← Back
Miscellaneous religious facility
197 ST JAMES PLACE
BROOKLYN · BIN 3056690
💬 Discuss this project
1889Year Built
2Stories
M9Building Class
R6BZoning
4,900 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous religious facility · Owner of record: 197 ST JAMES LLC · 2,500 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 2 filings · 13 docs
Floor 2Under Construction20p · 4 filings · 20 docs
Floor 1Under Construction19p · 4 filings · 20 docs
CellarUnder Construction20p · 4 filings · 20 docs
1 job · most recent 02/04/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/04/2026Permit IssuedTRIWORKS INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MODEL: SEZ-AD15NL 66,000 BTU · Vrf Indoor ×4
MODEL: PMFY-P12NBMU-ER5 51,000 BTU · Vrf Indoor ×2
MODEL: SEZ-AD18NL 39,600 BTU · Ahu ×2
Heat / Cool
Mitsubishi Electric MODEL: MXZ-SM48NL 98,000 BTU · Condensing Unit ×2
MODEL: MXZ-3D24NL 47,000 BTU · Condensing Unit ×1
1 job · most recent 08/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/17/2026Permit IssuedCK PLUMBING & MECH INCGas, Water/Sanitary
2 jobs · most recent 11/01/2025
General Wiring
FiledStatusContractorScope
11/01/2025Permit IssuedR-2 ELECTRIC INCGeneral Wiring
10/08/2025Permit IssuedR-2 ELECTRIC INC—
2 jobs · most recent 08/17/2026
Wood
FiledStatusContractorScope
08/17/2026Permit IssuedCK PLUMBING & MECH INCWood
03/24/2026Permit IssuedRD HOME CONSTRUCTION INCWood
Building Lifecycle
All (61)Filed (9)Permit Issued (7)Violation (1)Objection (34)Special Inspection (10)
08/25/2026
Permit issued — Structural
B01169845-S1-ST
08/17/2026
Filed — Alteration
Reframing on all floors and roof. Change of use from House of Worship to a Two Family Residence. No change in egress.
B01218566-P3
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Helge Fuhrmann
05/19/2026
Filed — Alteration
Reframing on all floors and roof. Change of use from House of Worship to a Two Family Residence. No change in egress.
B01218566-P2
05/13/2026
Filed — Alteration
Reframing on all floors and roof. Change of use from House of Worship to a Two Family Residence. No change in egress.
B01218566-P1
04/16/2026
Permit issued — General Construction
B01169845-I1-GC
03/31/2026
Objection resolved — Addressed
03/26/2026
Objection raised — Cost
03/24/2026
Filed — Alteration CO
Conversion of existing House of Worship into a Two Family Residence
B01169845-S1
03/16/2026
Permit issued — Plumbing
B01276868-I1-EW-SP
02/11/2026
Permit issued — Mechanical Systems
B01354977-I1-MS
02/09/2026
Permit issued — Plumbing
B01218566-I1-PL
02/06/2026
Objection raised — Admin
02/06/2026
Objection raised — Admin
02/04/2026
Filed — Alteration
HEREWITH FILE PLANS FOR MECHANICAL SYSTEM ON AN EXISTING 1 FAMILY HOUSE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01354977-I1
02/03/2026
Special inspection requirement — Mechanical Systems
Tae Chong
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tae Chong
02/03/2026
Special inspection requirement — Final
Tae Chong
01/26/2026
Objection resolved — Addressed
01/22/2026
Objection raised — Scope
01/13/2026
Filed — Alteration
Reframing on all floors and roof. Change of use from House of Worship to a Two Family Residence. No change in egress.
B01218566-S1
12/18/2025
Special inspection requirement — Preliminary
12/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/17/2025
Special inspection requirement — Final
11/14/2025
Permit issued — Plumbing
B01218566-I1-PL
09/24/2025
Permit issued — General Construction
B01169845-I1-GC
09/23/2025
Objection raised — Scope
09/23/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
08/29/2025
Filed — Alteration
B01276868-I1
08/26/2025
Objection resolved — Addressed
08/25/2025
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
08/04/2025
Objection raised — Cost
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Cost
06/16/2025
Objection resolved — Addressed
06/11/2025
Objection raised — Plumbing
06/11/2025
Objection raised — Plumbing
06/11/2025
Objection raised — Plumbing
06/11/2025
Objection raised — Plumbing
06/11/2025
Objection raised — Plumbing
06/03/2025
Objection resolved — Addressed
05/29/2025
Filed — Alteration
Reframing on all floors and roof. Change of use from House of Worship to a Two Family Residence. No change in egress.
