Primarily 1 family with 1 store or office
917 FULTON STREET
BROOKLYN · Clinton Hill · BIN 3056628
💬 Discuss this project
1930Year Built
2Stories
S1Building Class
R7AZoning
1,680 sfGross Floor Area
2Units
7 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · 1,046 sf lot · 1.61 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SMACK BURGER INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AYALA ENGINEERING PC509/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUN503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLPRO GENERAL CNTRTING CGeneral Contractor303/21/2026
UNIQUE FIRE SYSTEMS INCGeneral Contractor203/21/2026
VOLTRON ELECTRIC LLCElectrical103/22/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AYALA ENGINEERING P.C.9207509/03/2024
Building Lifecycle
All (47)Filed (5)Permit Issued (3)Signed Off (2)Violation (8)Inspection (4)Special Inspection (25)
09/10/2024
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW HOOD SYSTEM, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS, OROCCUPANCY UNDER THIS APPLICATION
B01079826-I1
09/09/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/03/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW HOOD SYSTEM, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS, OROCCUPANCY UNDER THIS APPLICATION
B01079826-P3
09/03/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
09/03/2024
Special inspection requirement — Mechanical Systems
Pablo Ayala
09/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Pablo Ayala
09/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
09/03/2024
Special inspection requirement — Final
Pablo Ayala
09/03/2024
Special inspection requirement — Interior lighting power
Pablo Ayala
09/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
09/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Pablo Ayala
09/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
09/03/2024
Special inspection requirement — Mechanical Systems
Pablo Ayala
09/03/2024
Special inspection requirement — Final
Pablo Ayala
09/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
09/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
09/03/2024
Special inspection requirement — Interior lighting power
Pablo Ayala
08/12/2024
Signed off — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW HOOD SYSTEM, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS, OROCCUPANCY UNDER THIS APPLICATION
B01079826-S2
08/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW HOOD SYSTEM, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS, OROCCUPANCY UNDER THIS APPLICATION
B01079826-P2
07/29/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW HOOD SYSTEM, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS, OROCCUPANCY UNDER THIS APPLICATION
B01079826-P1
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
07/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Pablo Ayala
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Pablo Ayala
07/29/2024
Special inspection requirement — Mechanical Systems
Pablo Ayala
07/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Pablo Ayala
07/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Pablo Ayala
07/29/2024
Special inspection requirement — Final
Pablo Ayala
07/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Pablo Ayala
07/29/2024
Special inspection requirement — Interior lighting power
Pablo Ayala
07/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Pablo Ayala
07/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Pablo Ayala
07/26/2024
Permit issued — Plumbing
B01079826-S2-PL
07/25/2024
Permit issued — General Construction
B01079826-I1-MS
07/18/2024
Permit issued — General Construction
B01079826-I1-GC
07/16/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW HOOD SYSTEM, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS, OROCCUPANCY UNDER THIS APPLICATION
B01079826-I1
07/16/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW HOOD SYSTEM, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS, OROCCUPANCY UNDER THIS APPLICATION
B01079826-S2
04/01/2024
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, open)
B
04/01/2024
Violation issued (HPD, open)
B
04/01/2024
Violation issued (HPD, open)
B
03/10/2015
Violation issued (HPD, open)
B
03/10/2015
Violation issued (HPD, open)
C
03/10/2015
Violation issued (HPD, open)
B
12/26/2007
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG07/26/2024
DOB NOWGeneral ConstructionSigned-offJJK BUILDING CONSULTING07/25/2024
DOB NOWGeneral ConstructionSigned-offALLPRO GENERAL CNTRTING C07/18/2024
BISEQISSUEDA KAZI CONSTRUCTION CO04/23/1998
BISOTISSUEDA.KAZI CONSTRUCTION CO02/26/1998
BISOTISSUEDQUALITY & SPEED CONSTRUCTION07/19/1996
2 projects · most recent 10/15/2025
General Wiring
FiledStatusContractorScope
10/15/2025CompleteVOLTRON ELECTRIC LLC3 meters, 2 new_meters
07/24/2024CompleteVOLTRON ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/09/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
08/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/03/2024Fire-Resistant Penetrations and JointsPablo Ayalaspecial
09/03/2024Mechanical SystemsPablo Ayalaspecial
09/03/2024Tenant Protection Plan CompliancePablo Ayalaspecial
09/03/2024Energy Code Compliance InspectionsPablo Ayalaprogress
09/03/2024FinalPablo Ayalaprogress
09/03/2024Interior lighting powerPablo Ayalaenergy_progress
09/03/2024HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
09/03/2024Tenant Protection Plan CompliancePablo Ayalaspecial
09/03/2024Fire-Resistant Penetrations and JointsPablo Ayalaspecial
09/03/2024Mechanical SystemsPablo Ayalaspecial
09/03/2024FinalPablo Ayalaprogress
09/03/2024Energy Code Compliance InspectionsPablo Ayalaprogress
09/03/2024HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
09/03/2024Interior lighting powerPablo Ayalaenergy_progress
07/29/2024Fire-Resistant Penetrations and JointsPablo Ayalaspecial
07/29/2024Tenant Protection Plan CompliancePablo Ayalaspecial
07/29/2024Fire-Resistant Penetrations and JointsPablo Ayalaspecial
07/29/2024Mechanical SystemsPablo Ayalaspecial
07/29/2024Tenant Protection Plan CompliancePablo Ayalaspecial
07/29/2024Energy Code Compliance InspectionsPablo Ayalaprogress
07/29/2024FinalPablo Ayalaprogress
07/29/2024HVAC-R and service water heating equipmentPablo Ayalaenergy_progress
07/29/2024Interior lighting powerPablo Ayalaenergy_progress
07/29/2024HVAC-R and service water heating system controlsPablo Ayalaenergy_progress
07/29/2024HVAC-R and service water piping design and insulationPablo Ayalaenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B01079826-I1Request digital key ↗
08/24/2026B01079826-P3Request digital key ↗
08/24/2026B01079826-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B01079826-I1Open ↗
08/31/2026B01079826-I1Open ↗
08/25/2026B01079826-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026B01079826-P1Open ↗
08/24/2026B01079826-S2Open ↗
08/24/2026B01079826-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01079826-P2Open ↗
08/31/2026B01079826-I1Open ↗
08/25/2026B01079826-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B01079826-I1Open ↗
08/24/2026B01079826-P1Open ↗
08/24/2026B01079826-S2Open ↗
Showing 3 of 5 on file for this type