← Back
Three families
148 WASHINGTON AVENUE
BROOKLYN · BIN 3054392
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6BZoning
3,236 sfGross Floor Area
3Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 211p · 2 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Cellar7p · 1 filing · 16 docs
Sub-Basement9p · 2 filings · 20 docs
1 job · most recent 10/18/2024
Others
FiledStatusContractorScopeMake / Model / Capacity
10/18/2024Permit IssuedDRAKES CARPENTRY & WOOD**Others
Other
1 job · most recent 10/18/2024
Gas Water/Sanitary
FiledStatusContractorScope
10/18/2024Permit IssuedSAMUEL & SONS P & H INCGas, Water/Sanitary
2 jobs · most recent 03/30/2023
General Wiring
FiledStatusContractorScope
03/30/2023Permit IssuedBOBTEK ELECTRICAL CORP.General Wiring
06/27/2021CompleteJEM ELEC'L CONTR. CORPGeneral Wiring
Building Lifecycle
All (104)Filed (6)Permit Issued (7)Signed Off (1)Violation (22)Inspection (8)Objection (33)Special Inspection (27)
05/06/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
11/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/01/2024
Objection raised — Scope
10/25/2024
Objection resolved — Addressed
10/24/2024
Objection raised — Scope
10/18/2024
Filed — Alteration
Install new Plumbing in conjunction with general construction plan (filed separately (JOB # B08021619-I1).
B08035365-P1
10/18/2024
Filed — Alteration
Interior reno per plans: At cellar; Unit 1 - BSMT/1st fl.; and Unit 2 - 2nd Fl limited to new laundry closet. No 3rd Fl. work. MH work per Mechanical Code 2022 and limited to bathroom/clothes dryer exhaust/venting and replacing F.A.I at ex'g boiler room.
B08021619-P1
09/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/22/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/16/2024
Permit issued — Plumbing
B08035365-I1-PL
04/12/2024
Violation issued (HPD, open)
A
02/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2024
Permit issued — General Construction
B08021619-I1-GC-CX
11/17/2023
Violation issued (HPD, open)
I
03/27/2023
Violation issued (HPD, open)
A
03/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2023
Permit issued — Mechanical Systems
B08021619-I1-GC-CX
03/07/2023
Permit issued — General Construction
B08021619-I1-GC-CX
03/03/2023
Permit issued — Plumbing
B08035365-I1-PL
02/15/2023
Objection raised — Admin
02/15/2023
Objection raised — Structural
02/15/2023
Objection raised — Structural
02/15/2023
Objection raised — Admin
02/15/2023
Objection raised — Inspections
02/15/2023
Objection raised — Scope
02/15/2023
Objection raised — Admin
02/15/2023
Objection raised — Cost
02/15/2023
Objection raised — Structural
02/15/2023
Objection raised — Admin
02/15/2023
Special inspection requirement — Seismic Isolation Systems
02/13/2023
Filed — Alteration
B08046283-I1
02/12/2023
Special inspection requirement — Subgrade Inspections
01/19/2023
Objection raised — Energy
01/19/2023
Objection resolved — Addressed
01/19/2023
Objection raised — Other
01/19/2023
Objection resolved — Addressed
01/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Choudhry Yusaf
01/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Choudhry Yusaf
01/11/2023
Objection raised — Fire_Protection
01/11/2023
Objection resolved — Addressed
01/11/2023
Objection raised — Fire_Protection
01/11/2023
Objection resolved — Addressed
01/11/2023
Objection raised — Other
01/11/2023
Objection resolved — Addressed
01/11/2023
Objection raised — Scope
01/11/2023
Objection resolved — Addressed
01/10/2023
Filed — Alteration
Install new Plumbing in conjunction with general construction plan (filed separately (JOB # B08021619-I1).
