← Back
Three families
120A BAINBRIDGE STREET
BROOKLYN · BIN 3047734
💬 Discuss this project
1899Year Built
4Stories
C0Building Class
R6BZoning
5,716 sfGross Floor Area
3Units
Rent Stabilized47 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 2.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
Floor 4Under Construction12p · 2 filings · 20 docs
Floor 3Under Construction12p · 2 filings · 20 docs
Floor 2Under Construction12p · 2 filings · 20 docs
Floor 1Under Construction12p · 3 filings · 20 docs
CellarUnder Construction13p · 3 filings · 20 docs
1 job · most recent 02/25/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/25/2026Permit IssuedMR. AIR NYC CORPAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-3C30NA3-U1 28,000 BTU · Heat Pump Outdoor ×1
MXZ-3C30NAHZ4-U1 28,000 BTU · Heat Pump Outdoor ×1
MXZ-SM60NL 60,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 08/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/14/2025Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
2 jobs · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026CompleteKJK ELECTRIC INC4 meters
08/11/2026CompleteKJK ELECTRIC INCGeneral Wiring
2 jobs · most recent 04/11/2026
Steel Concrete Wood
FiledStatusContractorScope
04/11/2026Permit IssuedXUXU CONSTRUCTION INCSteel, Concrete, Wood
03/24/2026——Steel, Concrete, Wood
Building Lifecycle
All (106)Filed (7)Permit Issued (5)Violation (60)Inspection (4)Special Inspection (30)
05/01/2026
Violation issued (HPD, open)
A
04/22/2026
Permit issued — Structural
B01384789-I1-GC-CX
04/11/2026
Filed — Alteration
NO WORK ON THE FRONT FACADE. REPLACE WINDOWS WITH DOORS ON THE REAR FACADE AND REPLACE ONE DOOR ON THE REAR SIDE FACADE. CONSTRUCT A LIGHT WELL AND A DECK IN THE REAR YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01384789-I1
03/24/2026
Filed — Alteration
NO WORK ON THE FRONT FACADE. REPLACE WINDOWS WITH DOORS ON THE REAR FACADE AND REPLACE ONE DOOR ON THE REAR SIDE FACADE. CONSTRUCT A LIGHT WELL AND A DECK IN THE REAR YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01310103-I1
03/06/2026
Permit issued — Mechanical Systems
B01363986-I1-MS
02/25/2026
Filed — Alteration
INSTALL THREE SPLIT UNITS HVAC SYSTEM FOR EXISTING THREE FAMILY HOUSE, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01363986-I1
02/24/2026
Special inspection requirement — Final
Kaijin Liang
02/24/2026
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
02/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
11/28/2025
Special inspection requirement — Wood – Seismic Resistance
11/28/2025
Special inspection requirement — Structural Steel - Details
Kaijin Liang
11/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
11/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kaijin Liang
11/20/2025
Violation issued (HPD, open)
I
10/28/2025
Special inspection requirement — Final
10/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/11/2025
Permit issued — General Construction
B01204415-I1-GC
09/10/2025
Permit issued — Plumbing
B01204415-S1-PL
08/15/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/15/2025
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
08/15/2025
Special inspection requirement — Lighting in dwelling units
ZHENHUAN XU
08/15/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
08/15/2025
Special inspection requirement — Final
ZHENHUAN XU
08/15/2025
Special inspection requirement — Preliminary
ZHENHUAN XU
08/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
08/15/2025
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
08/15/2025
Special inspection requirement — Lighting controls
ZHENHUAN XU
08/14/2025
Filed — Alteration
Interior renovation of existing 3 family house, no change in egress, use and occupancy.
B01204415-P2
08/14/2025
Filed — Alteration
Interior renovation of existing 3 family house, no change in egress, use and occupancy.
