← Back
Over six families without stores
211 JEFFERSON AVENUE
BROOKLYN · BIN 3051963
💬 Discuss this project
1887Year Built
3Stories
C1Building Class
R6BZoning
3,500 sfGross Floor Area
8Units
Rent Stabilized17 Open Violations 16 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: WE 211 JEFFERSON LLC · 2,813 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 5 docs
Floor 33p · 1 filing · 5 docs
Floor 23p · 2 filings · 12 docs
Floor 14p · 2 filings · 12 docs
Cellar9p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WE 490A JEFFERSON1607/08/2026
WE 211 JEFFERSON LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/17/2014$795K—199 STREET, LLC → WE 211 JEFFERSON LLC$227/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALNOUR CONSULTING103/14/2025
BAZINI ENGINEERING, P.C.512/02/2021
NEW YORK ENGINEERING ASSOC., P.C.108/12/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I.M.P. PLBG. & HTG. CORPPlumbing407/08/2026
H.L. GENERAL CONTRACTORSGeneral Contractor203/22/2026
BLUE CITY CONSTRUCTIONGeneral Contractor104/09/2026
MRC SYSTEMS CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALNOUR CONSULTING ENGINEE607103/14/2025
BAZINI ENGINEERING, P.C.1808212/02/2021
NEW YORK ENGINEERING ASSO851108/12/2020
Building Lifecycle
All (78)Filed (7)Permit Issued (6)Violation (60)Inspection (1)Special Inspection (4)
08/21/2025
Permit issued — General Construction
B01096348-I1-GC
03/14/2025
Filed — Alteration
Exterior Facade repair, wythe brick replacement, re-pointing, sealing the crack, replace defected joints. No change in use, egress and occupancy.
B01096348-I1
03/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nouredine Benabdelhak
09/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nouredine Benabdelhak
09/26/2024
Special inspection requirement — Final
Nouredine Benabdelhak
09/04/2024
Violation issued (HPD, closed)
C
09/04/2024
Violation issued (HPD, closed)
C
09/04/2024
Violation issued (HPD, open)
B
08/22/2024
Violation issued (HPD, closed)
C
08/22/2024
Violation issued (HPD, closed)
C
08/22/2024
Violation issued (HPD, closed)
A
06/17/2024
Violation issued (HPD, closed)
C
05/08/2024
Violation issued (HPD, closed)
B
05/08/2024
Violation issued (HPD, closed)
C
05/08/2024
Violation issued (HPD, closed)
B
04/12/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2024
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Violation issued (HPD, closed)
A
05/24/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/21/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/25/2022
Violation issued (HPD, closed)
A
01/26/2022
Violation issued (HPD, closed)
A
01/26/2022
Violation issued (HPD, closed)
A
01/26/2022
Violation issued (HPD, closed)
A
01/26/2022
Violation issued (HPD, closed)
C
01/26/2022
Violation issued (HPD, closed)
B
12/17/2021
Violation issued (HPD, closed)
C
12/04/2021
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
12/02/2021
Filed — Alteration
REPLACEMENT OF OIL-FIRED BOILER WITH GAS-FIRED BOILER. INSTALL NEW HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00397075-P1
12/02/2021
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AND NEW HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00397097-P1
11/14/2021
Permit issued — Plumbing
B00397097-I1-PL
11/09/2021
Permit issued — Boiler Equipment
B00397075-I1-BE
04/09/2021
Violation issued (HPD, closed)
A
10/13/2020
Permit issued — Boiler Equipment
B00397075-I1-BE
10/09/2020
Permit issued — Plumbing
B00397097-I1-PL
10/08/2020
Filed — Alteration
B00397092-I1
10/08/2020
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS-FIRED BOILER AND NEW HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00397097-I1
10/08/2020
Filed — Alteration
REPLACEMENT OF OIL-FIRED BOILER WITH GAS-FIRED BOILER. INSTALL NEW HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00397075-I1
08/13/2020
Permit issued — Mechanical Systems
B00360022-I1-MS
08/12/2020
Filed — Alteration
B00360022-I1
09/25/2017
Violation issued (HPD, closed)
B
09/25/2017
Violation issued (HPD, closed)
B
10/03/2015
Violation issued (HPD, open)
B
10/03/2015
Violation issued (HPD, closed)
C
10/03/2015
Violation issued (HPD, closed)
B
10/03/2015
Violation issued (HPD, closed)
C
10/03/2015
Violation issued (HPD, closed)
C
10/03/2015
Violation issued (HPD, closed)
C
10/03/2015
Violation issued (HPD, closed)
A
10/03/2015
Violation issued (HPD, closed)
B
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/2014
Violation issued (HPD, closed)
C
02/10/2014
Violation issued (HPD, closed)
C
11/07/2011
Violation issued (HPD, closed)
B
10/26/2011
Violation issued (HPD, open)
B
10/26/2011
Violation issued (HPD, open)
B
10/26/2011
Violation issued (HPD, open)
B
10/26/2011
Violation issued (HPD, open)
B
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBLUE CITY CONSTRUCTION08/21/2025
DOB NOWPlumbingSigned-offI.M.P. PLBG. & HTG. CORP11/14/2021
DOB NOWBoiler EquipmentPermit IssuedI.M.P. PLBG. & HTG. CORP11/09/2021
DOB NOWBoiler EquipmentPermit IssuedI.M.P. PLBG. & HTG. CORP10/13/2020
DOB NOWPlumbingSigned-offI.M.P. PLBG. & HTG. CORP10/09/2020
DOB NOWMechanical SystemsPermit IssuedMRC SYSTEMS CORP08/13/2020
1 project · most recent 12/02/2021
Gas
FiledStatusContractorScope
12/02/2021Signed-offI.M.P. PLBG. & HTG. CORPGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/07/2025Tenant Protection Plan ComplianceNouredine Benabdelhakspecial
09/26/2024Structural Stability – Alterations of existing buildingsNouredine Benabdelhakspecial
09/26/2024FinalNouredine Benabdelhakprogress
12/04/2021HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Boiler Equipment3
09/02/2026B00397092-I1Request digital key ↗
08/31/2026B00397075-I1Request digital key ↗
08/31/2026B00397075-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00397097-I1Request digital key ↗
09/02/2026B00397097-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00360022-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/22/2026B01096348-I1Request digital key ↗
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B01096348-I1Open ↗
08/13/2026B00397097-P1Open ↗
08/13/2026B00397097-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B00397097-P1Open ↗
08/13/2026B01096348-I1Open ↗
08/13/2026B00397075-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B01096348-I1Open ↗
08/23/2026B01096348-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01096348-I1Open ↗
08/22/2026B00397075-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan6
08/13/2026B00397075-P1Open ↗
08/13/2026B00397097-P1Open ↗
08/13/2026B00360022-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00397097-I1Open ↗
08/13/2026B00397097-P1Open ↗
08/13/2026B00360022-I1Open ↗
Showing 3 of 7 on file for this type