← Back
Primarily 2 family with 1 store or office
601 MYRTLE AVENUE
BROOKLYN · BIN 3054691
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R7AZoning
2,700 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 1,894 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
Architecture
Floor 31p · 1 filing · 10 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGT ARCHITECTURE P.C.203/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FANG ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LENNOX NELSONElectrical103/21/2026
URENA CONST & DESIGN INCGeneral Contractor107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513203/04/2025
Building Lifecycle
All (24)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Inspection (7)Special Inspection (10)
09/25/2025
Signed off — Alteration
INTERIOR RENOVATION OF AN EXIST. APARTMENT ON 3RD FLOOR ONLY. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B01172968-S1
09/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2025
Signed off — Alteration
INTERIOR RENOVATION OF AN EXIST. APARTMENT ON 3RD FLOOR ONLY. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B01172968-I1
08/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/02/2025
Permit issued — Plumbing
B01172968-S1-PL
03/19/2025
Permit issued — General Construction
B01172968-I1-GC
03/04/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXIST. APARTMENT ON 3RD FLOOR ONLY. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B01172968-S1
02/25/2025
Filed — Alteration
INTERIOR RENOVATION OF AN EXIST. APARTMENT ON 3RD FLOOR ONLY. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY.
B01172968-I1
02/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
DEZHANG FANG
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
01/28/2025
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
01/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/28/2025
Special inspection requirement — Interior lighting power
DEZHANG FANG
01/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
01/28/2025
Special inspection requirement — Fenestration areas
DEZHANG FANG
01/28/2025
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
01/28/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
12/05/2017
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR04/02/2025
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC03/19/2025
BISFPISSUEDIDEAL FIRE CONTROL INC11/25/2003
1 project · most recent 09/16/2024
FiledStatusContractorScope
09/16/2024CompleteALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/25/2025Tenant Protection Plan ComplianceDEZHANG FANGspecial
01/30/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/28/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
01/28/2025Fenestration air leakageDEZHANG FANGenergy_progress
01/28/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/28/2025Interior lighting powerDEZHANG FANGenergy_progress
01/28/2025Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
01/28/2025Fenestration areasDEZHANG FANGenergy_progress
01/28/2025Insulation placement and R valuesDEZHANG FANGenergy_progress
01/28/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026B01172968-S1Request digital key ↗
08/22/2026B01172968-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01172968-I1Open ↗
08/13/2026B01172968-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B01172968-I1Open ↗
08/23/2026B01172968-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01172968-S1Open ↗
08/23/2026B01172968-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B01172968-S1Open ↗
08/13/2026B01172968-I1Open ↗