← Back
Two family frame
345 DECATUR STREET
BROOKLYN · BIN 3047176
💬 Discuss this project
1878Year Built
2Stories
B2Building Class
R6BZoning
2,401 sfGross Floor Area
2Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Two family frame · Owner of record: CHUCUITO LLC, A NEW YORK LIMITED LIABILI TY COMPANY · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 3 filings · 20 docs
Floor 3Under Construction36p · 5 filings · 20 docs
Floor 2Under Construction33p · 4 filings · 20 docs
Floor 1Under Construction34p · 4 filings · 20 docs
CellarUnder Construction39p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHUCUITO3107/08/2026
DECATUR DEVELOPMENT HOLDINGS LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2019$935K—— → —$389/sf building
02/11/2016$525K—Private party → DECATUR DEVELOPMENT HOLDINGS LLC$219/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GARRISON ARCHITECTS305/22/2026
NY BUILDING ASSOCIATES INC112/08/2025
MURRAY ENGINEERING PC206/10/2025
DAGHER ENGINEERING PLLC311/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1403/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LMD PARTNERS INCGeneral Contractor904/09/2026
ATELIER OF FORM AND FUNCTGeneral Contractor207/08/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
PRIME PIPING & HEATING INPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S.T. ARCHITECTURE7538605/22/2026
NKM ENGINEERING PLLC6244112/08/2025
CARLIN-SIMPSON & ASSOCIAT4618106/10/2025
MURRAY ENGINEERING PC1434106/10/2025
DAGHER ENGINEERING2441211/01/2022
Building Lifecycle
All (66)Filed (9)Permit Issued (10)Violation (8)Inspection (3)Objection (6)Special Inspection (30)
08/25/2026
Special inspection requirement — Fenestration air leakage
James Garrison
08/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
James Garrison
08/25/2026
Special inspection requirement — Interior lighting power
James Garrison
08/25/2026
Special inspection requirement — Air barrier - visual inspection
James Garrison
08/25/2026
Special inspection requirement — Insulation placement and R values
James Garrison
08/25/2026
Special inspection requirement — Fenestration areas
James Garrison
08/25/2026
Special inspection requirement — Lighting in dwelling units
James Garrison
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SALVATORE TRANCHINA
08/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SALVATORE TRANCHINA
08/25/2026
Special inspection requirement — Lighting controls
James Garrison
08/21/2026
Violation issued (ECB, open)
Construction
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
07/09/2026
Objection resolved — Addressed
06/26/2026
Objection raised — Scope
06/22/2026
Objection raised — Other
06/22/2026
Objection raised — Other
05/22/2026
Filed — Alteration CO
B00690699-P1
05/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
James Garrison
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SALVATORE TRANCHINA
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SALVATORE TRANCHINA
05/22/2026
Special inspection requirement — Air barrier - visual inspection
James Garrison
05/22/2026
Special inspection requirement — Lighting controls
James Garrison
05/22/2026
Special inspection requirement — Fenestration air leakage
James Garrison
05/22/2026
Special inspection requirement — Fenestration areas
James Garrison
05/22/2026
Special inspection requirement — Lighting in dwelling units
James Garrison
05/22/2026
Special inspection requirement — Interior lighting power
James Garrison
05/22/2026
Special inspection requirement — Insulation placement and R values
James Garrison
01/29/2026
Permit issued — Construction Fence
B01238924-I1-FN
01/29/2026
Permit issued — Mechanical Systems
B00279293-I1-MS
01/29/2026
Permit issued — Structural
B00279288-I1-ST
12/15/2025
Permit issued — Mechanical Systems
B00279293-I1-MS
12/10/2025
Permit issued — General Construction
B00690699-I1-GC
12/09/2025
Permit issued — Solar
B01301316-I1-SL
12/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/08/2025
Filed — Alteration
INSTALL SOLAR PV ON EXISTING ROOFTOP. NO CHANGES IN USE, OCCUPANCY, OR EGRESS.
