← Back
Primarily 2 family with 1 store or office
759 DEKALB AVENUE
BROOKLYN · BIN 3049501
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
5,000 sfGross Floor Area
3Units
8 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 759 DEKALB LLC · 2,500 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 13 docs
Floor 3Under Construction1p · 1 filing · 6 docs
Floor 2Under Construction1p · 1 filing · 6 docs
Floor 11p · 1 filing · 7 docs
CellarUnder Construction1p · 1 filing · 6 docs
1 job · most recent 07/29/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2024Permit IssuedZAQ CONSTRUCTION INCVentilation Systems
Ventilation
Captiveaire ND2PSP 2,250 CFM · Kitchen Exhaust ×1
1 job · most recent 07/30/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/30/2024——Gas, Water/Sanitary
1 job · most recent 05/18/2026
Fence
FiledStatusContractorScope
05/18/2026Permit IssuedMORELL BUILDERS INCFence
Building Lifecycle
All (54)Filed (4)Permit Issued (2)Violation (8)Objection (11)Special Inspection (29)
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Other
06/17/2026
Objection raised — Cost
06/17/2026
Objection raised — Other
06/02/2026
Permit issued — Construction Fence
B01401121-S1-FN
05/18/2026
Filed — Alteration
PROPOSED INTERIOR ALTERATION AND HORIZONTAL ENLARGEMENT TO AN EXISTING 3 STORY + CELLAR, 2 DWELLING UNITS AND RETAIL MIX USE BUILDING (NO CHANGE IN USE)
B01401121-I1
05/18/2026
Filed — Alteration
PROPOSED INTERIOR ALTERATION AND HORIZONTAL ENLARGEMENT TO AN EXISTING 3 STORY + CELLAR, 2 DWELLING UNITS AND RETAIL MIX USE BUILDING (NO CHANGE IN USE)
B01401121-S1
05/14/2026
Special inspection requirement — Fenestration areas
05/14/2026
Special inspection requirement — Insulation placement and R values
05/14/2026
Special inspection requirement — Metering
05/14/2026
Special inspection requirement — Fenestration air leakage
05/14/2026
Special inspection requirement — Interior lighting power
05/14/2026
Special inspection requirement — Permanent certificate
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
05/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/14/2026
Special inspection requirement — Air barrier - visual inspection
05/14/2026
Special inspection requirement — Maintenance information
08/06/2024
Permit issued — General Construction
B01081887-I1-GC-CX
07/30/2024
Filed — Alteration
PLUMBING WORK FOR EXISTING DELI STORE @ 1ST. FLOOR. INSTALL NEW FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01082335-I1
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
07/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
07/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
07/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
07/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
07/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
07/29/2024
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING DELI STORE @ 1ST. FLOOR. INSTALL NEW FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01081887-I1
07/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
07/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
07/29/2024
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
07/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
07/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
07/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
07/29/2024
Special inspection requirement — Interior lighting power
Jinfar Liu
07/16/2024
Special inspection requirement — Final
Jinfar Liu
07/16/2024
Special inspection requirement — Mechanical Systems
Jinfar Liu
02/18/2004
Violation issued (HPD, open)
A
02/18/2004
Violation issued (HPD, open)
B
02/18/2004
Violation issued (HPD, open)
A
02/18/2004
Violation issued (HPD, open)
B
02/18/2004
Violation issued (HPD, open)
A
02/18/2004
Violation issued (HPD, open)
B
02/18/2004
Violation issued (HPD, open)
A
08/29/1995
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY CREATIVE DEVELOPERS107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOHAMMAD AHEAD, PE205/18/2026
ZHENG & ASSOCIATES LLC207/30/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAQ CONSTRUCTION INCGeneral Contractor203/21/2026
MORELL BUILDERS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330307/30/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMORELL BUILDERS INC06/02/2026
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC08/06/2024
BISFPISSUEDFIRE COMMAND CO, INC12/22/2010
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/14/2026Fenestration areas—energy_progress
05/14/2026Insulation placement and R values—energy_progress
05/14/2026Metering—energy_progress
05/14/2026Fenestration air leakage—energy_progress
05/14/2026Interior lighting power—energy_progress
05/14/2026Permanent certificate—energy_progress
05/14/2026Fire-Resistant Penetrations and Joints—special
05/14/2026Structural Stability – Alterations of existing buildings—special
05/14/2026Energy Code Compliance Inspections—progress
05/14/2026Fire-Resistance Rated Construction—progress
05/14/2026Fenestration and door U-factor and product ratings—energy_progress
05/14/2026Air barrier - visual inspection—energy_progress
05/14/2026Maintenance information—energy_progress
07/30/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
07/30/2024Tenant Protection Plan ComplianceJinfar Liuspecial
07/30/2024Energy Code Compliance InspectionsJinfar Liuprogress
07/30/2024HVAC-R and service water heating system controlsJinfar Liuenergy_progress
07/30/2024HVAC-R and service water heating equipmentJinfar Liuenergy_progress
07/30/2024HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
07/29/2024HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
07/29/2024Fire-Resistant Penetrations and JointsJinfar Liuspecial
07/29/2024Tenant Protection Plan ComplianceJinfar Liuspecial
07/29/2024Lighting in dwelling unitsJinfar Liuenergy_progress
07/29/2024HVAC-R and service water heating equipmentJinfar Liuenergy_progress
07/29/2024Energy Code Compliance InspectionsJinfar Liuprogress
Latest 25 of 29.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026B01081887-I1Request digital key ↗
08/24/2026B01082335-I1Request digital key ↗
08/17/2026B01401121-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
12/29/2010320251384Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01401121-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026B01081887-I1Open ↗
08/24/2026B01081887-I1Open ↗
08/22/2026B01082335-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026B01082335-I1Open ↗
08/17/2026B01401121-I1Open ↗
08/17/2026B01401121-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B01081887-I1Open ↗
08/24/2026B01081887-I1Open ↗
08/22/2026B01082335-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/29/2010320251384Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B01082335-I1Open ↗
08/13/2026B01081887-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/21/2010320251384Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
12/21/2010320251384Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/14/2026B01401121-I1Open ↗