← Back
Primarily 3 family with 1 store or office
1225 FULTON STREET
BROOKLYN · BIN 3052983
💬 Discuss this project
1910Year Built
4Stories
S3Building Class
C4-5DZoning
5,200 sfGross Floor Area
4Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 1225 FULTON STREET LLC · 2,000 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction2p · 1 filing · 20 docs
1 job · most recent 02/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/04/2026Permit IssuedZONE PLUMBING & HEATING CGas, Water/Sanitary
3 jobs · most recent 06/12/2026
General Wiring
FiledStatusContractorScope
06/12/2026CompleteDORION NORTON ELECL CONTGeneral Wiring
03/26/2026CompleteJONG HYUN KIM—
06/13/2024Permit IssuedRICHARD NEU—
1 job · most recent 02/04/2026
FiledStatusContractorScope
02/04/2026Permit IssuedZONE PLUMBING & HEATING C2 scope_items
1 job · most recent 06/04/2024
Sidewalk Shed
FiledStatusContractorScope
06/04/2024Permit IssuedALL EMPIRE BUILDING CONSidewalk Shed
1 job · most recent 02/04/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/04/2026Permit IssuedZONE PLUMBING & HEATING CTenant Protection Plan 72 Hour
Building Lifecycle
All (94)Filed (7)Permit Issued (5)Signed Off (1)Violation (54)Inspection (10)Special Inspection (17)
08/10/2026
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01392523-I1
07/31/2026
Permit issued — Sign
B01392523-I1-SG
07/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/04/2026
Violation issued (HPD, open)
A
05/02/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01392523-I1
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2026
Filed — Alteration
APPLICATION BEING FILED TO BUILD A NEW RESTAURANT ON EXISTING UG 6 EATING AND DRINKING ESTABLISHMENT.
B01327114-P2
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBERT DYER
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
02/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/02/2026
Filed — Alteration
APPLICATION BEING FILED TO BUILD A NEW RESTAURANT ON EXISTING UG 6 EATING AND DRINKING ESTABLISHMENT.
B01327114-P1
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBERT DYER
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBERT DYER
01/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2026
Permit issued — Plumbing
B01327114-S1-PL
01/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/11/2025
Permit issued — General Construction
B01327114-I1-GC-CX
12/02/2025
Filed — Alteration
APPLICATION BEING FILED TO BUILD A NEW RESTAURANT ON EXISTING UG 6 EATING AND DRINKING ESTABLISHMENT.
B01327114-S1
12/02/2025
Filed — Alteration
APPLICATION BEING FILED TO BUILD A NEW RESTAURANT ON EXISTING UG 6 EATING AND DRINKING ESTABLISHMENT.
B01327114-I1
12/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
SEBERT DYER
12/02/2025
Special inspection requirement — Final
SEBERT DYER
12/02/2025
Special inspection requirement — Fenestration air leakage
SEBERT DYER
12/02/2025
Special inspection requirement — Air barrier - visual inspection
SEBERT DYER
12/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
SEBERT DYER
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBERT DYER
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBERT DYER
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBERT DYER
12/02/2025
Special inspection requirement — Mechanical Systems
SEBERT DYER
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/2025
Violation issued (HPD, open)
A
12/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/26/2024
Violation issued (HPD, closed)
I
06/14/2024
Permit issued — Supported Scaffold
B01063756-I1-SF
06/11/2024
Filed — Alteration
B01063756-I1
06/06/2024
Permit issued — Sidewalk Shed
B01060535-I1-SH
06/04/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01060535-I1
04/10/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/22/2023
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
C
02/22/2022
Violation issued (HPD, open)
B
02/22/2022
Violation issued (HPD, closed)
C
02/22/2022
Violation issued (HPD, closed)
B
02/22/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
C
02/19/2022
Violation issued (HPD, open)
C
02/19/2022
Violation issued (HPD, closed)
C
02/19/2022
Violation issued (HPD, closed)
C
02/16/2022
Violation issued (HPD, closed)
C
02/16/2022
Violation issued (HPD, closed)
C
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALL EMPIRE BUILDING CONTRACTORS INC903/22/2026
1225 FULTON STREET LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.105/02/2026
BUILDING ENGINEERING SYSTEMS PLLC402/04/2026
ASHRAF CORP206/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SHEIKH EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL EMPIRE BUILDING CONGeneral Contractor603/21/2026
HERMAN LAMBEYElectrical103/21/2026
PETERKIN CONSTRUCTION LLCGeneral Contractor104/09/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold108/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALL STATE PROPERTY INSPEC4288402/04/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC07/31/2026
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C01/09/2026
DOB NOWGeneral ConstructionPermit IssuedPETERKIN CONSTRUCTION LLC12/11/2025
DOB NOWSupported ScaffoldPermit IssuedALL EMPIRE BUILDING CON06/14/2024
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON06/06/2024
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/04/2026HVAC-R and service water piping design and insulationSEBERT DYERenergy_progress
02/04/2026Energy Code Compliance InspectionsSEBERT DYERprogress
02/04/2026Fire-Resistant Penetrations and JointsSEBERT DYERspecial
02/04/2026Tenant Protection Plan Compliance—special
02/02/2026Fire-Resistant Penetrations and JointsSEBERT DYERspecial
02/02/2026Tenant Protection Plan ComplianceSEBERT DYERspecial
02/02/2026Energy Code Compliance InspectionsSEBERT DYERprogress
02/02/2026HVAC-R and service water piping design and insulationSEBERT DYERenergy_progress
12/02/2025Fire-Resistance Rated ConstructionSEBERT DYERprogress
12/02/2025FinalSEBERT DYERprogress
12/02/2025Fenestration air leakageSEBERT DYERenergy_progress
12/02/2025Air barrier - visual inspectionSEBERT DYERenergy_progress
12/02/2025Duct leakage testing, insulation and designSEBERT DYERenergy_progress
12/02/2025Energy Code Compliance InspectionsSEBERT DYERprogress
12/02/2025Tenant Protection Plan ComplianceSEBERT DYERspecial
12/02/2025Fire-Resistant Penetrations and JointsSEBERT DYERspecial
12/02/2025Mechanical SystemsSEBERT DYERspecial
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026B01060535-I1Request digital key ↗
08/24/2026B01063756-I1Request digital key ↗
08/18/2026B01327114-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
08/31/2026B01327114-I1Open ↗
08/31/2026B01327114-I1Open ↗
08/31/2026B01327114-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026B01327114-P2Open ↗
08/18/2026B01327114-I1Open ↗
08/18/2026B01327114-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B01327114-I1Open ↗
08/31/2026B01327114-I1Open ↗
08/31/2026B01327114-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026B01327114-P2Open ↗
08/18/2026B01327114-P1Open ↗
08/18/2026B01327114-I1Open ↗
Showing 3 of 4 on file for this type