Roof110p · 1 filing · 2 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralZ
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 110 drawing sheets
Bulkhead12p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 12 drawing sheets
Penthouse4p · 1 filing · 2 docs
Fire ProtectionPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 811p · 1 filing · 2 docs
Fire Protection
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 681p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 671p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 661p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 651p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 641p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 631p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 621p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 611p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 601p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 591p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 581p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 571p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 561p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 551p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 541p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 531p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 521p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 511p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 501p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 491p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 483p · 1 filing · 2 docs
Fire ProtectionPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Floor 471p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 461p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 451p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 441p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 431p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 421p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 411p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 401p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 393p · 1 filing · 2 docs
DMPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Floor 381p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 373p · 1 filing · 2 docs
MechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Floor 364p · 1 filing · 2 docs
MechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 351p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 341p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 331p · 1 filing · 2 docs
Plumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 322p · 1 filing · 2 docs
MechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 2 drawing sheets
Floor 312p · 1 filing · 2 docs
MechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 2 drawing sheets
Floor 302p · 1 filing · 2 docs
MechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 2 drawing sheets
Floor 293p · 1 filing · 2 docs
Fire ProtectionMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Floor 283p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Floor 273p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Floor 264p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 254p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 244p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 235p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 5 drawing sheets
Floor 223p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 3 drawing sheets
Floor 214p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 204p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 195p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 5 drawing sheets
Floor 186p · 1 filing · 2 docs
ArchitectureGeneralMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 6 drawing sheets
Floor 176p · 1 filing · 2 docs
ArchitectureGeneralMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 6 drawing sheets
Floor 164p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 154p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 144p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 134p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 125p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 5 drawing sheets
Floor 114p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 104p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 94p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets
Floor 810p · 1 filing · 2 docs
ArchitectureMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 10 drawing sheets
Floor 713p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 13 drawing sheets
Floor 619p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 19 drawing sheets
Floor 520p · 1 filing · 2 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 20 drawing sheets
Floor 420p · 1 filing · 2 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 20 drawing sheets
Floor 341p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructuralZ
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 41 drawing sheets
No filed description on record for this project.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
15 documents · 1 drawing sheet
Floor 257p · 2 filings · 17 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 57 drawing sheets
No filed description on record for this project.
On file for this project
15 documents · 1 drawing sheet
Floor 167p · 1 filing · 2 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 67 drawing sheets
Mezzanine13p · 1 filing · 2 docs
ArchitecturePlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 13 drawing sheets
Cellar104p · 3 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 102 drawing sheets
No filed description on record for this project.
On file for this project
13 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
9 documents · 1 drawing sheet
Sub-Cellar6p · 1 filing · 2 docs
ArchitectureGeneralMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 6 drawing sheets
Basement28p · 1 filing · 2 docs
ArchitectureDMGeneralMechanicalPlumbingStructural
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 28 drawing sheets