecycle
All (62)Filed (5)Permit Issued (5)Signed Off (3)Inspection (3)Objection (20)Special Inspection (26)
10/28/2025
Signed off — Alteration
Filing support of excavation work in conjunction with GC job # B00754799-I1. Sloped excavation at exposures 1, 2, 3 and 4.
B00754799-S2
10/28/2025
Signed off — Alteration
Filing support of excavation work in conjunction with GC job # B00754799-I1. Sloped excavation at exposures 1, 2, 3 and 4.
B00754799-I1
10/24/2025
Permit issued — Support of Excavation
B00754799-S2-SE
08/08/2025
Special inspection requirement — Subgrade Inspections
Kemba Walcott
08/08/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Kemba Walcott
08/06/2025
Filed — Alteration
Filing support of excavation work in conjunction with GC job # B00754799-I1. Sloped excavation at exposures 1, 2, 3 and 4.
B00754799-P2
07/05/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Kemba Walcott
07/05/2025
Special inspection requirement — Subgrade Inspections
Kemba Walcott
04/11/2025
Signed off — Alteration
Filing support of excavation work in conjunction with GC job # B00754799-I1. Sloped excavation at exposures 1, 2, 3 and 4.
B00754799-S1
04/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/03/2025
Permit issued — Foundation
B00754799-I1-GC-CX
08/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/13/2024
Permit issued — Plumbing
B00754799-S1-PL
06/11/2024
Objection resolved — Addressed
05/29/2024
Objection resolved — Addressed
05/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
05/28/2024
Special inspection requirement — Masonry
Kemba Walcott
05/28/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Kemba Walcott
05/28/2024
Special inspection requirement — Concrete - Cast-In-Place
Kemba Walcott
05/28/2024
Special inspection requirement — Final
Kemba Walcott
05/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kemba Walcott
05/28/2024
Special inspection requirement — Footing and Foundation
Kemba Walcott
05/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
05/22/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Other
05/16/2024
Filed — Alteration
Filing support of excavation work in conjunction with GC job # B00754799-I1. Sloped excavation at exposures 1, 2, 3 and 4.
B00754799-S2
05/16/2024
Objection resolved — Addressed
05/16/2024
Objection resolved — Addressed
04/24/2024
Objection resolved — Addressed
04/24/2024
Objection resolved — Addressed
04/23/2024
Objection resolved — Addressed
04/23/2024
Objection resolved — Addressed
03/25/2024
Objection resolved — Addressed
02/22/2024
Objection raised — Fire_Protection
02/22/2024
Objection raised — Admin
02/22/2024
Objection raised — Structural
02/22/2024
Objection raised — Structural
02/22/2024
Objection raised — Inspections
02/22/2024
Objection raised — Scope
02/22/2024
Objection raised — Zoning
02/22/2024
Objection raised — Energy
02/22/2024
Objection raised — Structural
02/16/2024
Filed — Alteration
Filing support of excavation work in conjunction with GC job # B00754799-I1. Sloped excavation at exposures 1, 2, 3 and 4.
B00754799-S1
02/16/2024
Filed — Alteration
Filing support of excavation work in conjunction with GC job # B00754799-I1. Sloped excavation at exposures 1, 2, 3 and 4.
B00754799-P1
02/12/2024
Special inspection requirement — Fenestration air leakage
Kemba Walcott
02/12/2024
Special inspection requirement — Fenestration areas
Kemba Walcott
02/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
02/12/2024
Special inspection requirement — Concrete - Cast-In-Place
Kemba Walcott
02/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Kemba Walcott
02/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kemba Walcott
02/12/2024
Special inspection requirement — Masonry
Kemba Walcott
02/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kemba Walcott
02/12/2024
Special inspection requirement — Final
Kemba Walcott
02/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kemba Walcott
02/12/2024
Special inspection requirement — Footing and Foundation
Kemba Walcott
02/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Kemba Walcott
02/12/2024
Special inspection requirement — Lighting in dwelling units
Kemba Walcott
02/12/2024
Special inspection requirement — Insulation placement and R values
Kemba Walcott
11/08/2023
Permit issued — General Construction
B00754799-I1-GC-CX
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offCONSTRUCTION BY REGALIS I10/24/2025
DOB NOWFoundationSigned-offCONSTRUCTION BY REGALIS I04/03/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/13/2024
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION BY REGALIS I11/08/2023
DOB NOWFoundationSigned-offFRANCISCO SOSA, INC02/27/2023
1 project · most recent 04/10/2024
FiledStatusContractorScope
04/10/2024CompleteABM ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/08/2025Subgrade InspectionsKemba Walcottspecial
08/08/2025Excavations - Sheeting, Shoring, and BracingKemba Walcottspecial
07/05/2025Excavations - Sheeting, Shoring, and BracingKemba Walcottspecial
07/05/2025Subgrade InspectionsKemba Walcottspecial
05/28/2024Structural Stability – Alterations of existing buildingsKemba Walcottspecial
05/28/2024MasonryKemba Walcottspecial
05/28/2024Excavations - Sheeting, Shoring, and BracingKemba Walcottspecial
05/28/2024Concrete - Cast-In-PlaceKemba Walcottspecial
05/28/2024FinalKemba Walcottprogress
05/28/2024Fire-Resistance Rated ConstructionKemba Walcottprogress
05/28/2024Footing and FoundationKemba Walcottprogress
05/28/2024Fire-Resistant Penetrations and JointsKemba Walcottspecial
02/12/2024Fenestration air leakageKemba Walcottenergy_progress
02/12/2024Fenestration areasKemba Walcottenergy_progress
02/12/2024Fire-Resistant Penetrations and JointsKemba Walcottspecial
02/12/2024Concrete - Cast-In-PlaceKemba Walcottspecial
02/12/2024Excavations - Sheeting, Shoring, and BracingKemba Walcottspecial
02/12/2024Fire-Resistant Penetrations and JointsKemba Walcottspecial
02/12/2024MasonryKemba Walcottspecial
02/12/2024Structural Stability – Alterations of existing buildingsKemba Walcottspecial
02/12/2024FinalKemba Walcottprogress
02/12/2024Fire-Resistance Rated ConstructionKemba Walcottprogress
02/12/2024Footing and FoundationKemba Walcottprogress
02/12/2024Fenestration and door U-factor and product ratingsKemba Walcottenergy_progress
02/12/2024Lighting in dwelling unitsKemba Walcottenergy_progress
Latest 25 of 26.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B00754799-S1Request digital key ↗
08/28/2026B00754799-S2Request digital key ↗
08/28/2026B00754799-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/28/2026B00754799-I1Open ↗
08/28/2026B00754799-S2Open ↗
08/13/2026B00754799-S1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWSpecial Inspector Seal & Signature15
09/14/2026B00754799-S2Open ↗
09/14/2026B00754799-S2Open ↗
08/28/2026B00754799-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/25/2026B00754799-I1Open ↗
08/25/2026B00754799-I1Open ↗
08/25/2026B00754799-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B00754799-I1Open ↗
08/28/2026B00754799-S2Open ↗
08/13/2026B00754799-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B00754799-I1Open ↗
08/28/2026B00754799-S2Open ↗
08/13/2026B00754799-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00754799-S2Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00754799-S2Open ↗