← Back
Two family converted from one family
252 MONROE STREET
BROOKLYN · BIN 3051385
💬 Discuss this project
1882Year Built
2Stories
B3Building Class
R6BZoning
2,400 sfGross Floor Area
2Units
Two family converted from one family · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction3p · 1 filing · 19 docs
Floor 1Under Construction3p · 1 filing · 19 docs
CellarUnder Construction3p · 1 filing · 19 docs
Sub-BasementUnder Construction3p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1024 DEVELOPMENT GROUP309/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CQ&J CORPORATION207/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor107/22/2026
PLBG P & H INCPlumbing107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIMON7555107/17/2026
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Inspection (1)Special Inspection (11)
09/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/21/2026
Permit issued — General Construction
B01431970-I1-GC
07/21/2026
Permit issued — Plumbing
B01431970-S1-PL
07/17/2026
Filed — Alteration
EXISTING 2 FAMILY BUILDING WITH INTERIOR RENOVATION WITH PARTITION WORK AT THE CELLAR,BASEMENT,1ST AND 2ND FLOOR UNDER THIS APPLICATION.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01431970-S1
07/17/2026
Filed — Alteration
EXISTING 2 FAMILY BUILDING WITH INTERIOR RENOVATION WITH PARTITION WORK AT THE CELLAR,BASEMENT,1ST AND 2ND FLOOR UNDER THIS APPLICATION.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B01431970-I1
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
07/16/2026
Special inspection requirement — Maintenance information
CALVIN TRAN
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
CALVIN TRAN
07/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
CALVIN TRAN
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CALVIN TRAN
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
CALVIN TRAN
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
CALVIN TRAN
07/16/2026
Special inspection requirement — Metering
CALVIN TRAN
07/16/2026
Special inspection requirement — Maintenance information
CALVIN TRAN
07/16/2026
Special inspection requirement — Interior lighting power
CALVIN TRAN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC07/21/2026
DOB NOWPlumbingPermit IssuedPLBG P & H INC07/21/2026
1 project · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
1 project · most recent 07/14/2026
General Wiring
FiledStatusContractorScope
07/14/2026Permit IssuedSolar Pro Electric Inc.General Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/16/2026Energy Code Compliance InspectionsCALVIN TRANprogress
07/16/2026Maintenance informationCALVIN TRANenergy_progress
07/16/2026HVAC-R and service water heating equipmentCALVIN TRANenergy_progress
07/16/2026HVAC-R and service water heating system controlsCALVIN TRANenergy_progress
07/16/2026HVAC-R and service water piping design and insulationCALVIN TRANenergy_progress
07/16/2026Fire-Resistant Penetrations and JointsSIMON JIANGspecial
07/16/2026Energy Code Compliance InspectionsCALVIN TRANprogress
07/16/2026Fire-Resistance Rated ConstructionCALVIN TRANprogress
07/16/2026MeteringCALVIN TRANenergy_progress
07/16/2026Maintenance informationCALVIN TRANenergy_progress
07/16/2026Interior lighting powerCALVIN TRANenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01431970-I1Request digital key ↗
08/16/2026B01431970-S1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/16/2026B01431970-S1Open ↗
08/16/2026B01431970-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B01431970-I1Open ↗
09/02/2026B01431970-I1Open ↗
09/02/2026B01431970-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01431970-I1Open ↗
08/16/2026B01431970-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01431970-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026B01431970-S1Open ↗
08/16/2026B01431970-I1Open ↗