B01301316-I1
12/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
11/24/2025
Violation issued (HPD, open)
I
11/13/2025
Permit issued — Plumbing
B00279290-I1-PL
10/10/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
10/10/2025
Special inspection requirement — Final
NARESH MAHANGU
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/10/2025
Permit issued — Structural
B00279288-I1-ST
06/13/2025
Permit issued — Construction Fence
B01238924-I1-FN
06/10/2025
Filed — Alteration
B00279288-S1
06/10/2025
Filed — Alteration
Herewith filing a temporary construction fence at the front and rear of the property, as per plans submitted. Fence is being filed in conjunction with ALT-CO# B00690699. There is no change to use, egress or occupancy
B01238924-I1
05/27/2025
Permit issued — General Construction
B00690699-I1-GC
05/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ROBERT SIMPSON
12/04/2024
Violation issued (HPD, open)
I
05/17/2024
Special inspection requirement — Subgrade Inspections
ROBERT SIMPSON
05/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Murray
05/17/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBERT SIMPSON
05/17/2024
Special inspection requirement — Concrete - Cast-In-Place
Robert Murray
12/22/2023
Filed — Alteration
B00279288-I1
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
11/01/2022
Filed — Alteration
B00279222-I1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedLMD PARTNERS INC01/29/2026
DOB NOWMechanical SystemsPermit IssuedLMD PARTNERS INC01/29/2026
DOB NOWStructuralPermit IssuedLMD PARTNERS INC01/29/2026
DOB NOWMechanical SystemsPermit IssuedLMD PARTNERS INC12/15/2025
DOB NOWGeneral ConstructionPermit IssuedATELIER OF FORM FUNCT12/10/2025
DOB NOWSolarPermit IssuedBROOKLYN SOLARWORKS LLC12/09/2025
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN11/13/2025
DOB NOWStructuralPermit IssuedLMD PARTNERS INC07/10/2025
DOB NOWConstruction FencePermit IssuedLMD PARTNERS INC06/13/2025
DOB NOWGeneral ConstructionPermit IssuedATELIER OF FORM FUNCT05/27/2025
2 projects · most recent 10/10/2025
General Wiring
FiledStatusContractorScope
10/10/2025CompleteBROOKYLN SOLARWORKS, LLC—
06/07/2025Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 12/08/2025
FiledStatusContractorScope
12/08/2025Permit IssuedBROOKLYN SOLARWORKS LLC8 panels, 3.52 kw, 1,050 roof_area_sqft
1 project · most recent 06/10/2025
Fence
FiledStatusContractorScope
06/10/2025Permit IssuedLMD PARTNERS INCFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/25/2026Fenestration air leakageJames Garrisonenergy_progress
08/25/2026Fenestration and door U-factor and product ratingsJames Garrisonenergy_progress
08/25/2026Interior lighting powerJames Garrisonenergy_progress
08/25/2026Air barrier - visual inspectionJames Garrisonenergy_progress
08/25/2026Insulation placement and R valuesJames Garrisonenergy_progress
08/25/2026Fenestration areasJames Garrisonenergy_progress
08/25/2026Lighting in dwelling unitsJames Garrisonenergy_progress
08/25/2026Fire-Resistant Penetrations and JointsSALVATORE TRANCHINAspecial
08/25/2026Structural Stability – Alterations of existing buildingsSALVATORE TRANCHINAspecial
08/25/2026Lighting controlsJames Garrisonenergy_progress
05/22/2026Fenestration and door U-factor and product ratingsJames Garrisonenergy_progress
05/22/2026Fire-Resistant Penetrations and JointsSALVATORE TRANCHINAspecial
05/22/2026Structural Stability – Alterations of existing buildingsSALVATORE TRANCHINAspecial
05/22/2026Air barrier - visual inspectionJames Garrisonenergy_progress
05/22/2026Lighting controlsJames Garrisonenergy_progress
05/22/2026Fenestration air leakageJames Garrisonenergy_progress
05/22/2026Fenestration areasJames Garrisonenergy_progress
05/22/2026Lighting in dwelling unitsJames Garrisonenergy_progress
05/22/2026Interior lighting powerJames Garrisonenergy_progress
05/22/2026Insulation placement and R valuesJames Garrisonenergy_progress
12/05/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
10/10/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/10/2025FinalNARESH MAHANGUprogress
10/10/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/10/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
Latest 25 of 32.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch5
08/28/2026B00690699-I1Request digital key ↗
08/28/2026B00690699-P1Request digital key ↗
08/21/2026B00279288-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/28/2026B00279222-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026B00279293-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/21/2026B00279288-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026B00279290-I1Request digital key ↗
▸Applications & Permits7
▸DOB NOWLPC Approval/Permit7
08/14/2026B00690699-P1Open ↗
08/13/2026B00279293-I1Open ↗
08/13/2026B00690699-I1Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026B00690699-P1Open ↗
08/13/2026B00690699-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026B00690699-P1Open ↗
08/13/2026B00690699-I1Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature22
08/31/2026B00690699-I1Open ↗
08/31/2026B00690699-I1Open ↗
08/31/2026B00690699-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/31/2026B00690699-I1Open ↗
08/31/2026B00690699-I1Open ↗
08/29/2026B01301316-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/28/2026B00690699-P1Open ↗
08/21/2026B01238924-I1Open ↗
08/13/2026B00279293-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/14/2026B00690699-P1Open ↗
08/13/2026B00690699-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/14/2026B00690699-P1Open ↗
08/13/2026B00279222-I1Open ↗
08/13/2026B01301316-I1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00279288-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00279288-S1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram3
08/14/2026B00690699-P1Open ↗
08/13/2026B00279288-S1Open ↗
08/13/2026B00690699-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/28/2026B00690699-I1Open ↗
08/14/2026B00690699-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026B00690699-P1Open ↗
08/13/2026B00690699-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/14/2026B00690699-P1Open ↗
08/13/2026B00690699-I1Open ↗