Primarily 2 family with 1 store or office
606 MYRTLE AVENUE
BROOKLYN · BIN 3054922
💬 Discuss this project
1959Year Built
3Stories
S2Building Class
R7AZoning
2,430 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 1,875 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
Fire Protection
Penthouse1p · 1 filing · 17 docs
Floor 31p · 1 filing · 17 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 17 docs
1 job · most recent 06/12/2026
Sprinkler System
FiledStatusContractorScope
06/12/2026——Sprinkler System
1 job · most recent 06/12/2026
Steel Concrete
FiledStatusContractorScope
06/12/2026——Steel, Concrete
Building Lifecycle
All (83)Filed (5)Violation (2)Objection (46)Special Inspection (30)
06/18/2026
Objection raised — Other
06/18/2026
Objection resolved — Addressed
06/18/2026
Objection resolved — Addressed
06/15/2026
Objection raised — Other
06/15/2026
Objection raised — Inspections
06/15/2026
Objection raised — Inspections
06/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed vertical and horizontal enlargement to an existing three (3) story + cellar mixed use building; converting to a four (4) story + cellar, mezzanine and penthouse residential use building.
B01250268-S3
06/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed vertical and horizontal enlargement to an existing three (3) story + cellar mixed use building; converting to a four (4) story + cellar, mezzanine and penthouse residential use building.
B01250268-S1
06/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed vertical and horizontal enlargement to an existing three (3) story + cellar mixed use building; converting to a four (4) story + cellar, mezzanine and penthouse residential use building.
B01250268-S4
06/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed vertical and horizontal enlargement to an existing three (3) story + cellar mixed use building; converting to a four (4) story + cellar, mezzanine and penthouse residential use building.
B01250268-S2
05/28/2026
Special inspection requirement — Subgrade Inspections
05/28/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
05/28/2026
Special inspection requirement — Concrete - Cast-In-Place
05/28/2026
Special inspection requirement — Structural Cold-Formed Steel
05/28/2026
Special inspection requirement — Footing and Foundation
05/28/2026
Special inspection requirement — Final
05/28/2026
Special inspection requirement — Underpinning
05/26/2026
Special inspection requirement — Structural Steel - Details
05/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/26/2026
Special inspection requirement — Post-installed anchors in masonry
05/26/2026
Special inspection requirement — Concrete - Cast-In-Place
05/26/2026
Special inspection requirement — Final
05/26/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
05/26/2026
Special inspection requirement — Structural Steel - Welding
05/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/12/2026
Special inspection requirement — Sprinkler Systems
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/12/2026
Special inspection requirement — Post-installed Anchors
04/17/2026
Objection resolved — Resolved
03/18/2026
Objection raised — Admin
03/17/2026
Objection resolved — Addressed
03/17/2026
Objection resolved — Resolved
03/09/2026
Objection raised — Mechanical
03/09/2026
Objection raised — Admin
03/09/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/03/2026
Objection raised — Other
03/02/2026
Objection resolved — Addressed
09/17/2025
Objection raised — Admin
09/17/2025
Objection raised — Other
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
09/04/2025
Objection resolved — Addressed
08/08/2025
Objection raised — Zoning
08/07/2025
Objection raised — Plumbing
08/07/2025
Objection raised — Zoning
08/07/2025
Objection raised — Fire_Protection
08/07/2025
Objection raised — Cost
08/07/2025
Objection raised — Scope
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
Latest 60 of 83 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2026$2.6M—— → —$1,070/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BGM ENGNEERING306/12/2026
VASILIOS ARTEMIOU PE106/11/2026
BAOBAB ARCHITECTS P.C.107/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/28/2026Subgrade Inspections—special
05/28/2026Excavations - Sheeting, Shoring, and Bracing—special
05/28/2026Concrete - Cast-In-Place—special
05/28/2026Structural Cold-Formed Steel—special
05/28/2026Footing and Foundation—progress
05/28/2026Final—progress
05/28/2026Underpinning—special
05/26/2026Structural Steel - Details—special
05/26/2026Structural Stability – Alterations of existing buildings—special
05/26/2026Post-installed anchors in masonry—special
05/26/2026Concrete - Cast-In-Place—special
05/26/2026Final—progress
05/26/2026Wall Panels, Curtain Walls, and Veneers—special
05/26/2026Structural Steel - Welding—special
05/26/2026Structural Steel - High Strength Bolting—special
05/12/2026Sprinkler Systems—special
05/12/2026Fire-Resistant Penetrations and Joints—special
05/12/2026Post-installed Anchors—special
07/09/2025Sprayed fire-resistant materials—special
07/09/2025Seismic Isolation Systems—special
07/03/2025Fenestration and door U-factor and product ratings—energy_progress
07/03/2025Lighting in dwelling units—energy_progress
07/03/2025Insulation placement and R values—energy_progress
07/03/2025Metering—energy_progress
07/03/2025Fenestration air leakage—energy_progress
Latest 25 of 35.
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026B01250268-I1Request digital key ↗
08/16/2026B01250268-S1Request digital key ↗
08/15/2026B01250268-S4Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026B01250268-I1Open ↗
08/13/2026B01250268-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01250268-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026B01250268-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026B01250268-S2Open ↗
08/16/2026B01250268-S1Open ↗
08/16/2026B01250268-S4Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01250268-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01250268-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026B01250268-I1Open ↗