B01218566-I1
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/21/2025
Objection raised — Fire_Protection
05/21/2025
Objection raised — Scope
05/21/2025
Objection raised — Fire_Protection
05/21/2025
Objection raised — Scope
05/21/2025
Objection raised — Scope
05/21/2025
Objection raised — Structural
05/15/2025
Filed — Alteration CO
Conversion of existing House of Worship into a Two Family Residence
B01169845-I1
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Helge Fuhrmann
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Helge Fuhrmann
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
388 AMZI HILL2109/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/15/2024$1.9M—Private party → 197 ST JAMES LLC$380/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FUHRMANN ARCHITECTURE PLLC508/17/2026
WILLIAM JAMES O'HANLON203/24/2026
CHONG ENGINEERING, P.C.102/04/2026
WAVIC ENGINEERING PLLC108/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNC-DESIGN SPACE103/21/2026
FIRST IMAGE PROJECT DESIGN303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RD HOME CONSTRUCTION INCGeneral Contractor308/26/2026
TRIWORKS INCGeneral Contractor303/21/2026
R-2 ELECTRIC INCElectrical203/22/2026
CK PLUMBING & MECH INCPlumbing207/08/2026
DC BUILDING SERVICES INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUHRMANN ARCHITECTURE LLC8109708/17/2026
CHONG ENGINEERING P.C.7411102/04/2026
WAVIC ENGINEERING PLLC1733108/29/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedRD HOME CONSTRUCTION INC08/25/2026
DOB NOWGeneral ConstructionPermit IssuedRD HOME CONSTRUCTION INC04/16/2026
DOB NOWPlumbingPermit IssuedDC BUILDING SERVICES INC03/16/2026
DOB NOWMechanical SystemsPermit IssuedTRIWORKS INC02/11/2026
DOB NOWPlumbingPermit IssuedCK PLUMBING & MECH INC02/09/2026
DOB NOWPlumbingPermit IssuedCK PLUMBING & MECH INC11/14/2025
DOB NOWGeneral ConstructionPermit IssuedRD HOME CONSTRUCTION INC09/24/2025
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/20/2026Fire-Resistant Penetrations and JointsHelge Fuhrmannspecial
02/03/2026Mechanical SystemsTae Chongspecial
02/03/2026Fire-Resistant Penetrations and JointsTae Chongspecial
02/03/2026FinalTae Chongprogress
12/18/2025Preliminary—progress
12/17/2025Structural Stability – Alterations of existing buildings—special
12/17/2025Final—progress
08/25/2025Sprinkler SystemsDARIUSZ LUCZAKspecial
04/28/2025Fire-Resistant Penetrations and JointsHelge Fuhrmannspecial
01/21/2025Structural Stability – Alterations of existing buildingsHelge Fuhrmannspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026B01276868-I1Request digital key ↗
08/18/2026B01354977-I1Request digital key ↗
08/17/2026B01169845-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/17/2026B01218566-P3Open ↗
08/17/2026B01218566-P2Open ↗
08/17/2026B01218566-P1Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01169845-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026B01276868-I1Open ↗
08/18/2026B01354977-I1Open ↗
08/17/2026B01169845-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/28/2026B01276868-I1Open ↗
09/23/2026B01354977-I1Open ↗
08/28/2026B01169845-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B01354977-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01169845-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/20/2026B01276868-I1Open ↗
08/18/2026B01354977-I1Open ↗
08/17/2026B01169845-S1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents8
▸DOB NOWProof of Historic Building7
08/17/2026B01218566-P1Open ↗
08/17/2026B01218566-P3Open ↗
08/17/2026B01218566-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification1
08/17/2026B01169845-I1Open ↗