B01204415-P1
08/14/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
08/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
08/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
08/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
08/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
08/09/2025
Special inspection requirement — Maintenance information
ZHENHUAN XU
08/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
06/12/2025
Violation issued (ECB, closed)
Construction
06/12/2025
Violation issued (ECB, closed)
Unknown
06/12/2025
Violation issued (ECB, closed)
Construction
06/12/2025
Violation issued (ECB, closed)
Unknown
06/06/2025
Violation issued (HPD, open)
A
05/12/2025
Filed — Alteration
Interior renovation of existing 3 family house, no change in egress, use and occupancy.
B01204415-S1
05/12/2025
Permit issued — General Construction
B01204415-I1-GC
04/16/2025
Filed — Alteration
Interior renovation of existing 3 family house, no change in egress, use and occupancy.
B01204415-I1
11/29/2024
Violation issued (HPD, closed)
I
08/15/2024
Violation issued (HPD, open)
C
08/15/2024
Violation issued (HPD, open)
A
08/15/2024
Violation issued (HPD, open)
A
08/15/2024
Violation issued (HPD, open)
A
08/15/2024
Violation issued (HPD, open)
A
05/31/2024
Violation issued (HPD, open)
B
Latest 60 of 106 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2025$2.0M—— → —$346/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC404/11/2026
HUAN DESIGN INC.308/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HUAN DESIGN INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XUXU CONSTRUCTION INCGeneral Contractor406/17/2026
NAN TONG JIN YI CONSTRUCTGeneral Contractor303/21/2026
MR. AIR NYC CORPGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HUAN DESIGN INC7669604/11/2026
SQ. ARCH, LLC4802204/11/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedXUXU CONSTRUCTION INC04/22/2026
DOB NOWMechanical SystemsPermit IssuedMR. AIR NYC CORP03/06/2026
DOB NOWGeneral ConstructionPermit IssuedXUXU CONSTRUCTION INC09/11/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.09/10/2025
DOB NOWGeneral ConstructionPermit IssuedNAN TONG JIN YI CONSTRUCT05/12/2025
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
02/24/2026FinalKaijin Liangprogress
02/24/2026Mechanical SystemsZHENHUAN XUspecial
11/28/2025Energy Code Compliance InspectionsKaijin Liangprogress
11/28/2025Wood – Seismic Resistance—special
11/28/2025Structural Steel - DetailsKaijin Liangspecial
11/28/2025Fire-Resistant Penetrations and JointsKaijin Liangspecial
11/28/2025Fire-Resistance Rated ConstructionKaijin Liangprogress
10/28/2025Final—progress
08/15/2025Maintenance informationZHENHUAN XUenergy_progress
08/15/2025Air barrier - visual inspectionZHENHUAN XUenergy_progress
08/15/2025Lighting in dwelling unitsZHENHUAN XUenergy_progress
08/15/2025Interior lighting powerZHENHUAN XUenergy_progress
08/15/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
08/15/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
08/15/2025FinalZHENHUAN XUprogress
08/15/2025PreliminaryZHENHUAN XUprogress
08/15/2025Fire-Resistance Rated ConstructionZHENHUAN XUprogress
08/15/2025Fenestration air leakageZHENHUAN XUenergy_progress
08/15/2025Lighting controlsZHENHUAN XUenergy_progress
08/14/2025Maintenance informationZHENHUAN XUenergy_progress
08/14/2025HVAC-R and service water heating equipmentZHENHUAN XUenergy_progress
08/14/2025HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
08/14/2025HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
08/14/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
08/14/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
Latest 25 of 31.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01204415-S1Request digital key ↗
08/21/2026B01204415-P3Request digital key ↗
08/21/2026B01204415-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/21/2026B01204415-P3Open ↗
08/21/2026B01204415-S1Open ↗
08/21/2026B01204415-I1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B01363986-I1Open ↗
09/01/2026B01204415-I1Open ↗
09/01/2026B01204415-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01204415-P3Open ↗
08/21/2026B01204415-S1Open ↗
08/21/2026B01204415-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01363986-I1Open ↗
09/01/2026B01204415-I1Open ↗
08/24/2026B01204415-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026B01204415-P3Open ↗
08/21/2026B01204415-S1Open ↗
08/21/2026B01204415-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01384789-I1Open ↗