B08035365-I1
12/10/2022
Special inspection requirement — Concrete - Precast
12/10/2022
Special inspection requirement — Structural Steel - High Strength Bolting
12/10/2022
Special inspection requirement — Structural Steel - Welding
11/29/2022
Special inspection requirement — Construction Operations Influencing Adjacent Structures
11/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/29/2022
Special inspection requirement — Footing and Foundation
11/29/2022
Special inspection requirement — Structural Steel - Details
Latest 60 of 104 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DDG ARCHITECTURE, P.C.510/18/2024
MDM ARCHITECTURE, LLC105/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CARNER ASSOCIATES203/21/2026
D+DG ARCHITECTURE503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DRAKES CARPENTRY & WOOD**General Contractor903/21/2026
MPZ CONSTRUCTION INCGeneral Contractor407/08/2026
SAMUEL & SONS P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNA BUILDERS AND CONSULTA2898210/18/2024
CROSSCHECK INSPECTION SER544105/20/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSAMUEL & SONS P & H INC08/16/2024
DOB NOWGeneral ConstructionPermit IssuedDRAKES CARPENTRY & WOOD**01/09/2024
DOB NOWMechanical SystemsPermit IssuedDRAKES CARPENTRY & WOOD**03/14/2023
DOB NOWGeneral ConstructionPermit IssuedDRAKES CARPENTRY & WOOD**03/07/2023
DOB NOWPlumbingPermit IssuedSAMUEL & SONS P & H INC03/03/2023
DOB NOWGeneral ConstructionSigned-offMPZ CONSTRUCTION INC07/01/2021
DOB NOWGeneral ConstructionSigned-offMPZ CONSTRUCTION INC06/11/2021
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/04/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2024Pass-Final PL - UndergroundPassView ↗
02/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
02/15/2023Seismic Isolation Systems—special
02/12/2023Subgrade Inspections—special
01/13/2023Energy Code Compliance InspectionsChoudhry Yusafprogress
01/13/2023Structural Stability – Alterations of existing buildingsChoudhry Yusafspecial
12/10/2022Concrete - Precast—special
12/10/2022Structural Steel - High Strength Bolting—special
12/10/2022Structural Steel - Welding—special
11/29/2022Construction Operations Influencing Adjacent Structures—special
11/29/2022Structural Stability – Alterations of existing buildings—special
11/29/2022Footing and Foundation—progress
11/29/2022Structural Steel - Details—special
11/29/2022Final—progress
10/29/2022Fenestration areasChoudhry Yusafenergy_progress
10/29/2022Fire-Resistant Penetrations and JointsChoudhry Yusafspecial
10/29/2022Fenestration and door U-factor and product ratingsChoudhry Yusafenergy_progress
10/29/2022Lighting in dwelling unitsChoudhry Yusafenergy_progress
10/29/2022Fenestration air leakageChoudhry Yusafenergy_progress
10/29/2022Insulation placement and R valuesChoudhry Yusafenergy_progress
10/14/2022FinalChoudhry Yusafprogress
10/14/2022Mechanical SystemsChoudhry Yusafspecial
05/06/2021Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
05/06/2021Lighting in dwelling unitsMICHAEL D'INNOCENZIenergy_progress
05/06/2021Lighting controlsMICHAEL D'INNOCENZIenergy_progress
05/06/2021Insulation placement and R valuesMICHAEL D'INNOCENZIenergy_progress
05/06/2021Energy Code Compliance InspectionsMICHAEL D'INNOCENZIprogress
Latest 25 of 27.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00516540-I1Request digital key ↗
08/27/2026B08046283-I1Request digital key ↗
08/23/2026B08035365-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature12
08/24/2026B00516540-I1Open ↗
08/24/2026B00516540-I1Open ↗
08/24/2026B00516540-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00516540-I1Open ↗
08/28/2026B08021619-I1Open ↗
08/28/2026B08021619-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/24/2026B00516540-I1Open ↗
08/24/2026B00516540-I1Open ↗
08/23/2026B08021619-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00516540-I1Open ↗
08/27/2026B08046283-I1Open ↗
08/23/2026B08035365-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00516540-I1Open ↗